Home / Browse projects / Satara, Maharashtra / AMBIKA RESIDENCY
AMBIKA RESIDENCY
RG-MH-19819 · RERA P52700003021 · Last updated on MahaRERA portal: 26 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AMBIKA RESIDENCY is a Others project by NIRAJ BALKRISHNA MOHOLKAR in Satara, Maharashtra, registered with MahaRERA as P52700003021 on 4 Aug 2017. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 58 of the 86 units on this registration are recorded sold or booked, and 50 of 77 construction stages are filed complete.
At a glance
Project
- NameAMBIKA RESIDENCY
- TypeOthers
- Location
- SHIRWAL
- Khandala
- Satara
- 412801
- Pincode412801
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700003021
- ReraGenie IDRG-MH-19819
Builder
- NameNIRAJ BALKRISHNA MOHOLKAR
- Entity typeIndividual
- GSTIN27AAKFV3801C1ZE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Aug 2017
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings7 building records
- Documents filed315 files
Current status
Figures as on 26 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING C | NA | 8 | 7 | 44 | 0 | 44 |
| WING G | NA | 5 | 0 | 0 | 0 | 0 |
| WING A | NA | 1 | 1 | 8 | 0 | 8 |
| WING B | NA | 1 | 1 | 10 | 0 | 10 |
| WING E | NA | 1 | 1 | 5 | 0 | 5 |
| WING F | NA | 1 | 1 | 5 | 0 | 5 |
| WING D3 | NA | 4 | 3 | 14 | 0 | 14 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 26 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
50 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Basement (if any), at 0%.
WING C73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING G0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING A73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING E82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING F82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING D364%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 26 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 50% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| COMPUND WALL | Yes | 100% |
Parking filed10
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership11
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SUHAS PRABHAKAR KASAR | Khed (CT) | Satara |
| VASTUSHREE BUILDERS AND DEVELOPERS | Khed (CT) | Satara |
| EKNATH RAMCHNDRA SHETE | Shirwal | Satara |
| SUBHADRA BHANDE | Bhongvali | Pune |
| CHHAYA BALASAHEB VIR | Shirwal | Satara |
| SEEMA MANGESH MARANE | Shirwal | Satara |
| VIMAL NAMDEO SHETE | Shirwal | Satara |
| GANESH NAMDEV SHETE | Shirwal | Satara |
| VINOD NAMDEV SHETE | Shirwal | Satara |
| ANITA ASHOK JADHAV | Shirwal | Satara |
| MAYA GORAKSHNATH PANGARE | Shirwal | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR Mrs Swati Suryaji Patil |
| Engineer | Mahesh Uttamrao Kadam |
| Engineer | Swapnil Rasane |
| Engineer | Ajit Rajput |
| Engineer | SHANKAR LOKHANDE AND ASSOCIATES |
| Chartered Accountant | CA SHUBHAM SALUNKHE |
| Chartered Accountant | Vitthal S Jadhav |
| Partner | Role in project |
|---|---|
| NIRAJ BALKRISHNA MOHOLKAR | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Nov 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Apr 2025
Documents filed315
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 315 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 AMBICA RESIDENCY.pdf | 26 Feb 2026 |
| Form 2File: FORM 2 AMBIKA RESIDENCY.pdf | 26 Feb 2026 |
| Form 3File: FORM 3 AMBICA RESIDENCY.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: AMBIKA RESIDENCY.pdf | 26 Feb 2026 |
| Form 1File: FORM 1 AMBICA RESIDENCY.pdf | 26 Feb 2026 |
| Form 2File: FORM 2 AMBIKA RESIDENCY.pdf | 26 Feb 2026 |
| Form 3File: FORM 3 AMBICA RESIDENCY.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: AMBIKA RESIDENCY.pdf | 26 Feb 2026 |
| Form 1File: FORM 1 AMBICA RESIDENCY.pdf | 26 Feb 2026 |
| Form 2File: FORM 2 AMBIKA RESIDENCY.pdf | 26 Feb 2026 |
| Form 3File: FORM 3 AMBICA RESIDENCY.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: AMBIKA RESIDENCY.pdf | 26 Feb 2026 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Compleation Certificate and Form No 4.pdf | 24 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing A AMBIKA MAR 2025.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing B AMBIKA MAR 2025.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA MAR 2025.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing D3 AMBIKA MAR 2025.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing E AMBIKA MAR 2025.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing F AMBIKA MAR 2025.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing G AMBIKA MAR 2025.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: CA - Wing E AMBIKA MAR 2025.pdf | 19 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg - AMBIKA MAR 2025.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing B AMBIKA Dec 2024.pdf | 17 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing G AMBIKA Dec 2024.pdf | 17 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing F AMBIKA Dec 2024.pdf | 17 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing E AMBIKA Dec 2024.pdf | 17 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing D3 AMBIKA Dec 2024.pdf | 17 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA Dec 2024.pdf | 17 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing A AMBIKA Dec 2024.pdf | 17 Feb 2025 |
| Certificates of CA (Form 3)File: Ambika Residency - CA Certificate Dec 2024.pdf | 17 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ambika Residency - Engineer Certificate Dec 2024.pdf | 17 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FROM NO 4 AMBIKA RESIDENCY - FINAL CERTIFICATE.pdf | 27 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing G AMBIKA SEP 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing F AMBIKA SEP 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing D3 AMBIKA SEP 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA SEP 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing B AMBIKA SEP 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing A AMBIKA SEP 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing G AMBIKA JUN 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing F AMBIKA JUN 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing E AMBIKA JUN 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing D3 AMBIKA JUN 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA JUN 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing B AMBIKA JUN 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing A AMBIKA JUN 2024.pdf | 9 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA JUN 2024.pdf | 9 Nov 2024 |
| Certificates of CA (Form 3)File: Ambika Residency - CA Certificate Jun 2024.pdf | 9 Nov 2024 |
| Certificates of CA (Form 3)File: Ambika Residency - CA Certificate Sep 2024.pdf | 9 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ambika Residency - Engineer Certificate Jun 2024.pdf | 9 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ambika Residency - Engineer Certificate Sep 2024.pdf | 9 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FROM NO 4 AMBIKA RESIDENCY - FINAL CERTIFICATE.pdf | 22 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FROM NO 4 AMBIKA RESIDENCY - FINAL CERTIFICATE.pdf | 14 Oct 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Collectorate Office Satara Certificate Part Completion.pdf | 14 Oct 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Ambika - Society Certificate qty 3.pdf | 23 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing A AMBIKA MAR 2024.pdf | 21 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing B AMBIKA MAR 2024.pdf | 21 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing C AMBIKA MAR 2024.pdf | 21 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing D3 AMBIKA MAR 2024.pdf | 21 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing E AMBIKA MAR 2024.pdf | 21 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing F AMBIKA MAR 2024.pdf | 21 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech - Wing G AMBIKA MAR 2024.pdf | 21 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ambika Residency - Engineer Certificate Mar 2024.pdf | 21 May 2024 |
| Certificates of CA (Form 3)File: Ambika Residency - CA Certificate Mar 2024.pdf | 21 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ambica Engineer Certificate Final 31122023.pdf | 11 Jan 2024 |
| Certificates of CA (Form 3)File: RERA Certificate- Vastushree Dec 23.pdf | 11 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING A AMBIKA RESIDENCY.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING B AMBIKA RESIDENCY.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING C AMBIKA RESIDENCY.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING D3 AMBIKA RESIDENCY.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING E AMBIKA RESIDENCY.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING F AMBIKA RESIDENCY.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 WING G AMBIKA RESIDENCY.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 06 2023 FROM 1 WING D3 AMBIKA RESIDENCY.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING B.pdf | 3 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING C.pdf | 3 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING D3.pdf | 3 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING E.pdf | 3 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING F.pdf | 3 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING G.pdf | 3 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FROM 1 SHRI NIRAJ BALKRISHNA MOHOLKAR OTHERS AMBIKA RESIDENCY WING A.pdf | 3 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 315 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AMBIKA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHIRWAL1,100+ in Satara
GRAND AVENUE
ALANKAR REALITIES
Clover Windermere Phase -I
Amalfi Enterprise
PETALS
DINESH VASUDEV BHARGUDE
Nivaan Riviera
Riverfront Developers
AMBIKA VIHAR
MALEKAR TAMBE ASSOCIATES LLP
Quadra Town
Bhujbal Brothers Properties
See every Satara project, with the district possession charts
Builder: NIRAJ BALKRISHNA MOHOLKAR
NIRAJ BALKRISHNA MOHOLKAR has 1 registration on MahaRERA, including AMBIKA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What does it mean that AMBIKA RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if AMBIKA RESIDENCY is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AMBIKA RESIDENCY?
The registered promoter entity is NIRAJ BALKRISHNA MOHOLKAR, an individual as per the filing. Its GSTIN 27AAKFV3801C1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AMBIKA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AMBIKA RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AMBIKA RESIDENCY?
The professionals named in the filing: Architect: AR Mrs Swati Suryaji Patil; Engineer: Mahesh Uttamrao Kadam; Engineer: Swapnil Rasane; Engineer: Ajit Rajput; Engineer: SHANKAR LOKHANDE AND ASSOCIATES; Chartered Accountant: CA SHUBHAM SALUNKHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMBIKA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback