Home / Browse projects / Pune, Maharashtra / AMARILLO PHASE 1
AMARILLO PHASE 1
By krrsna leela skyscraper llp
RG-MH-16891 · RERA P52100027235 · Last updated on MahaRERA portal: 22 Jan 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AMARILLO PHASE 1 is a Residential / Group Housing project by krrsna leela skyscraper llp in Pune, Maharashtra, registered with MahaRERA as P52100027235 on 25 Nov 2020. The registration is recorded completed; possession was promised by 30 Sep 2024. 1 complaint is on record with the regulator.
At a glance
Project
- NameAMARILLO PHASE 1
- TypeResidential / Group Housing
- Location
- LAXMI CHOWK ROAD
- HINJEWADI PHASE 1
- WAKAD ANNEXE
- Hinjavadi (CT)
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100027235
- ReraGenie IDRG-MH-16891
Builder
- Namekrrsna leela skyscraper llp
- Entity typeCompany
- DirectorsSANDEEP GOYAL, sunil agarwal, kumarpal sanghvi
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Nov 2020
- Promised completion30 Sep 2024
- Revised completionNone
- Buildings3 building records
- Documents filed140 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 20 | 0 | 0 | 0 | 0 |
| B Wing | NA | 20 | 0 | 0 | 0 | 0 |
| C Wing | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 22 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
33 of 33 construction stages are filed complete across 3 buildings.
A Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 22 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed324
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A Wing | 72 | 36 | 108 |
| B Wing | 63 | 45 | 108 |
| C Wing | 71 | 37 | 108 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SHARAD SUBRAO KOKATE | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VINOD DHUSIA |
| Engineer | Shashikant Gawas |
| Chartered Accountant | Dilip Jain |
| Partner | Role in project |
|---|---|
| krrsna leela skyscraper llp | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600131 | SEVAKRAM PARATANE | krrsna leela skyscraper llp | 08/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Jan 2025
Documents filed140
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 22 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf | 22 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Krrsna Leela Skyscraper LLP_form5.pdf | 16 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form 1 Leela July'24001_CERTIFICATE.pdf | 5 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Form 2 Leela July'24.pdf | 5 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Form 3 Leela July'24_CERTIFICATE.pdf | 5 Aug 2024 |
| Copy of the legal title reportFile: A-Title Search Report - converted.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Leelaform1.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LeelaForm2.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LeelaForm3.pdf | 17 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Krrsnaleela.pdf | 25 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf | 21 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf | 21 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf | 21 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1_Leela.pdf | 10 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Leela.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From3_Leela_compressed.pdf | 10 Oct 2023 |
| Layout approvalFile: Scan 2023-8-9 (12,5,44).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,6,55).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,7,39).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,8,24).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,9,14).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,9,54).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,10,44).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,11,40).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,12,32).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,13,32).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,14,16).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,15,5).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,15,47).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,16,33).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,17,18).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,18,11).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,19,13).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,20,6).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,20,58).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,21,43).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,22,31).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,23,20).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,24,12).pdf | 16 Aug 2023 |
| Building plan approvalFile: Scan 2023-8-9 (12,25,11).pdf | 16 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Scan 2023-8-9 (12,5,44).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,6,55).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,7,39).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,8,24).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,9,14).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,9,54).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,10,44).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,11,40).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,12,32).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,13,32).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,14,16).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,15,5).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,15,47).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,16,33).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,17,18).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,18,11).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,19,13).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,20,6).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,20,58).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,21,43).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,22,31).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,23,20).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,24,12).pdf | 16 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan 2023-8-9 (12,25,11).pdf | 16 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 28 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1_leela.pdf | 28 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 28 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_leela.pdf | 28 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM3LEELA.pdf | 28 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_leela.pdf | 28 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Leela.pdf | 23 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 12 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 12 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form3dated07dec2022.pdf | 25 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArchitectsCertifcate07Dec2022.pdf | 25 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineeringcertificate07dec2022.pdf | 25 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3dated07dec2022.pdf | 25 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Krrsna Leela Skyscrapper LLP Form 5.pdf | 2 Feb 2023 |
| Layout approvalFile: 01-24.pdf | 17 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 140 filed documents as one ZIP, foldered, with a manifest
Keep AMARILLO PHASE 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HINJEWADI PHASE 1 , WAKAD ANNEXE13,700+ in Pune
Filed coordinates, straight-line distance. 186 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: krrsna leela skyscraper llp
krrsna leela skyscraper llp has 2 registrations on MahaRERA, including AMARILLO PHASE 1 and AMARILLO PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if AMARILLO PHASE 1 is delayed beyond 30 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AMARILLO PHASE 1?
The registered promoter entity is krrsna leela skyscraper llp, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AMARILLO PHASE 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AMARILLO PHASE 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for AMARILLO PHASE 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AMARILLO PHASE 1?
The professionals named in the filing: Architect: VINOD DHUSIA; Engineer: Shashikant Gawas; Chartered Accountant: Dilip Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMARILLO PHASE 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback