Home / Browse projects / Mumbai Suburban, Maharashtra / Ambit Vista
Ambit Vista
By Ambit Builders & Developers
RG-MH-06258 · RERA P51800052265 · Last updated on MahaRERA portal: 14 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 1 completed earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ambit Vista is a Residential / Group Housing project by Ambit Builders & Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052265 on 9 Aug 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 78 of the 103 units on this registration are recorded sold or booked, and 16 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameAmbit Vista
- TypeResidential / Group Housing
- Location
- Prabhat Colony
- Santacruz East
- Vileparle
- Andheri
- Mumbai Suburban
- 400055
- Pincode400055
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800052265
- ReraGenie IDRG-MH-06258
Builder
- NameAmbit Builders & Developers
- Entity typePartnership
- PartnersRajendra Prasad Sharma, Karan Rajendra Sharma, Sahil Rajendra Sharma
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Aug 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings4 building records
- Documents filed185 files
Current status
Figures as on 14 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 8 | 8 | 28 | 5 | 33 |
| B Wing | NA | 8 | 8 | 14 | 7 | 21 |
| C Wing | NA | 8 | 8 | 14 | 0 | 14 |
| D Wing | NA | 8 | 8 | 35 | 0 | 35 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 90%.
A Wing50%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 57% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B Wing50%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 57% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C Wing55%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D Wing55%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Saibaba Cooperative Housing Society Limited | Vileparle | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C Wing | NA | Rs 14.79 cr | Rs 10.76 cr |
| D Wing | NA | Rs 14.79 cr | Rs 10.76 cr |
| A Wing | NA | Rs 13.38 cr | Rs 9.73 cr |
| B Wing | NA | Rs 13.38 cr | Rs 9.73 cr |
| - | NA | Rs 2.96 cr | Rs 2.56 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Skyline Inframart Consultants LLP |
| Engineer | Mohammad Akram Mistry AKRAM MESTRY |
| Engineer | S. Ayyangar Associates |
| Chartered Accountant | Mallawat & Associates |
| Chartered Accountant | Govind Gopal Sharma |
| Chartered Accountant | CA Sunil Kumar Sharma |
| Partner | Role in project |
|---|---|
| Ambit Builders & Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe had Registered the said Project under MahaRera on 9th August 2023 with the estimated date of completion being 31st December 2025. The completion date was based on Certain Assumptions of Construction Programs. The said Project consists of One Rehab Building and Four Wings of Sale which are interconnected. Our Rehab wing is almost completed and application is being put up for obtaining Occupation Certificate. We have also completed RCC work of all wings and finishing work of 3 wings is in full swing. However during the Constructions of A wing the Retaining wall for Basement has been broken an
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000480134 | Vishal Mahakul | Ambit Builders and Developers | 23/04/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed185
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 185 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ABD - FORM 1 (JUNE 26).pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: ABD - FORM 1 (JUNE 26).pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: ABD - FORM 1 (JUNE 26).pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: ABD - FORM 1 (JUNE 26).pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form -2 (April 2026 to June 2026) Ambit Vista.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form -2 (April 2026 to June 2026) Ambit Vista.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form -2 (April 2026 to June 2026) Ambit Vista.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form -2 (April 2026 to June 2026) Ambit Vista.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form-III (April 2026 to June 2026).pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form-III (April 2026 to June 2026).pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form-III (April 2026 to June 2026).pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form-III (April 2026 to June 2026).pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: ABD - FORM 1 (JUNE 26).pdf | 28 Jul 2026 |
| Withdrawal Update Form 1File: ABD - FORM 1 (JUNE 26).pdf | 28 Jul 2026 |
| Withdrawal Update Form 2File: ABD - Form-II (April 2026 to June 2026).pdf | 28 Jul 2026 |
| Withdrawal Update Form 2File: ABD - Form-II (April 2026 to June 2026).pdf | 28 Jul 2026 |
| Withdrawal Update Form 3File: Form-III (April 2026 to June 2026).pdf | 28 Jul 2026 |
| Withdrawal Update Form 3File: Form-III (April 2026 to June 2026).pdf | 28 Jul 2026 |
| Form 2A (FY 2025-2026)File: ABD - FORM 2A Quality Certicate as 31st March 2026.pdf | 28 Jul 2026 |
| Withdrawal Update Form 1File: ABD - FORM 1.pdf | 27 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Dec 25.pdf | 27 Jul 2026 |
| Withdrawal Update Form 3File: ABD - Form 3.pdf | 27 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 (Architect Certificate) Revised.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Dec 25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Dec-25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 (Architect Certificate) Revised.pdf | 9 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Dec 25.pdf | 9 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Dec-25.pdf | 9 Jan 2026 |
| Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf | 17 Dec 2025 |
| Form 2A (FY 2024-2025)File: ABD - FORM 2A (March 25).pdf | 17 Dec 2025 |
| Form 5 (FY 2024-2025)File: ABD- FORM 5 (March 25).pdf | 17 Dec 2025 |
| Form 1File: Form 1 Architect's Certificate Sep-23.pdf | 15 Dec 2025 |
| Form 2File: Form 2 Engineer's Certificate Sep-23.pdf | 15 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Project Ambit Vista - Sold & Booked (Sep 23).pdf | 15 Dec 2025 |
| Form 3File: Form 3 CA Certificate Sep-23.pdf | 15 Dec 2025 |
| Form 1File: Form 1 Architect's Certificate Dec-23.pdf | 15 Dec 2025 |
| Form 2File: Form 2 Engineer's Certificate Dec-23.pdf | 15 Dec 2025 |
| Form 3File: Form 3 CA Certificate Dec-23.pdf | 15 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Project Ambit Vista - Sold & Booked (Dec 23).pdf | 15 Dec 2025 |
| Form 1File: Form 1 Architect's Certificate Mar-24.pdf | 15 Dec 2025 |
| Form 2File: Form 2 Engineer's Certificate Mar-24.pdf | 15 Dec 2025 |
| Form 3File: Form 3 CA Certificate Mar-24.pdf | 15 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Project Ambit Vista - Sold & Booked (March 2024).pdf | 15 Dec 2025 |
| Form 1File: Form 1 Architect's Certificate Jun-24.pdf | 15 Dec 2025 |
| Form 2File: Form 2 Engineer's Certificate Jun-24.pdf | 15 Dec 2025 |
| Form 3File: Form 3 CA Certificate Jun-24.pdf | 15 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Project Ambit Vista - Sold & Booked (June 24).pdf | 15 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Project Ambit Vista - Sold & Booked (Sep 24).pdf | 15 Dec 2025 |
| Form 1File: Form 1 Architect's Certificate Sep-24.pdf | 15 Dec 2025 |
| Form 2File: Form 2 Engineer's Certificate Sep-24.pdf | 15 Dec 2025 |
| Form 3File: Form 3 CA Certificate Sep-24.pdf | 15 Dec 2025 |
| Form 3File: Form 3 CA Certificate Dec-24.pdf | 15 Dec 2025 |
| Form 1File: Form 1 Architect's Certificate Dec-24.pdf | 15 Dec 2025 |
| Form 2File: Form 2 Engineer's Certificate Dec-24.pdf | 15 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Project Ambit Vista - Sold & Booked (Dec 24).pdf | 15 Dec 2025 |
| Form 1File: Form 1 Architect's Certificate Sep-25.pdf | 15 Dec 2025 |
| Form 2File: Form 2 Engineer's Certificate Sep-25.pdf | 15 Dec 2025 |
| Form 3File: Form 3 CA Certificate Sep-25.pdf | 15 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Project Ambit Vista - Sold & Booked (Sep 25).pdf | 15 Dec 2025 |
| Form 5 (FY 2023-2024)File: ABD - RERA FORM 5.pdf | 15 Dec 2025 |
| Form 1File: ABD Form - 1 (April 2025 to June 2025).pdf | 2 Sep 2025 |
| Form 2File: ABD Form 2 - Engineer Certificate (Apr to Jun 25).pdf | 2 Sep 2025 |
| Form 3File: Project Ambit Vista - Executable Form 3 (June-25).pdf | 2 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: ABD - Disclosure of Sold and Booked Inventory (June 25).pdf | 2 Sep 2025 |
| Form 1File: ABD - Form 1.pdf | 8 Aug 2025 |
| Form 2File: ABD - Form 2.pdf | 8 Aug 2025 |
| Form 3File: ABD - Form 3.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: ABD - Disclosure of Sold and Booked Inventory.pdf | 8 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ambit Vista - Form_1_Q3_FY 2024-25_compressed.pdf | 9 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambit Vista - Form_3_Q3_FY 2024-25_compressed.pdf | 9 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ambit Vista - Form_2_Q3_FY 2024-25.pdf | 9 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ambit Vista - Form_1_Q2_FY 2024-25.pdf | 26 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambit Vista - Form_3_Q2_FY 2024-25_11zon.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ambit Vista - Form_2_Q2_FY 2024-25.pdf | 26 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambit Vista - Form 3 (Q1 FY 2024-25)_Compressed.pdf | 9 Oct 2024 |
| Proforma of Agreement for saleFile: Ambit Vista - Draft AFS Revised.pdf | 9 Oct 2024 |
| Copy of the legal title reportFile: Final Title Certificate 17-05-2024_Compressed.pdf | 9 Oct 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Grievance Redressal Cell.pdf | 9 Oct 2024 |
| Copy of the legal title reportFile: Final Title Certificate 17-05-2024_Compressed.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambit Vista - Form 3 (Q1 FY 2024-25)_Compressed.pdf | 9 Oct 2024 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Ambit PrimorisP51800078969 | Kandivali West, Mumbai Suburban | 183 | Jan 2025 | Ongoing | Dec 2027 | Not due yet |
| THE PALAZZOP51800015924 | Kalina Santacruz East, Mumbai Suburban | - | Apr 2018 | Ongoing | Dec 2026Registered original: Dec 2022 | Not due yet |
| BlumenP51800013365 | Vikhroli West, Mumbai Suburban | - | Sep 2017 | Completed | Dec 2024Registered original: Dec 2023 | Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 185 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Ambit Vista on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Santacruz East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 391 registered projects within 2 km.
ATMIYA CENTRIA
UPTURN PROPERTIES LLP
NINE ARCS
ARIHANT CONSTRUCTION CO
Trinity Towers
Jet Speed Realtors Private Limited
Bluemoon Annexe
MUDASSAR BUILDERS & DEVELOPERS
W55
DVASUYASH CONSTRUCTION 1 LLP
Sumit Bhakti
Sumit Pragati Ventures LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Ambit Builders & Developers
Ambit Builders & Developers has 1 registration on MahaRERA, including Ambit Vista. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Ambit Vista is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ambit Vista?
The registered promoter entity is Ambit Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ambit Vista?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Ambit Vista?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Ambit Vista?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ambit Vista?
The professionals named in the filing: Architect: Skyline Inframart Consultants LLP; Engineer: Mohammad Akram Mistry AKRAM MESTRY; Engineer: S. Ayyangar Associates; Chartered Accountant: Mallawat & Associates; Chartered Accountant: Govind Gopal Sharma; Chartered Accountant: CA Sunil Kumar Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ambit Vista?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback