Home / Browse projects / Thane, Maharashtra / Ameet Anand CO-OP Housing Society Ltd
Ameet Anand CO-OP Housing Society Ltd
By SHARDA VASTU NIRMITEE PVT. LTD.
RG-MH-23451 · RERA P51700078763 · Last updated on MahaRERA portal: 2 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 25.00 crore secured on the land, in favour of AU SMALL FINANCE BANK LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ameet Anand CO-OP Housing Society Ltd is a Others project by SHARDA VASTU NIRMITEE PVT. LTD. in Thane, Maharashtra, registered with MahaRERA as P51700078763 on 13 Jan 2025. Possession is promised by 31 Dec 2028. 2 of the 47 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameAmeet Anand CO-OP Housing Society Ltd
- TypeOthers
- Location
- Sector 2
- Panchpakhadi
- Thane West
- Thane (M Corp.)
- Thane
- 400602
- Pincode400602
- RERA no.P51700078763
- ReraGenie IDRG-MH-23451
Builder
- NameSHARDA VASTU NIRMITEE PVT. LTD.
- Entity typeCompany
- CINU45400MH2010PTC209309
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsANKIT HEMENDRA SHAH, MAHESH MAVJI SHARDA
- Managing DirectorHEMENDRA MAVJI SHAH
- Other registrations5 more →
- Completed4 of 6
- Past their filed date1
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on13 Jan 2025
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed56 files
Current status
Figures as on 2 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Ameet Anand Co Op Housing Society Ltd | NA | 11 | 7 | 32 | 15 | 47 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 53%.
Ameet Anand Co Op Housing Society Ltd: 26% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 53% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 22% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed63
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Ameet Anand CO Op Hsg Soc Ltd | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Ameet Anand Co Op Housing Society Ltd | NA | Rs 28.80 cr | Rs 9.84 cr |
| - | NA | Rs 3.20 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAKARAND TORASKAR |
| Engineer | EPICONS CONSULTANTS PVT LTD |
| Engineer | Ganesh Chaudhary |
| Chartered Accountant | ROSHAN GAWDE & CO |
| Chartered Accountant | A K O R D & CO |
| Partner | Role in project |
|---|---|
| SHARDA VASTU NIRMITEE PVT. LTD. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Nov 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Ameet Anand Q4 .pdf | 2 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Ameet Anand Q4 .pdf | 2 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Q4 FY 25-26 Ameet Anand.pdf | 2 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - ANNEXURE A - Q3.pdf | 5 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Signed and Stamp Q3.pdf | 5 Feb 2026 |
| Withdrawal Update Form 3File: AA - FORM 3 CA CF.pdf | 5 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - AA.pdf | 6 Jan 2026 |
| Withdrawal Update Form 1File: Final Form 1 Ameet Anand.pdf | 29 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2 - EPICONS - AA - ANNEXURE B.pdf | 29 Nov 2025 |
| Withdrawal Update Form 3File: FORM 3 - AA Signed_organized.pdf | 29 Nov 2025 |
| Form 1File: FORM 1 - TORASKAR - Q4.pdf | 22 Aug 2025 |
| Form 2File: FORM 2 Engineer Certificate.pdf | 22 Aug 2025 |
| Form 3File: Form 3 Ameet Anand_compressed.pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Q4 Disclosure of Sold or Unsold Inventory (1).pdf | 22 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1 - CF - MAKARAND TORASKAR.pdf | 21 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 - EPICON - Q1.pdf | 21 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 AA_compressed.pdf | 21 Aug 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A - AA.pdf | 30 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - TORASKAR - Q4.pdf | 12 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ameet Anand_compressed.pdf | 12 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf | 12 May 2025 |
| Disclosure of sold/ booked inventoryFile: Q4 Disclosure of Sold or Unsold Inventory (1).pdf | 12 May 2025 |
| CERSAI detailsFile: Repot_Asset Based Search.pdf | 23 Dec 2024 |
| CERSAI detailsFile: Report_Debtor Based.pdf | 23 Dec 2024 |
| Other - TechnicalFile: Order No 50-2024_One Plot One Registration.pdf | 18 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: Revised_Non-Encumbrance Concerned to Finance.pdf | 17 Dec 2024 |
| Details of encumbrances concerned to LegalFile: Revised_Non-Encumbrance Concerned to Finance.pdf | 17 Dec 2024 |
| Other - TechnicalFile: CC Verification mail.pdf | 5 Dec 2024 |
| Proforma of Allotment letterFile: AL_REVISED_V1.pdf | 28 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_form 3_At the time of registration_compressed.pdf | 28 Nov 2024 |
| Deviation Report with respect to Allotment letterFile: Al_Deviation Report_V1.pdf | 28 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: AFS_Deviation Report_V1.pdf | 28 Nov 2024 |
| Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf | 28 Nov 2024 |
| Building plan approvalFile: CC.pdf | 25 Nov 2024 |
| Building plan approvalFile: sanction Layout_Compress.pdf | 25 Nov 2024 |
| Layout approvalFile: sanction Layout_Compress.pdf | 25 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: sanction Layout_Compress.pdf | 25 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: sanction Layout_Compress.pdf | 25 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: CC.pdf | 25 Nov 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC_Revised.pdf | 25 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Hemendra Shah.pdf | 25 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ankit Shah.pdf | 25 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Mahesh Shah.pdf | 25 Nov 2024 |
| PAN CardFile: 1 PAN Card (4).pdf | 22 Nov 2024 |
| Copy of the legal title reportFile: Final Legal title.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Annexure K-Non-Encumbrance Concerned to Finance.pdf | 22 Nov 2024 |
| Declaration in FORM BFile: 10 - Form B- PROMOTER.pdf | 22 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - MAKRAND TOARASKAR.pdf | 22 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf | 22 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 22 Nov 2024 |
| CERSAI detailsFile: Revised_Debtor Based Declaration.pdf | 22 Nov 2024 |
| CERSAI detailsFile: Revised_Asset Based Declaration.pdf | 22 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about seperate bank Ac_On Promoter Letterhead.pdf | 22 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Annexure K-Non-Encumbrance Concerned to Finance.pdf | 22 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B_Opening of RERA designated Bank Account by Bank Manager_On letterhead of Bank.pdf | 22 Nov 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure For SecuredUnsecured Finance Availed For The Project.pdf | 22 Nov 2024 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| JEEVAN CHS LTD | RAVI COMPOUND PANCHPAKHADI | 41 | Completed | Oct 2022 | Late, Jan 2023 |
| MAITHILI CHS LTD | RAVI COMPOUND PANCHPAKHADI THANE | 26 | Completed | Mar 2019 | Feb 2019 |
| GANESH KRIPA | NEAR GURUKUL SOCIETY PANCHPAKHADI THANE WEST | 17 | Completed | Aug 2016 | May 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Ameet Anand CO-OP Housing Society Ltd on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Thane West7,600+ in Thane
Stellar
Trimity Realty LLP
SAMRIN HERITAGE
SAMRIN INFRA PRIVATE LIMITED
L&T Realty Vayam Tower 3
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
L&T Realty Vayam Tower 4
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
Codename LIT Tower A
Camrose Realtors Private Limited
Codename LIT Tower B
Camrose Realtors Private Limited
See every Thane project, with the district possession charts
Builder: SHARDA VASTU NIRMITEE PVT. LTD.
SHARDA VASTU NIRMITEE PVT. LTD. has 6 registrations on MahaRERA, including Maithili and JEEVAN CHS LTD. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Ameet Anand CO-OP Housing Society Ltd is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ameet Anand CO-OP Housing Society Ltd?
The registered promoter entity is SHARDA VASTU NIRMITEE PVT. LTD., a company as per the filing. Its CIN U45400MH2010PTC209309 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ameet Anand CO-OP Housing Society Ltd?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Ameet Anand CO-OP Housing Society Ltd?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ameet Anand CO-OP Housing Society Ltd?
The professionals named in the filing: Architect: MAKARAND TORASKAR; Engineer: EPICONS CONSULTANTS PVT LTD; Engineer: Ganesh Chaudhary; Chartered Accountant: ROSHAN GAWDE & CO; Chartered Accountant: A K O R D & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ameet Anand CO-OP Housing Society Ltd?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback