Registered No litigation declared Commercial project

Amar Delta One

By Delta Estates LLP

RG-MH-96679 · RERA P52100049055 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 70.00 crore secured on the land, in favour of Bajaj Housing Finance Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 81%
10 of 13Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

Amar Delta One is a Commercial project by Delta Estates LLP in Pune, Maharashtra, registered with MahaRERA as P52100049055 on 30 Jan 2023. Possession is promised by 31 Dec 2026. 3 of the 13 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameAmar Delta One
  • TypeCommercial
  • Location
    • Off Baner Road
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100049055
  • ReraGenie IDRG-MH-96679

Builder

  • NameDelta Estates LLP
  • Entity typePartnership
  • PartnersPiyush Basant Makhija, Aditya Basant Makhija

Key dates

this monthRegisteredJan 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Current status

23%3 of 13 units booked
74.7%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Amar Delta OneNA181301313

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 81%.

Amar Delta One: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure81%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises33%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.13%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.16%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes15%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed621

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots621
Closed/Covered621

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,888 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBajaj Housing Finance Limited
Secured amountRs 70.00 crore
CERSAI search filedYes
Declared on7 Apr 2026

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI18994.81
Proposed, not sanctioned18,994 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Satguru House 362/6, CTS. No. 30, Ground Floor, Bund Garden Road, Pune.411001
Estimated costRs 95.66 cr
Cost incurredRs 71.45 cr
Work done74.69%
BuildingWingEstimatedIncurred
Amar Delta OneNARs 85.00 crRs 65.18 cr
-NARs 10.66 crRs 6.26 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPritika Manjrekar
ArchitectM.B. Chaudhari & Associates
ArchitectMOCO DESIGN STUDIO LLP
EngineerJW Consultants LLP
EngineerSuresh Thakchand Ghodekar
Chartered AccountantP. S. Athavale & Co
Chartered AccountantV A Dudhedia & Co
PartnerRole in project
Delta Estates LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ADONE FORM 1 MAR 26.pdf20 Apr 2026
Withdrawal Update Form 2File: AD ONE FORM 2 MAR 26.pdf20 Apr 2026
Withdrawal Update Form 3File: 01 AD ONE - FORM 3_ DEC 2025.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 - ARCHITECT CERT_AD ONE_Dec 25.pdf13 Feb 2026
Withdrawal Update Form 2File: FORM 2 - ENGINEER CERTI_AD ONE_Dec 25.pdf13 Feb 2026
Withdrawal Update Form 3File: 01 AD ONE - FORM 3_ DEC 2025.pdf13 Feb 2026
Withdrawal Update Form 1File: FORM 1 - ARCHITECT CERT_AD ONE_Dec 25.pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2 - ENGINEER CERTI_AD ONE_Dec 25.pdf17 Jan 2026
Withdrawal Update Form 3File: FORM 3 AD One -Sept 2025.pdf17 Jan 2026
Form 5 (FY 2024-2025)File: AD One-Form 5_2024-25.pdf25 Nov 2025
Withdrawal Update Form 1File: DELTA FORM 1-Sept 2025.pdf30 Sep 2025
Withdrawal Update Form 2File: DELTA FORM 2-Sept 2025.pdf30 Sep 2025
Withdrawal Update Form 3File: FORM 3 AD One -Sept 2025.pdf30 Sep 2025
Withdrawal Update Form 1File: FORM 1 - ARCHITECTu0027S CERT_AD ONE_Mar 25.pdf31 Jul 2025
Withdrawal Update Form 1File: FORM 1 - ARCHITECTu0027S CERT_AD ONE_June 25.pdf31 Jul 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERu0027S CERTI_AD ONE_Mar 25.pdf31 Jul 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERu0027S CERTI_AD ONE_June 25.pdf31 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf31 Jul 2025
Withdrawal Update Form 3File: Form 3_July 2025.pdf31 Jul 2025
Withdrawal Update Form 1File: FORM 1 - ARCHITECTu0027S CERT_AD ONE_June 25.pdf18 Jul 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERu0027S CERTI_AD ONE.pdf18 Jul 2025
Withdrawal Update Form 3File: AD ONE - FORM 3_ UPTO DEC 2024.pdf18 Jul 2025
Layout approvalFile: Layout.pdf17 Apr 2025
Building plan approvalFile: Building Plan.pdf17 Apr 2025
Copy of Layout Approval (in case of layout)File: Layout.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERT_AD ONE_Mar 25.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER'S CERTI_AD ONE_Mar 25.pdf17 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: BLDG CC.pdf17 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: AD ONE - Sold Unsold Units_Mar 25.pdf17 Apr 2025
Declaration about Commencement CertificateFile: DECLARATION OF COMM CERT.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AD ONE - FORM 3_ UPTO DEC 2024.pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERT_AD ONE_Dec 24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER'S CERTI_AD ONE_Dec 24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AD ONE - FORM 3_ SEPT 2024.pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERT_AD ONE.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER'S CERTI_AD ONE.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: AD ONE - Disclosure of Sold Unsold Units.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - AD ONE 2023-24.pdf17 Oct 2024
Copy of the legal title reportFile: TITLE REPORT.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 AD ONE - FORM 3_ UPTO JUNE 2024.pdf20 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 AD ONE - FORM 3_ UPTO MAR 2024.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERT_AD ONE.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER'S CERTI_AD ONE.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: AD ONE - Disclosure of Sold and Unsold Units.pdf20 Jul 2024
Details of encumbrances concerned to FinanceFile: AD ONE_Encumbrances Cert.pdf10 May 2024
Details of encumbrances concerned to LegalFile: AD ONE_Encumbrances Cert.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERT_AD ONE.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER'S CERTI_AD ONE.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - QUALITY ASSURANCE CERT-2023-24.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: AD ONE - Disclosure of Sold and Unsold Units.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 AD ONE - FORM 3_ UPTO DEC 2023.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERT_AD ONE.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER'S CERTI_AD ONE.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: AD ONE - Disclosure of Sold And Unsold Units.pdf20 Jan 2024
Home Buyer /Allottee Grievance Redressal CellFile: REREA GRIEVANCE REDRESSAL CELL.pdf18 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - AD ONE 2022-23.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERTIFICATE-.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERT_AD ONE.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER'S CERTI_AD ONE.pdf23 Oct 2023
Disclosure of sold/ booked inventoryFile: AD ONE - Disclosure of Sold and Unsold Units.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER'S CERTIFICATE-.pdf23 Sep 2023
Disclosure of sold/ booked inventoryFile: AD ONE Disclosure of Sold Unsold Units.pdf23 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - QUALITY ASSURANCE CERT-MAR 2022.pdf21 Sep 2023
Copy of the legal title reportFile: ADONE - TITLE REPORT.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECTS CERTIFICATE-.pdf13 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER'S CERTIFICATE-.pdf10 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A - QUALITY ASSURANCE CERT-MAR 2022.pdf10 May 2023
Disclosure of sold/ booked inventoryFile: AD ONE Disclosure of Sold Unsold Units.pdf10 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AD ONE - FORM 3_ UPTO MARCH 2023.pdf10 May 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf24 Jan 2023
Copy of the legal title reportFile: TITLE REPORT.pdf20 Jan 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE -LEGAL.pdf20 Jan 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE -LEGAL.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AD ONE - Form-3.pdf20 Jan 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST.pdf7 Jan 2023
CERSAI detailsFile: CERSAI REPORT.pdf6 Jan 2023
Layout approvalFile: 1.pdf23 Dec 2022
Layout approvalFile: 2.pdf23 Dec 2022

How this compares with Pune

23%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amar Delta One on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner13,700+ in Pune

Builder: Delta Estates LLP

Delta Estates LLP has 1 registration on MahaRERA, including Amar Delta One. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Amar Delta One is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amar Delta One?

The registered promoter entity is Delta Estates LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amar Delta One?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Amar Delta One?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amar Delta One?

The professionals named in the filing: Architect: Pritika Manjrekar; Architect: M.B. Chaudhari & Associates; Architect: MOCO DESIGN STUDIO LLP; Engineer: JW Consultants LLP; Engineer: Suresh Thakchand Ghodekar; Chartered Accountant: P. S. Athavale & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amar Delta One?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amar Delta One. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amar Delta One to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.