Home / Browse projects / Nashik, Maharashtra / AMAR ELITE APARTMENT
AMAR ELITE APARTMENT
By AMAR BUILDTECH PRIVATE LIMITED
RG-MH-03918 · RERA P51600022938 · Last updated on MahaRERA portal: 12 Apr 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AMAR ELITE APARTMENT is a Others project by AMAR BUILDTECH PRIVATE LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600022938 on 5 Nov 2019. The registration is recorded completed; possession was promised by 30 Dec 2022.
At a glance
Project
- NameAMAR ELITE APARTMENT
- TypeOthers
- Location
- RANAPRATP CHOWCK
- AUDUMBAR STOP
- Nashik
- 422009
- Pincode422009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600022938
- ReraGenie IDRG-MH-03918
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Nov 2019
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings1 building record
- Documents filed59 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AMAR ELITE APARTMENT | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
AMAR ELITE APARTMENT: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 12 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KABRE CONSULTANTS |
| Engineer | MR RAVI M TAPADIA |
| Chartered Accountant | MAHADEOKAR & YARDI |
| Partner | Role in project |
|---|---|
| AMAR BUILDTECH PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Oct 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Oct 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Jan 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 Mar 2022
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DOA 1.pdf | 12 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DOA 2.pdf | 12 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DOA 3.pdf | 12 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DOA 4.pdf | 12 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf | 28 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM V CA CERTIFICATE.pdf | 28 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 30 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 30 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New Form 1.pdf | 29 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: New Form 2.pdf | 29 Mar 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf | 29 Mar 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 29 Mar 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DECLARATION OF APARTMENT.pdf | 28 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I ARCHITECH CERTIFICATE.pdf | 22 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM II ENGI CERTIFICATE.pdf | 22 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM III C A CERTIFICATE.pdf | 22 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I ARCHITECH CERTIFICATE UP TO JUNE 2021.pdf | 29 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM II ENGI CERTIFICATE UP TO JUNE 2021.pdf | 29 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM III CHARTERED ACCOUNTANTS UPTO JUNE 2021.pdf | 29 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM -2A Site ENGI CERTIFICATE .pdf | 5 Jul 2021 |
| Declaration about Commencement CertificateFile: DECLARTION FOR COMMENCEMENT CERTIFICATE .pdf | 3 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: DISCLOUSER SOLD INVETORIES .pdf | 2 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2.pdf | 2 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1.pdf | 2 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FROM 2 -A ENGI CERTIFICATE FOR QUALITY ASSURANCE .pdf | 1 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: ANNUAL REPORT ON SATATEEMENT OF ACCOUNTS FORM V.pdf | 1 Jul 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I ARCHITECH CERTIFICAT .pdf | 30 Jun 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 ENGI CERTIFICATE_compressed (1).pdf | 30 Jun 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REVISED FORM 3 CHARTERED CERTIFICATE _compressed.pdf | 30 Jun 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM III CA CERTIFICATE_compressed.pdf | 30 Jun 2021 |
| Building plan approvalFile: REVISED BUILDING PLAN _compressed_compressed-compressed.pdf | 16 Jan 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: REVISED BUILDING PLAN _compressed_compressed-compressed.pdf | 16 Jan 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED COMMENCMENT CERTIFICATE -compressed_compressed_compressed-compressed.pdf | 16 Jan 2021 |
| OtherFile: cidco order _compressed.pdf | 16 Jan 2021 |
| OtherFile: SAMMATI PATRA.pdf | 16 Jan 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I- Architech Cetificate .pdf | 23 Sep 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II Engineers Cetificate .pdf | 23 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III CA Cetificate .pdf | 23 Sep 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I-Architech certificate.pdf | 9 Jul 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM II ENGI CERTIFICATE_.pdf | 9 Jul 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM III CACERTIFICATE _compressed.pdf | 9 Jul 2020 |
| OtherFile: plinth complition .pdf | 9 Jul 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-2 ENGINEERS CERTIFICATE .pdf | 24 Feb 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARICHTECH CERTIFICATE .pdf | 24 Feb 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CHARTERED ACCOUNT UP TO DEC 2019.pdf | 24 Feb 2020 |
| OtherFile: FROM 2 -A ENGI CERTIFICATE FOR QUALITY ASSURANCE .pdf | 24 Feb 2020 |
| Copy of the legal title reportFile: Tital certificate1 .pdf | 26 Oct 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 Chartered Accountant certificate .pdf | 26 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form No 3 Chartered Accountant certificate .pdf | 26 Oct 2019 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE DRAFT.pdf | 26 Oct 2019 |
| OtherFile: LEASE DEED -compressed.pdf | 26 Oct 2019 |
| Layout approvalFile: LAYOUT PLAN .pdf | 25 Oct 2019 |
| Building plan approvalFile: BUILDING PLAN .pdf | 25 Oct 2019 |
| PAN CardFile: ABPL_PAN_CARD.pdf | 25 Oct 2019 |
| Details of encumbrancesFile: Self Declaration .pdf | 25 Oct 2019 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN .pdf | 25 Oct 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN .pdf | 25 Oct 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE .pdf | 25 Oct 2019 |
| Declaration in FORM BFile: FORM B DECLRATION .pdf | 25 Oct 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| AMAR VRINDAVAN APARTMENT | PLOT NO 29 SECTOR P 45A NEBHOURHOOD VAISHAKH CIDCO NASHIK | 52 | Completed | Sep 2019 | Mar 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
Keep AMAR ELITE APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AUDUMBAR STOP4,100+ in Nashik
Filed coordinates, straight-line distance. 71 registered projects within 2 km.
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: AMAR BUILDTECH PRIVATE LIMITED
AMAR BUILDTECH PRIVATE LIMITED has 2 registrations on MahaRERA, including AMAR ELITE APARTMENT and AMAR SAHAJEEVAN. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if AMAR ELITE APARTMENT is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AMAR ELITE APARTMENT?
The registered promoter entity is AMAR BUILDTECH PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AMAR ELITE APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AMAR ELITE APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AMAR ELITE APARTMENT?
The professionals named in the filing: Architect: KABRE CONSULTANTS; Engineer: MR RAVI M TAPADIA; Chartered Accountant: MAHADEOKAR & YARDI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMAR ELITE APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback