Home / Browse projects / Thane, Maharashtra / Amantra Phase 2

Completed No litigation declared Residential / Group Housing project

Amantra Phase 2

By TATA HOUSING DEVELOPMENT COMPANY LIMITED

RG-MH-09538 · RERA P51700000308 · Last updated on MahaRERA portal: 30 Sep 2018

Source: official MahaRERA filing

Red flags

  • 12 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2018Possession promisedregistration recorded completed
66 of 66Construction stages doneacross 6 buildings; every applicable stage filed complete
12Complaints at MahaRERAon this registration
Jump to the 26 documents Report an error

Amantra Phase 2 is a Residential / Group Housing project by TATA HOUSING DEVELOPMENT COMPANY LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700000308 on 15 Jul 2017. The registration is recorded completed; possession was promised by 31 Mar 2018. 12 complaints are on record with the regulator.

At a glance

Project

  • NameAmantra Phase 2
  • TypeResidential / Group Housing
  • Location
    • Bhiwandi Kalyan Junction
    • Mumbai Nashik Expressway
    • Ranjnoli
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700000308
  • ReraGenie IDRG-MH-09538

Builder

  • NameTATA HOUSING DEVELOPMENT COMPANY LIMITED
  • Entity typeCompany
  • DirectorsSanjay Bhupender Dutt, Sandhya Shailesh Kudtarkar, Kamlesh Mansukhlal Parekh, Ankur Dalwani, Sudip Mullick
  • ChairpersonBanmali Agrawala
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects25 →

Key dates

this monthRegisteredJul 2017PromisedMar 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jul 2017
  • Promised completion31 Mar 2018
  • Revised completionNone
  • Buildings6 building records
  • Documents filed26 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C 1NA380000
D 7NA330000
A 8NA330000
A 9NA330000
A 10NA330000
A 11NA330000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 30 Sep 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

66 of 66 construction stages are filed complete across 6 buildings.

C 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D 7100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A 8100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A 9100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A 10100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A 11100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Sep 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed977

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots977
Closed/Covered977
BuildingClosed/CoveredTotal
C 1195195
D 7166166
A 8154154
A 9154154
A 10154154
A 11154154

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,896 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ECOHOMES TOWNSHIPS LLPMumbai CityMumbai City

Approvals and building plan

Permissible FSI61739.01
Proposed, not sanctioned61,739 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNARIMAN POINT, MUMBAI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s IAG - Design Architect
EngineerM/s Optimal Consultant Private Limited
PartnerRole in project
TATA HOUSING DEVELOPMENT COMPANY LIMITED-

Litigation declared7

CaseCourtStatus
273/2010Civil Judge of Junior DivisionHearing of Interlocutory Application
353/2011Civil Judge of Junior DivisionFor filing Affidavit in chief by the Plaintiff
898/2013Civil Judge Senior Division BhiwandiFor filing Affidavit in chief by the Plaintiff
594/2009Civil Judge Junior Division BhiwandiFor Compliance of survey report by plaintiff
668/2011Bhiwandi third Civil Judge of Junior DivisionPlaintiff to amend the plaint to bring on record the legal heirs
1021/2011Bhiwandi CJSD Link CourtFor Production of documents but got adjourned due to High Court Writ Petition
5760/2016High Court BombayPre Admission Stage

Complaints filed with MahaRERA12

Case no.ComplainantRespondentFiled
CC006000000044280Sunder PadmanabhanTata Housing Development Company Limited26/04/2018
CC006000000100336Nishant Prakashchandra BhutadaTata Housing Development Co. Ltd04/08/2019
CC006000000110661Arunesh Bhagwan Prasad Chopra & Riddhima ChandaTata Housing Development Company Ltd30/08/2019
CC006000000197654Mrs.RanjanaRamchandra barge & Two OthersTata Housing Development company Limited20/07/2021
CC006000000195535Subrata Ravindra BhattacharyaTata Housing Development Company20/01/2021
CC006000000251401Ashok Jokhan PandeyTata Housing Development Company Limited20/06/2022
CC006000000303619Bhagwan Nampelli KodamTata Housing Development Company Limited09/12/2022
CC006000000354356Sangeeta MaheshwariTata Housing Development Company Limited18/02/2023
CC006000000354486Suresh Kumar SharmaTata Housing Development Company Limited05/03/2023
CC006000000590979mahadeo N bandekarTATA HOUSING DEVELOPMENT CO LTD03/07/2024
CC12504209Sanghapal Laxman MaskeTATA HOUSING DEVELOPMENT COMPANY LIMITED28/11/2025
CC12600185DINESH MANILAL MEHTATATA HOUSING DEVELOPMENT COMPANY LIMITED11/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed26

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 5)File: Amantra Phase 2 - Annexure I.PDF30 Sep 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Self Declaration for Amantra Ecohomes signed.pdf2 Apr 2018
Certificates of Architect (Form 4)File: Form 4 MahaRERA - IAG.PDF30 Mar 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Self Declaration for Amantra Ajit Kini signed.pdf30 Mar 2018
OtherFile: OC for Amantra Merged File-compressed.pdf30 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2nd Qtr Architect Certificate_Dec-17.PDF3 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2nd Qtr ENGINEER CERTIFICATE _Dec-17.pdf3 Jan 2018
Certificates of CA (Form 3)File: 2nd Qtr CA certificate Amantra Phase II_Dec-2017.pdf3 Jan 2018
Certificates of CA (Form 3)File: CA Certificate 1st Quarter Update.pdf7 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate 1st Quarter Update.pdf6 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate 1st Quarter Update.pdf6 Oct 2017
Building plan approvalFile: Annex I Approval Plan.pdf8 Jul 2017
Layout approvalFile: Annex I Approval Plan.pdf8 Jul 2017
Building plan approvalFile: NA Order.pdf8 Jul 2017
PAN CardFile: PAN- Tata Housing.pdf8 Jul 2017
Copy of the legal title reportFile: Legal Title Certificate new Amantra.pdf8 Jul 2017
Details of encumbrancesFile: ENCUMBRANCE AMANTRA.pdf8 Jul 2017
Copy of Layout Approval (in case of layout)File: Annex I Approval Plan.pdf8 Jul 2017
Building Plan Approval (IOD)File: Annex I Approval Plan.pdf8 Jul 2017
Building Plan Approval (IOD)File: NA Order.pdf8 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Amantra RERA CC.pdf8 Jul 2017
Declaration in FORM BFile: FORM B ABHIJIT K AMANTRA.pdf8 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amantra RERA Architect certificate.pdf8 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineer Certificate Amantra Phase 2.pdf8 Jul 2017
Certificates of CA (Form 3)File: form 3 kalyan Phase II.pdf8 Jul 2017
Proforma of Allotment letterFile: AMANTRA PH2 RERA AFS Allotment Letter.pdf8 Jul 2017

Promoter's earlier projects17

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise16 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Amantra PH 1 Tower A A3Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 42130292CompletedDec 2015Late, Mar 2016
Amantra PH 1 Tower L B12Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 421302197CompletedNov 2015Late, Mar 2016
Amantra PH 1 Tower D A4Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 421302127CompletedNov 2015Late, Mar 2016
Amantra PH 1 Tower C A5Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 421302114CompletedNov 2015Late, Mar 2016
Amantra PH 1 Tower E B6Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 421302168CompletedSep 2015Late, Mar 2016
Amantra PH 1 Tower B A2Kalyan Bhiwandi Junction Ranjnoli Village Dist Thane Pin 421302120CompletedSep 2015Late, Mar 2016
Inora Park PH II 3 BHKLand Survey No.27 2 P 27 9 P Undri Tal Haveli Pune104CompletedOct 2014Jul 2014
Eden Court PH III Centraus MallPlot No IIG 7 8 New Town Rajarhat Kolkata38CompletedMar 2014Late, May 2014
Eden Court PH II Tower D EPlot No IIG 7 8 New Town Rajarhat Kolkata171CompletedJun 2013Late, Sep 2013
Prive Phase 2 25 VillasVillage Lonavala Old Khandala Road opposite Sadhna Kutir Lonavala 410 40125CompletedMar 2013Late, Aug 2014
Prive Phase 2 13 VillasVillage Lonavala Old Khandala Road opposite Sadhna Kutir Lonavala 410 40113CompletedMar 2013Late, Apr 2015
Inora Park PH I 2 BHK and 2 and half BHKLand Survey No.27 2 P 27 9 P Undri Tal Haveli Pune141CompletedJan 2013Late, Aug 2013
Prive Phase 1 35 VillasPrive Village Lonavala Old Khandala Road opposite Sadhna Kutir Lonavala 410 40135CompletedMar 2012Late, Jun 2013
Eden Court PH I Tower A B CPlot No IIG 7 8 New Town Rajarhat Kolkata348CompletedMar 2012Late, Jun 2012
New Haven Boisar 1 and Row HouseChillar Road Betegaon Boisar East Maharashtra 4015011,438CompletedDec 2011Late, Mar 2015
Aquila HeightsSy No 27 HMT HMT Factory Main Road Near HMT School Peenya Plantation Yelahanka Hobli Bengaluru North Taluk Bengaluru 560053108CompletedDec 2011Late, Oct 2012
Shubh Griha Boisar IChillar Road Betegaon Boisar East Maharashtra 4015011,578CompletedJun 2011Late, Dec 2013

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amantra Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai Nashik Expressway,7,600+ in Thane

2 kmAmantra Phase 2Completed 11Lapsed / revoked 13Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: TATA HOUSING DEVELOPMENT COMPANY LIMITED

TATA HOUSING DEVELOPMENT COMPANY LIMITED has 3 registrations on MahaRERA, including Amantra Phase 2 and Aveza Phase 1. Its filings disclose 25 earlier MahaRERA projects: declares 2 of 25 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Amantra Phase 2 is delayed beyond 31 Mar 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amantra Phase 2?

The registered promoter entity is TATA HOUSING DEVELOPMENT COMPANY LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amantra Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Amantra Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Amantra Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amantra Phase 2?

The professionals named in the filing: Architect: M/s IAG - Design Architect; Engineer: M/s Optimal Consultant Private Limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amantra Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amantra Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amantra Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.