Registration lapsed No litigation declared Others project

Ambrosia and Aster

By Jangid Properties

RG-MH-25580 · RERA P51700007248 · Last updated on MahaRERA portal: 19 Apr 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 72 months past the filed date
  • 24 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2020Possession promised72 months past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 92%
24Complaints at MahaRERAon this registration
Jump to the 25 documents Report an error

Ambrosia and Aster is a Others project by Jangid Properties in Thane, Maharashtra, registered with MahaRERA as P51700007248 on 17 Aug 2017. Possession was promised by 29 Oct 2020 and is now 72 months past that date. The completion date has moved by 18 months from the original filing. 24 complaints are on record with the regulator.

At a glance

Project

  • NameAmbrosia and Aster
  • TypeOthers
  • Location
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700007248
  • ReraGenie IDRG-MH-25580

Builder

  • NameJangid Properties
  • Entity typePartnership
  • PartnersOmprakash L Jangid, Purshottam L Jangid, Leelaram S Jangid
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

72 months past promisethis monthRegisteredAug 2017First promiseApr 2019Revised toOct 2020

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Aug 2017
  • Promised completion29 Oct 2020
  • Revised completionRevised to 29 Oct 2020 (originally 30 Apr 2019)
  • Buildings2 building records
  • Documents filed25 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AmbrosiaNA200000
AsterNA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 92%.

Ambrosia67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Aster67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 19 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes75%

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered67
BuildingClosed/CoveredTotal
Ambrosia3434
Aster3333

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,250 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11907.62
Proposed, not sanctioned10,408 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSurya Shopping center, Mira Road East

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTejs Architect and Consultants
EngineerDesai and associates
PartnerRole in project
Jangid Properties-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700001880Apr 2019 → Apr 2020

Reason as filed by the promoterScarcity of Material & Funds

Complaints filed with MahaRERA24

Case no.ComplainantRespondentFiled
CC006000000056141ABDUS SATTAR MOLLAAMRIT L JANGID11/10/2018
CC006000000089521Riyaz Rafiq ShekhaniM/s. Jangid Properties01/06/2019
CC006000000194144Mr. Saiyed Sharafat AliM/s. Jangid Group of Companies23/09/2020
CC006000000198730Mr. Khalil Ahmed KhanM/s. Jangid Properties19/10/2021
CC006000000078788Arvind B. SinghJangid Properties05/04/2019
CC006000000141131Samira Azher BegJangid Properties02/10/2019
CC006000000161254Farhat Afshan Niyaz AhmedJangid Properties14/10/2019
CC006000000171502Ishaque Qasimali ShaikhJangid Properties11/11/2019
CC006000000171943usufe abdul latif shaikaJangid Properties21/12/2019
CC006000000182043Mohd Shakeel Haji Siddique NagoriJangid Properties Pvt Ltd01/01/2020
CC006000000192117Sharafat Hussain QureshJangid Properties Pvt Ltd09/01/2020
CC006000000192129Mohd Ali Haji Kasam ChhawaniwalaJangid Properties Pvt Ltd10/01/2020
CC006000000192363Firozi KilledarJangid Properties30/01/2020
CC006000000192364Khateeb Ahmed KhanJangid Properties30/01/2020
CC006000000194653Mr. Faizahamad ShaikhM/s Jangid Properties24/10/2020
CC006000000193468RIYAZ RAFIQ SHEKHANIJangid Properties17/07/2020
CC006000000195026Rizwan Ismail NaguthaneM/s. Jangid Properties27/11/2020
CC006000000196304Mohammad Arif ShaikhM/s Jangid Properties08/03/2021
CC006000000196639Mr. Abdul Hamid ShaikhMs Jangid Properties06/04/2021
CC006000000199001Jangid PropertiesSaiyed Sharafat Ali15/11/2021
CC006000000194626Mudassir Zaheer PawaleM/s Jangid Properties22/10/2020
CC006000000303300Mohammed Hussain ShaikhM/s. Jangid Properties11/11/2022
CC006000000303209Shalini RajputM/S JANGID PROPERTIES03/12/2022
CC12400432Mohammad Ismail Mohd Kasam ChhawaniwalaJangid Properties16/10/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Apr 2024

Documents filed25

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Aster OC - 4-4-24.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: JP Amb Ast- Form 2A Jun 19.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: JP Amb Ast- Form 2A Sep 19.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: JP Amb Ast- Form 2A Dec 19.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: JP Amb Ast- Form 2A Mar 20.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: JP Amb Ast- Form 2A Jun 20.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: JP Amb Ast- Form 2A Sep 20.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: JP Amb Ast- Form 2A Dec 20.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: JP Amb Ast- Form 2A Mar 21.pdf9 Oct 2021
Certificates of CA (Form 5)File: JP.PDF14 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: Scan10002.PDF11 Jun 2019
Building plan approvalFile: Ambrosia - CC-JP.pdf30 Jul 2017
Building plan approvalFile: Aster- CC-JP.pdf30 Jul 2017
Layout approvalFile: JP Layout Aster Ambrosia.pdf30 Jul 2017
PAN CardFile: JP PAN.pdf30 Jul 2017
Copy of the legal title reportFile: AmbrosiaAsterTCJP.pdf30 Jul 2017
Details of encumbrancesFile: Ambrosia Aster non enu.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: JP Layout Aster Ambrosia.pdf30 Jul 2017
Building Plan Approval (IOD)File: Ambrosia - CC-JP.pdf30 Jul 2017
Building Plan Approval (IOD)File: Aster- CC-JP.pdf30 Jul 2017
Declaration in FORM BFile: Form B Ast Amb.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Form 1.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Form 2.pdf30 Jul 2017
Certificates of CA (Form 3)File: JP Am Ast CA.pdf30 Jul 2017
Proforma of Allotment letterFile: Amb Ast Agree alot.pdf30 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Orchid And TulipJangid Enclave. Opp Laxmi Park. Near Kanakia Cinemax. MiraRoad East. Thane 401107251CompletedMay 2011May 2011

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 18 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ambrosia and Aster on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mira-Bhayandar (M Corp.)7,600+ in Thane

2 kmAmbrosia and AsterCompleted 106Lapsed / revoked 79Other 109Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: Jangid Properties

Jangid Properties has 2 registrations on MahaRERA, including Arcadia and Ambrosia and Aster. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Ambrosia and Aster shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Ambrosia and Aster is delayed beyond 29 Oct 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ambrosia and Aster?

The registered promoter entity is Jangid Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ambrosia and Aster?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ambrosia and Aster?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ambrosia and Aster?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ambrosia and Aster?

The professionals named in the filing: Architect: Tejs Architect and Consultants; Engineer: Desai and associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ambrosia and Aster?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ambrosia and Aster. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ambrosia and Aster to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.