Ambit Primoris

By AMBIT URBANSPACE

RG-MH-23657 · RERA P51800078969 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
28 of 183Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Ambit Primoris is a Others project by AMBIT URBANSPACE in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078969 on 24 Jan 2025. Possession is promised by 31 Dec 2027. 155 of the 183 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameAmbit Primoris
  • TypeOthers
  • Location
    • S V Road
    • Kandivali West
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800078969
  • ReraGenie IDRG-MH-23657

Builder

  • NameAMBIT URBANSPACE
  • Entity typePartnership
  • Declared earlier projects3 →

Key dates

this monthRegisteredJan 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed87 files

Current status

85%155 of 183 units booked

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B wingNA2615574097
A wingNA2615563086

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

B wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed153

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots153
Closed/Covered153
BuildingClosed/CoveredTotal
B wing7878
A wing7575

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,014 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Poddar Apartment CHSLMaladMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI8005.41
Proposed, not sanctioned8,005 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Ganapati Tower, Thakur Village, Kandivali East, Mumbai Maharashtra.400101

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSkyline Inframart Consultants LLP
EngineerS Ayyangar Associates
Chartered AccountantMallawat & Associates
PartnerRole in project
AMBIT URBANSPACE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1.pdf23 Apr 2026
Form 2File: FORM 2.pdf23 Apr 2026
Form 3File: Ambit Urbanspace - Form 3 (March 26).pdf23 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory.pdf23 Apr 2026
Form 1File: Ambit Urbanspace - Form -1.pdf16 Mar 2026
Form 2File: Ambit Urbanspace - Form - 2.pdf16 Mar 2026
Form 3File: Ambit Urbanspace - Form - 3.pdf16 Mar 2026
Disclosure of Sold and Booked InventoryFile: Ambit Urbanspace - Sold and booked Inventory.pdf16 Mar 2026
Form 1File: Q1 25-26 Form -1 Primoris.pdf22 Dec 2025
Form 2File: Q1 25-26 Form -2 Primoris.pdf22 Dec 2025
Form 3File: Q1 25-26 Form -3 - CA Certificate Primoris.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: Ambit Urbanspace Sold and Booked Inventory June 25.pdf22 Dec 2025
Form 1File: Form - 1 (july 2025 to sept 2025).pdf22 Dec 2025
Form 2File: Form - 2 Ambit Primoris Sep 25.pdf22 Dec 2025
Form 3File: Form - 3 Ambit Primoris Sep 25.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: Ambit Urbanspace - Sold and Booked Inventory Sep 25.pdf22 Dec 2025
Form 1File: Ambit Urbanspace - Form 1.pdf18 Aug 2025
Form 2File: Ambit Urbanspace - Form - 2.pdf18 Aug 2025
Form 3File: Ambit Urbanspace - Form 3.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Ambit Urbanspace - Disclsoure of Sold and Booked Inventory (March 25).pdf18 Aug 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Revised AFS_compressed.pdf9 Apr 2025
Proforma of Agreement for saleFile: Revised AFS.pdf9 Apr 2025
Other - FinanceFile: Declaration of promoter about zero land cost.pdf31 Dec 2024
Other - FinanceFile: Declaration of promoter Non Opening of Separate Bank Account 1.pdf31 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: SRA Email to MahaRERA for CC confirmation.pdf14 Dec 2024
Declaration about Commencement CertificateFile: Declaration About the Commencement Certificate.pdf1 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation of Alottment Letter.pdf1 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation of Agreement of Sale.pdf1 Dec 2024
Building plan approvalFile: Ambit Primoris - IOA.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_20.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_19.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_18.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_17.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_16.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_15.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_14.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_13.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_12.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_11.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_10.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_09.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_08.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_07.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_06.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_05.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_04.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_03.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_02.pdf30 Nov 2024
Layout approvalFile: SRA Plans- Ambit Urbanspace_01.pdf30 Nov 2024
PAN CardFile: PAN Card - Ambit Urbanspace.pdf30 Nov 2024
Copy of the legal title reportFile: Ambit Primoris - Title Certificate_Compressed.pdf30 Nov 2024
Details of encumbrances concerned to FinanceFile: Declaration about details of encumbrances concerned to Finance_Legal.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_18.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_19.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_17.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_16.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_15.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_14.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_13.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_12.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_11.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_10.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_09.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_08.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_07.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_06.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_05.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_04.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_03.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_02.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_01.pdf30 Nov 2024
Copy of Layout Approval (in case of layout)File: SRA Plans- Ambit Urbanspace_20.pdf30 Nov 2024
Proforma of Allotment letterFile: Allotment Letter - Revised Draft.pdf30 Nov 2024
Declaration in FORM BFile: Form B - Builders.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambit Premoris - Project Form III dated (Modified as per RERA).pdf30 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf30 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Ambit Primoris - CC.pdf30 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Ambit Primoris - IOA.pdf30 Nov 2024
CERSAI detailsFile: Undertaking of Security Interest.pdf30 Nov 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
THE PALAZZOP51800015924Kalina Santacruz East, Mumbai Suburban-Apr 2018Certificate SignedDec 2026Registered original: Dec 2022Dec 2022
Ambit VistaP51800052265Santacruz East, Mumbai Suburban96Aug 2023OngoingDec 2025Not delivered
BlumenP51800013365Vikhroli West, Mumbai Suburban-Sep 2017CompletedDec 2024Registered original: Dec 2023Dec 2023

How this compares with Mumbai Suburban

85%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ambit Primoris on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali West6,700+ in Mumbai Suburban

2 kmAmbit PrimorisCompleted 126Lapsed / revoked 80Other 153Dot size: filed unitsN

Filed coordinates, straight-line distance. 359 registered projects within 2 km.

Builder: AMBIT URBANSPACE

AMBIT URBANSPACE has 1 registration on MahaRERA, including Ambit Primoris. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ambit Primoris is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ambit Primoris?

The registered promoter entity is AMBIT URBANSPACE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ambit Primoris?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ambit Primoris?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ambit Primoris?

The professionals named in the filing: Architect: Skyline Inframart Consultants LLP; Engineer: S Ayyangar Associates; Chartered Accountant: Mallawat & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ambit Primoris?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ambit Primoris. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ambit Primoris to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.