AMBIKA RESIDENCY

By NIRAJ BALKRISHNA MOHOLKAR

RG-MH-19819 · RERA P52700003021 · Last updated on MahaRERA portal: 26 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
50 of 77Construction stages doneacross 7 buildings; furthest along: Basement (if any), 0%
28 of 86Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 315 documents Report an error

AMBIKA RESIDENCY is a Others project by NIRAJ BALKRISHNA MOHOLKAR in Satara, Maharashtra, registered with MahaRERA as P52700003021 on 4 Aug 2017. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 58 of the 86 units on this registration are recorded sold or booked, and 50 of 77 construction stages are filed complete.

At a glance

Project

  • NameAMBIKA RESIDENCY
  • TypeOthers
  • Location
    • SHIRWAL
    • Khandala
    • Satara
    • 412801
  • Pincode412801
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700003021
  • ReraGenie IDRG-MH-19819

Builder

  • NameNIRAJ BALKRISHNA MOHOLKAR
  • Entity typeIndividual
  • GSTIN27AAKFV3801C1ZE

Key dates

10 months past promisethis monthRegisteredAug 2017PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Aug 2017
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings7 building records
  • Documents filed315 files

Current status

67%58 of 86 units booked

Figures as on 26 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA8744044
WING GNA50000
WING ANA11808
WING BNA1110010
WING ENA11505
WING FNA11505
WING D3NA4314014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 26 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

50 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Basement (if any), at 0%.

WING C73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING G0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING E82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING F82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D364%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 26 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
COMPUND WALLYes100%

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10

Land and ownership11

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,818 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Feb 2026
LandownerVillageDistrict
SUHAS PRABHAKAR KASARKhed (CT)Satara
VASTUSHREE BUILDERS AND DEVELOPERSKhed (CT)Satara
EKNATH RAMCHNDRA SHETEShirwalSatara
SUBHADRA BHANDEBhongvaliPune
CHHAYA BALASAHEB VIRShirwalSatara
SEEMA MANGESH MARANEShirwalSatara
VIMAL NAMDEO SHETEShirwalSatara
GANESH NAMDEV SHETEShirwalSatara
VINOD NAMDEV SHETEShirwalSatara
ANITA ASHOK JADHAVShirwalSatara
MAYA GORAKSHNATH PANGAREShirwalSatara

Approvals and building plan

Sanctioning authorityASSISTANT DIRECTOR OF TOWN PLANNING BRANCH ,SATARA
Permissible FSI8625.93
Proposed, not sanctioned7,871 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIRWAL TAL KHADALA DIST SATARA

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR Mrs Swati Suryaji Patil
EngineerMahesh Uttamrao Kadam
EngineerSwapnil Rasane
EngineerAjit Rajput
EngineerSHANKAR LOKHANDE AND ASSOCIATES
Chartered AccountantCA SHUBHAM SALUNKHE
Chartered AccountantVitthal S Jadhav
PartnerRole in project
NIRAJ BALKRISHNA MOHOLKAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Apr 2025

Documents filed315

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 315 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 AMBICA RESIDENCY.pdf26 Feb 2026
Form 2File: FORM 2 AMBIKA RESIDENCY.pdf26 Feb 2026
Form 3File: FORM 3 AMBICA RESIDENCY.pdf26 Feb 2026
Disclosure of Sold and Booked InventoryFile: AMBIKA RESIDENCY.pdf26 Feb 2026
Form 1File: FORM 1 AMBICA RESIDENCY.pdf26 Feb 2026
Form 2File: FORM 2 AMBIKA RESIDENCY.pdf26 Feb 2026
Form 3File: FORM 3 AMBICA RESIDENCY.pdf26 Feb 2026
Disclosure of Sold and Booked InventoryFile: AMBIKA RESIDENCY.pdf26 Feb 2026
Form 1File: FORM 1 AMBICA RESIDENCY.pdf26 Feb 2026
Form 2File: FORM 2 AMBIKA RESIDENCY.pdf26 Feb 2026
Form 3File: FORM 3 AMBICA RESIDENCY.pdf26 Feb 2026
Disclosure of Sold and Booked InventoryFile: AMBIKA RESIDENCY.pdf26 Feb 2026
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Compleation Certificate and Form No 4.pdf24 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing A AMBIKA MAR 2025.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing B AMBIKA MAR 2025.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA MAR 2025.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing D3 AMBIKA MAR 2025.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing E AMBIKA MAR 2025.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing F AMBIKA MAR 2025.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing G AMBIKA MAR 2025.pdf19 Apr 2025
Certificates of CA (Form 3)File: CA - Wing E AMBIKA MAR 2025.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg - AMBIKA MAR 2025.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing B AMBIKA Dec 2024.pdf17 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing G AMBIKA Dec 2024.pdf17 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing F AMBIKA Dec 2024.pdf17 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing E AMBIKA Dec 2024.pdf17 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing D3 AMBIKA Dec 2024.pdf17 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA Dec 2024.pdf17 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing A AMBIKA Dec 2024.pdf17 Feb 2025
Certificates of CA (Form 3)File: Ambika Residency - CA Certificate Dec 2024.pdf17 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ambika Residency - Engineer Certificate Dec 2024.pdf17 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: FROM NO 4 AMBIKA RESIDENCY - FINAL CERTIFICATE.pdf27 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing G AMBIKA SEP 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing F AMBIKA SEP 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing D3 AMBIKA SEP 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA SEP 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing B AMBIKA SEP 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing A AMBIKA SEP 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing G AMBIKA JUN 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing F AMBIKA JUN 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing E AMBIKA JUN 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing D3 AMBIKA JUN 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA JUN 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing B AMBIKA JUN 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing A AMBIKA JUN 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA JUN 2024.pdf9 Nov 2024
Certificates of CA (Form 3)File: Ambika Residency - CA Certificate Jun 2024.pdf9 Nov 2024
Certificates of CA (Form 3)File: Ambika Residency - CA Certificate Sep 2024.pdf9 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ambika Residency - Engineer Certificate Jun 2024.pdf9 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ambika Residency - Engineer Certificate Sep 2024.pdf9 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FROM NO 4 AMBIKA RESIDENCY - FINAL CERTIFICATE.pdf22 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: FROM NO 4 AMBIKA RESIDENCY - FINAL CERTIFICATE.pdf14 Oct 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Collectorate Office Satara Certificate Part Completion.pdf14 Oct 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Ambika - Society Certificate qty 3.pdf23 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing A AMBIKA MAR 2024.pdf21 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing B AMBIKA MAR 2024.pdf21 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA MAR 2024.pdf21 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing D3 AMBIKA MAR 2024.pdf21 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing E AMBIKA MAR 2024.pdf21 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing F AMBIKA MAR 2024.pdf21 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing G AMBIKA MAR 2024.pdf21 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ambika Residency - Engineer Certificate Mar 2024.pdf21 May 2024
Certificates of CA (Form 3)File: Ambika Residency - CA Certificate Mar 2024.pdf21 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ambica Engineer Certificate Final 31122023.pdf11 Jan 2024
Certificates of CA (Form 3)File: RERA Certificate- Vastushree Dec 23.pdf11 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING A AMBIKA RESIDENCY.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING B AMBIKA RESIDENCY.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING C AMBIKA RESIDENCY.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING D3 AMBIKA RESIDENCY.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING E AMBIKA RESIDENCY.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING F AMBIKA RESIDENCY.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING G AMBIKA RESIDENCY.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 06 2023 FROM 1 WING D3 AMBIKA RESIDENCY.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING B.pdf3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING C.pdf3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING D3.pdf3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING E.pdf3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING F.pdf3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING G.pdf3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING A.pdf3 Nov 2023

How this compares with Satara

67%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep AMBIKA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIRWAL1,100+ in Satara

Builder: NIRAJ BALKRISHNA MOHOLKAR

NIRAJ BALKRISHNA MOHOLKAR has 1 registration on MahaRERA, including AMBIKA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What does it mean that AMBIKA RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AMBIKA RESIDENCY is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AMBIKA RESIDENCY?

The registered promoter entity is NIRAJ BALKRISHNA MOHOLKAR, an individual as per the filing. Its GSTIN 27AAKFV3801C1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AMBIKA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AMBIKA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AMBIKA RESIDENCY?

The professionals named in the filing: Architect: AR Mrs Swati Suryaji Patil; Engineer: Mahesh Uttamrao Kadam; Engineer: Swapnil Rasane; Engineer: Ajit Rajput; Engineer: SHANKAR LOKHANDE AND ASSOCIATES; Chartered Accountant: CA SHUBHAM SALUNKHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMBIKA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMBIKA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMBIKA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.