Home / Browse projects / Amravati, Maharashtra / AMBER PARK
AMBER PARK
By AMBER BUILDERS AND DEVELOPERS
RG-MH-01809 · RERA P50300024763 · Last updated on MahaRERA portal: 1 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 5 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AMBER PARK is a Residential / Group Housing project by AMBER BUILDERS AND DEVELOPERS in Amravati, Maharashtra, registered with MahaRERA as P50300024763 on 2 Mar 2020. Possession is promised by 30 Dec 2026.
At a glance
Project
- NameAMBER PARK
- TypeResidential / Group Housing
- Location
- NEAR ARJUN NAGAR
- AMRAVATI
- Amravati (M Corp.)
- 444602
- Pincode444602
- RERA no.P50300024763
- ReraGenie IDRG-MH-01809
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Mar 2020
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed58 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A AND B | NA | 12 | 0 | 0 | 0 | 0 |
| WING C AND D | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 1 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
WING A AND B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING C AND D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 1 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed537
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAHUL FARKADE |
| Engineer | SAGAR WANKHADE |
| Chartered Accountant | KALOTI & LATHIYA CHARTERED ACCOUNTANTS |
| Chartered Accountant | V S JAKHOTIYA & CO CHARTERED ACCOUNTANTS |
| Partner | Role in project |
|---|---|
| AMBER BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 May 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 May 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Apr 2023
Documents filed58
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07012021_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07042025_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07072021_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07072022_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07072023_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07072024_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07072024_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07102020_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07102021_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07102022_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07102023_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07042024_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07102024_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07072020_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07012022_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07012023_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07012024_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07012025_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07012025_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07042022_20250531_0001.pdf | 1 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: amber form 1 07042023_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07102024_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07102023_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07102022_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07102021_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07102020_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07072024_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07072023_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07072022_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07072021_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07072020_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07042025_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07042024_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07042023_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07042022_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07042021_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07012025_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07012024_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07012022_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber form 2 07012021_20250531_0001.pdf | 1 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amber for 2 07012023_20250531_0001.pdf | 1 Jun 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 8 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5_Amber_Builders_2122.pdf | 16 Mar 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC 1.pdf | 17 Apr 2023 |
| Copy of the legal title reportFile: SEARCH.pdf | 13 Feb 2020 |
| Details of encumbrancesFile: FORM B.pdf | 13 Feb 2020 |
| Declaration in FORM BFile: FORM B.pdf | 13 Feb 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WING A B.pdf | 13 Feb 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WING C D.pdf | 13 Feb 2020 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE_compressed.pdf | 13 Feb 2020 |
| Layout approvalFile: Layout Plan_compressed.pdf | 22 May 2019 |
| Building plan approvalFile: Wing A and B (C).pdf | 22 May 2019 |
| Building plan approvalFile: Wing C and D (C).pdf | 22 May 2019 |
| PAN CardFile: PAN.pdf | 22 May 2019 |
| Copy of Layout Approval (in case of layout)File: Layout Plan_compressed.pdf | 22 May 2019 |
| Building Plan Approval (IOD)File: Wing A and B (C).pdf | 22 May 2019 |
| Building Plan Approval (IOD)File: Wing C and D (C).pdf | 22 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 22 May 2019 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| AMBER PARADISE | JAGDEV NAGAR | 9 | Completed | Jun 2015 | Jun 2015 |
| AMBER ENCLAVE | PARVATI NAGAR | 19 | Completed | Aug 2014 | Aug 2014 |
| AMBER CASTLE | SURAJ NAGAR AMRAVATI | 12 | Completed | Jan 2014 | Jan 2014 |
| AMBER TOWER | AKOLI STATION ROAD AMRAVATI | 18 | Completed | May 2013 | May 2013 |
| AMBER RESIDENCY | NISARG LAWN AMRAVATI | 27 | Completed | Oct 2012 | Oct 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Amravati
Computed across the 450+ Amravati projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 58 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep AMBER PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AMRAVATI450+ in Amravati
Jai Amba Palm City- Areca Palm Wing A,B,C
Grand Palm City LLP
Vivanta Infinity Private Limited
VIVANTA INFINITY PRIVATE LIMITED
SAHYADRI HEIGHTS
ANSHUMAN BUILDERS
SANKALP ICON
SANKALP DREAM SPACES LLP
RACHANA SRUSHTI PHASE II
SRUSHTI INFRA
Jai Amba Palm City- Queen Palm Wing A B
M/s Grand Palm City LLP
See every Amravati project, with the district possession charts
Builder: AMBER BUILDERS AND DEVELOPERS
AMBER BUILDERS AND DEVELOPERS has 3 registrations on MahaRERA, including AMBER HEIGHTS and AMBER PARK. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Amravati district page.
Frequently asked questions
What are my rights if AMBER PARK is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AMBER PARK?
The registered promoter entity is AMBER BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AMBER PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AMBER PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AMBER PARK?
The professionals named in the filing: Architect: RAHUL FARKADE; Engineer: SAGAR WANKHADE; Chartered Accountant: KALOTI & LATHIYA CHARTERED ACCOUNTANTS; Chartered Accountant: V S JAKHOTIYA & CO CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMBER PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback