Home / Browse projects / Thane, Maharashtra / Amantra Phase 2
Amantra Phase 2
By TATA HOUSING DEVELOPMENT COMPANY LIMITED
RG-MH-09538 · RERA P51700000308 · Last updated on MahaRERA portal: 30 Sep 2018
Source: official MahaRERA filing
Red flags
- 12 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Amantra Phase 2 is a Residential / Group Housing project by TATA HOUSING DEVELOPMENT COMPANY LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700000308 on 15 Jul 2017. The registration is recorded completed; possession was promised by 31 Mar 2018. 12 complaints are on record with the regulator.
At a glance
Project
- NameAmantra Phase 2
- TypeResidential / Group Housing
- Location
- Bhiwandi Kalyan Junction
- Mumbai Nashik Expressway
- Ranjnoli
- Bhiwandi
- Thane
- 421302
- Pincode421302
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700000308
- ReraGenie IDRG-MH-09538
Builder
- NameTATA HOUSING DEVELOPMENT COMPANY LIMITED
- Entity typeCompany
- DirectorsSanjay Bhupender Dutt, Sandhya Shailesh Kudtarkar, Kamlesh Mansukhlal Parekh, Ankur Dalwani, Sudip Mullick
- ChairpersonBanmali Agrawala
- Other registrations2 more →
- Completed1 of 3
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects25 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Jul 2017
- Promised completion31 Mar 2018
- Revised completionNone
- Buildings6 building records
- Documents filed26 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C 1 | NA | 38 | 0 | 0 | 0 | 0 |
| D 7 | NA | 33 | 0 | 0 | 0 | 0 |
| A 8 | NA | 33 | 0 | 0 | 0 | 0 |
| A 9 | NA | 33 | 0 | 0 | 0 | 0 |
| A 10 | NA | 33 | 0 | 0 | 0 | 0 |
| A 11 | NA | 33 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 30 Sep 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
66 of 66 construction stages are filed complete across 6 buildings.
C 1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D 7100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A 8100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A 9100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A 10100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A 11100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 Sep 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed977
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| C 1 | 195 | 195 |
| D 7 | 166 | 166 |
| A 8 | 154 | 154 |
| A 9 | 154 | 154 |
| A 10 | 154 | 154 |
| A 11 | 154 | 154 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ECOHOMES TOWNSHIPS LLP | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/s IAG - Design Architect |
| Engineer | M/s Optimal Consultant Private Limited |
| Partner | Role in project |
|---|---|
| TATA HOUSING DEVELOPMENT COMPANY LIMITED | - |
Litigation declared7
| Case | Court | Status |
|---|---|---|
| 273/2010 | Civil Judge of Junior Division | Hearing of Interlocutory Application |
| 353/2011 | Civil Judge of Junior Division | For filing Affidavit in chief by the Plaintiff |
| 898/2013 | Civil Judge Senior Division Bhiwandi | For filing Affidavit in chief by the Plaintiff |
| 594/2009 | Civil Judge Junior Division Bhiwandi | For Compliance of survey report by plaintiff |
| 668/2011 | Bhiwandi third Civil Judge of Junior Division | Plaintiff to amend the plaint to bring on record the legal heirs |
| 1021/2011 | Bhiwandi CJSD Link Court | For Production of documents but got adjourned due to High Court Writ Petition |
| 5760/2016 | High Court Bombay | Pre Admission Stage |
Complaints filed with MahaRERA12
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000044280 | Sunder Padmanabhan | Tata Housing Development Company Limited | 26/04/2018 |
| CC006000000100336 | Nishant Prakashchandra Bhutada | Tata Housing Development Co. Ltd | 04/08/2019 |
| CC006000000110661 | Arunesh Bhagwan Prasad Chopra & Riddhima Chanda | Tata Housing Development Company Ltd | 30/08/2019 |
| CC006000000197654 | Mrs.RanjanaRamchandra barge & Two Others | Tata Housing Development company Limited | 20/07/2021 |
| CC006000000195535 | Subrata Ravindra Bhattacharya | Tata Housing Development Company | 20/01/2021 |
| CC006000000251401 | Ashok Jokhan Pandey | Tata Housing Development Company Limited | 20/06/2022 |
| CC006000000303619 | Bhagwan Nampelli Kodam | Tata Housing Development Company Limited | 09/12/2022 |
| CC006000000354356 | Sangeeta Maheshwari | Tata Housing Development Company Limited | 18/02/2023 |
| CC006000000354486 | Suresh Kumar Sharma | Tata Housing Development Company Limited | 05/03/2023 |
| CC006000000590979 | mahadeo N bandekar | TATA HOUSING DEVELOPMENT CO LTD | 03/07/2024 |
| CC12504209 | Sanghapal Laxman Maske | TATA HOUSING DEVELOPMENT COMPANY LIMITED | 28/11/2025 |
| CC12600185 | DINESH MANILAL MEHTA | TATA HOUSING DEVELOPMENT COMPANY LIMITED | 11/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed26
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 5)File: Amantra Phase 2 - Annexure I.PDF | 30 Sep 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Self Declaration for Amantra Ecohomes signed.pdf | 2 Apr 2018 |
| Certificates of Architect (Form 4)File: Form 4 MahaRERA - IAG.PDF | 30 Mar 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Self Declaration for Amantra Ajit Kini signed.pdf | 30 Mar 2018 |
| OtherFile: OC for Amantra Merged File-compressed.pdf | 30 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2nd Qtr Architect Certificate_Dec-17.PDF | 3 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2nd Qtr ENGINEER CERTIFICATE _Dec-17.pdf | 3 Jan 2018 |
| Certificates of CA (Form 3)File: 2nd Qtr CA certificate Amantra Phase II_Dec-2017.pdf | 3 Jan 2018 |
| Certificates of CA (Form 3)File: CA Certificate 1st Quarter Update.pdf | 7 Oct 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate 1st Quarter Update.pdf | 6 Oct 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate 1st Quarter Update.pdf | 6 Oct 2017 |
| Building plan approvalFile: Annex I Approval Plan.pdf | 8 Jul 2017 |
| Layout approvalFile: Annex I Approval Plan.pdf | 8 Jul 2017 |
| Building plan approvalFile: NA Order.pdf | 8 Jul 2017 |
| PAN CardFile: PAN- Tata Housing.pdf | 8 Jul 2017 |
| Copy of the legal title reportFile: Legal Title Certificate new Amantra.pdf | 8 Jul 2017 |
| Details of encumbrancesFile: ENCUMBRANCE AMANTRA.pdf | 8 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Annex I Approval Plan.pdf | 8 Jul 2017 |
| Building Plan Approval (IOD)File: Annex I Approval Plan.pdf | 8 Jul 2017 |
| Building Plan Approval (IOD)File: NA Order.pdf | 8 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Amantra RERA CC.pdf | 8 Jul 2017 |
| Declaration in FORM BFile: FORM B ABHIJIT K AMANTRA.pdf | 8 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amantra RERA Architect certificate.pdf | 8 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineer Certificate Amantra Phase 2.pdf | 8 Jul 2017 |
| Certificates of CA (Form 3)File: form 3 kalyan Phase II.pdf | 8 Jul 2017 |
| Proforma of Allotment letterFile: AMANTRA PH2 RERA AFS Allotment Letter.pdf | 8 Jul 2017 |
Promoter's earlier projects17
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Amantra PH 1 Tower A A3 | Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 421302 | 92 | Completed | Dec 2015 | Late, Mar 2016 |
| Amantra PH 1 Tower L B12 | Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 421302 | 197 | Completed | Nov 2015 | Late, Mar 2016 |
| Amantra PH 1 Tower D A4 | Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 421302 | 127 | Completed | Nov 2015 | Late, Mar 2016 |
| Amantra PH 1 Tower C A5 | Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 421302 | 114 | Completed | Nov 2015 | Late, Mar 2016 |
| Amantra PH 1 Tower E B6 | Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 421302 | 168 | Completed | Sep 2015 | Late, Mar 2016 |
| Amantra PH 1 Tower B A2 | Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 421302 | 120 | Completed | Sep 2015 | Late, Mar 2016 |
| Inora Park PH II 3 BHK | Land Survey No.27 2 P 27 9 P Undri Tal Haveli Pune | 104 | Completed | Oct 2014 | Jul 2014 |
| Eden Court PH III Centraus Mall | Plot No IIG 7 8 New Town Rajarhat Kolkata | 38 | Completed | Mar 2014 | Late, May 2014 |
| Eden Court PH II Tower D E | Plot No IIG 7 8 New Town Rajarhat Kolkata | 171 | Completed | Jun 2013 | Late, Sep 2013 |
| Prive Phase 2 25 Villas | Village Lonavala Old Khandala Road opposite Sadhna Kutir Lonavala 410 401 | 25 | Completed | Mar 2013 | Late, Aug 2014 |
| Prive Phase 2 13 Villas | Village Lonavala Old Khandala Road opposite Sadhna Kutir Lonavala 410 401 | 13 | Completed | Mar 2013 | Late, Apr 2015 |
| Inora Park PH I 2 BHK and 2 and half BHK | Land Survey No.27 2 P 27 9 P Undri Tal Haveli Pune | 141 | Completed | Jan 2013 | Late, Aug 2013 |
| Prive Phase 1 35 Villas | Prive Village Lonavala Old Khandala Road opposite Sadhna Kutir Lonavala 410 401 | 35 | Completed | Mar 2012 | Late, Jun 2013 |
| Eden Court PH I Tower A B C | Plot No IIG 7 8 New Town Rajarhat Kolkata | 348 | Completed | Mar 2012 | Late, Jun 2012 |
| New Haven Boisar 1 and Row House | Chillar Road Betegaon Boisar East Maharashtra 401501 | 1,438 | Completed | Dec 2011 | Late, Mar 2015 |
| Aquila Heights | Sy No 27 HMT HMT Factory Main Road Near HMT School Peenya Plantation Yelahanka Hobli Bengaluru North Taluk Bengaluru 560053 | 108 | Completed | Dec 2011 | Late, Oct 2012 |
| Shubh Griha Boisar I | Chillar Road Betegaon Boisar East Maharashtra 401501 | 1,578 | Completed | Jun 2011 | Late, Dec 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 26 filed documents as one ZIP, foldered, with a manifest
Keep Amantra Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mumbai Nashik Expressway,7,600+ in Thane
Filed coordinates, straight-line distance. 40 registered projects within 2 km.
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: TATA HOUSING DEVELOPMENT COMPANY LIMITED
TATA HOUSING DEVELOPMENT COMPANY LIMITED has 3 registrations on MahaRERA, including Amantra Phase 2 and Aveza Phase 1. Its filings disclose 25 earlier MahaRERA projects: declares 2 of 25 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Amantra Phase 2 is delayed beyond 31 Mar 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Amantra Phase 2?
The registered promoter entity is TATA HOUSING DEVELOPMENT COMPANY LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Amantra Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Amantra Phase 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Amantra Phase 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Amantra Phase 2?
The professionals named in the filing: Architect: M/s IAG - Design Architect; Engineer: M/s Optimal Consultant Private Limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Amantra Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.