Amanora Crown Towers
By City Realty & Development Private Limited
RG-MH-46618 · RERA P52100047454 · Last updated on MahaRERA portal: 15 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Amanora Crown Towers is a Residential / Group Housing project by City Realty & Development Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100047454 on 31 Oct 2022. Possession is promised by 31 Dec 2026. 289 of the 292 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.
At a glance
Project
- NameAmanora Crown Towers
- TypeResidential / Group Housing
- Location
- Hadapsar-Kharadi Byepass Road
- Amanora Park Town
- Hadapsar
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047454
- ReraGenie IDRG-MH-46618
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Oct 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed101 files
Current status
Figures as on 15 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 92 | NA | 33 | 29 | 147 | 0 | 147 |
| Tower 93 | NA | 33 | 29 | 145 | 0 | 145 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 81%.
Tower 9288%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 79% |
| Sanitary Fittings within the flats / premises | 74% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 81% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 67% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 67% |
Tower 9389%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 77% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 76% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 67% |
Progress on shared amenities15
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 40% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 40% |
| Street Lighting | Yes | 40% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 60% |
| Solid Waste Management And Disposal | Yes | 60% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 60% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | Yes | 30% |
| Open Parking | No | Not applicable |
Parking filed528
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Tower 92 | 271 | 271 |
| Tower 93 | 257 | 257 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Skyscape Hotels Pvt. Ltd | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower 92 | NA | Rs 132.03 cr | Rs 112.75 cr |
| Tower 93 | NA | Rs 130.32 cr | Rs 112.68 cr |
| - | NA | Rs 17.28 cr | Rs 3.93 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GNA Architects |
| Engineer | Ms Snehal Shinde |
| Chartered Accountant | R V Porwal and Associates |
| Chartered Accountant | SPCM and Associates |
| Chartered Accountant | A S Jinturkar and Company |
| Partner | Role in project |
|---|---|
| City Realty & Development Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 2022-31-23 R32 Form 1 2026-07-02.pdf | 15 Jul 2026 |
| Withdrawal Update Form 2File: Form2 - Amanora Crown Towers 09072026.pdf | 15 Jul 2026 |
| Withdrawal Update Form 3File: Form 3_Amanora Crown Towers_30062026.pdf | 15 Jul 2026 |
| Withdrawal Update Form 1File: Form1- Crown Towers 02062026.pdf | 10 Jun 2026 |
| Withdrawal Update Form 2File: Form2- Crown Towers 04062026.pdf | 10 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 - Amanora Crown Towers 05062026.pdf | 10 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - Crown Towers 06052026.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Crown Towers 06052026.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Form 3_Amanora Crown Towers as on 30042026.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Form 1 - Crown Towers 03042026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Crown Towers- Form 2- 31032026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3_Amanora Crown Towers_31032026.pdf | 15 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - Amanora Crown Towers 2025-26.pdf | 8 Apr 2026 |
| Withdrawal Update Form 1File: Crown Towers- Form 1- 26032026.pdf | 30 Mar 2026 |
| Withdrawal Update Form 2File: Crown Towers- Form 2- 26032026.pdf | 30 Mar 2026 |
| Withdrawal Update Form 3File: Crown Towers- Form 3- 25032026.pdf | 30 Mar 2026 |
| Withdrawal Update Form 1File: Crown Towers- Form 1- 02012026.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: Crown Towers- Form 2- 09012026.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Amanora Crown Towers as on 31122025.pdf | 12 Jan 2026 |
| Withdrawal Update Form 1File: Form1 - Amanora Crown Towers.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Form2 - Crown Towers.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - Crown Tower.pdf | 15 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Crown Tower 31-03-2025.pdf | 19 Sep 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Amanora Crown Tower.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Crown Towers_31032025.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Crown Towers 31032025.pdf | 14 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 1- Amanora Crown Towers- 31032025.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Crown Towers- 31032025.pdf | 9 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Crown Towers_31122024.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Crown Towers- 3112024.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Crown Towers- 31122024.pdf | 9 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Crown Towers 30062024.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Crown Towers 30092024.pdf | 24 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Crown Towers Form-5.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Crown Towers_30092024.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Crown Towers 30092024.pdf | 9 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Crown Tower Inventory Disclosure 30062024.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Crown Towers_30062024.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Crown Towers 30062024.pdf | 8 Jul 2024 |
| Layout approvalFile: Copy of Layout approval.pdf | 2 Jul 2024 |
| Building plan approvalFile: 1 building plan.pdf | 2 Jul 2024 |
| Building plan approvalFile: 2 building plan.pdf | 2 Jul 2024 |
| Building plan approvalFile: 3 building plan.pdf | 2 Jul 2024 |
| Building plan approvalFile: 4 building plan.pdf | 2 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Copy of Layout approval.pdf | 2 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 building plan.pdf | 2 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 building plan.pdf | 2 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 building plan.pdf | 2 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 building plan.pdf | 2 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - R32 Revised I.pdf | 2 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Crown Towers_31032024.pdf | 13 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Crown Towers 31032024.pdf | 6 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Amanora Crown Tower 92 and 93- 31032024.pdf | 6 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Crown Towers 31032024.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Crown Towers_31122023.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Crown Towers 3112023.pdf | 10 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Crown Towers - 31122023.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Crown Towers (5)- 30092023.pdf | 15 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Crown Tower_30092023.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Crown Towers (5)- 30092023.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Crown Tower 31-03-2023.pdf | 13 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Amanora Crown Tower 92 and 93- 31032023.pdf | 4 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Crown Towers 30062023.pdf | 4 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Crown Towers 30062023.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Crown Towers 30062023.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Crown Tower as on 31-03-2023.pdf | 14 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Crown Towers (3).pdf | 24 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Crown Towers (3).pdf | 24 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Crown Tower 31122022.pdf | 16 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Crown Towers 31122022.pdf | 18 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2022-31-02 R32 Form 1 2022-12-31_compressed.pdf | 12 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance Certificate.pdf | 27 Oct 2022 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance Certificate.pdf | 27 Oct 2022 |
| Copy of the legal title reportFile: Annexure - A Title Report.pdf | 21 Oct 2022 |
| Details of encumbrances concerned to FinanceFile: Finance Encumbrance Certificate.pdf | 21 Oct 2022 |
| Details of encumbrances concerned to LegalFile: Finance Encumbrance Certificate.pdf | 21 Oct 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with Allotment Letter.pdf | 21 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: R-32 Deviation Report with Agreement.pdf | 21 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: Additional Declaration Note.pdf | 21 Oct 2022 |
| Building plan approvalFile: Building Plan Amonora Crown Towers_-compressed.pdf | 20 Oct 2022 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Amanora ApexP52100031292 | Amanora Park Town, Pune | Oct 2021 | Completed | Dec 2022 | Dec 2022 |
| Amanora Neo TowersP52100000447 | Amanora Park Town, Pune | Jul 2017 | Completed | Jun 2019 | Jun 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Amanora Crown Towers on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Amanora Park Town13,700+ in Pune
Filed coordinates, straight-line distance. 197 registered projects within 2 km.
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: City Realty & Development Private Limited
City Realty & Development Private Limited has 3 registrations on MahaRERA, including Amanora Neo Towers and Amanora Apex. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Amanora Crown Towers is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Amanora Crown Towers?
The registered promoter entity is City Realty & Development Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Amanora Crown Towers?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Amanora Crown Towers?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Amanora Crown Towers?
The professionals named in the filing: Architect: GNA Architects; Engineer: Ms Snehal Shinde; Chartered Accountant: R V Porwal and Associates; Chartered Accountant: SPCM and Associates; Chartered Accountant: A S Jinturkar and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Amanora Crown Towers?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback