Home / Browse projects / Thane, Maharashtra / ALPHA RESIDENCY

Completed No litigation declared Others project

ALPHA RESIDENCY

By AGNETA CONSTRUCTIONS

RG-MH-96986 · RERA P51700046254 · Last updated on MahaRERA portal: 6 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2027Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
27 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

ALPHA RESIDENCY is a Others project by AGNETA CONSTRUCTIONS in Thane, Maharashtra, registered with MahaRERA as P51700046254 on 20 Jun 2022. The registration is recorded completed; possession was promised by 30 May 2027. 31 of the 58 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameALPHA RESIDENCY
  • TypeOthers
  • Location
    • 4th Nizampura
    • Bhiwandi
    • Bhiwandi (M Corp.)
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700046254
  • ReraGenie IDRG-MH-96986

Builder

  • NameAGNETA CONSTRUCTIONS
  • Entity typePartnership
  • GSTIN27ABUFA3682K1ZR
  • PartnerAZAAN AKIL ANSARI

Key dates

this monthRegisteredJun 2022PromisedMay 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Jun 2022
  • Promised completion30 May 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed126 files

Current status

53%31 of 58 units booked
90.1%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ALPHA RESIDENCYNA8856258

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ALPHA RESIDENCY: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed124

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots124
Closed/Covered35
Open Space89

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,221 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 May 2026
LandownerVillageDistrict
PARWAZ NAZIR AHMED SUSEBhiwandi (M Corp.)Thane

Approvals and building plan

Sanctioning authorityB N M C
Permissible FSI4385.58
Proposed, not sanctioned4,386 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchASHOK NAGAR BHIWANDI
Estimated costRs 6.42 cr
Cost incurredRs 5.78 cr
Work done90.09%
BuildingWingEstimatedIncurred
ALPHA RESIDENCYNARs 5.65 crRs 5.65 cr
-NARs 77.05 lakhRs 13.40 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEURECA CONSULTANTS
EngineerEURECA CONSULTANTS
EngineerA
EngineerHAMZA MOHD ALTAF MOMIN
Chartered AccountantM M ARSIWALA & ASSOCIATES
Chartered AccountantFARIDA ATTARI & ASSOCIATES
PartnerRole in project
AGNETA CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Agneta_compressed.pdf6 May 2026
Withdrawal Update Form 2File: Engineer Agneta_compressed.pdf6 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 31-03-2026.pdf6 May 2026
Occupational CertificateFile: OC.pdf6 May 2026
Form 1File: Architect 30-06-2025_compressed.pdf7 Feb 2026
Form 2File: Engineer 30-06-2025_compressed.pdf7 Feb 2026
Form 3File: CA_certificate Alpha Residency 30-06-2025.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD 30-06-2025.pdf7 Feb 2026
Form 1File: Architect 30-09-2025_compressed.pdf7 Feb 2026
Form 2File: Engineer 30-09-2025_compressed.pdf7 Feb 2026
Form 3File: CA_certificate Alpha Residency 30-09-2025.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD 30-09-2025.pdf7 Feb 2026
Form 1File: Architect 31-12-2025_compressed.pdf7 Feb 2026
Form 2File: Engineer 31-12-2025_compressed.pdf7 Feb 2026
Form 3File: CA_certificate Alpha Residency 31-12-2025.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD 31-12-2025.pdf7 Feb 2026
Form 1File: Architect certificate_compressed.pdf20 Jun 2025
Form 2File: Engineer certificate_compressed.pdf20 Jun 2025
Form 3File: CA Certificate Form-3_compressed.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 1File: ARCHITECTS CERTIFICATE AGNETA CONSTRUCTION_compressed.pdf20 Jun 2025
Form 2File: ENGINEERS CERTIFICATE AGNETA CONSTRUCTION_compressed.pdf20 Jun 2025
Form 3File: CA_certificate Alpha Residency 30-09-2022_compressed.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 1File: ARCHITECTS CERTIFICATE AGNETA CONSTRUCTION_compressed.pdf20 Jun 2025
Form 2File: ENGINEER CERTIFICATE AGNETA CONSTRUCTION_compressed.pdf20 Jun 2025
Form 3File: CA_certificate Alpha Residency 31-12-2022_compressed.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 1File: Agneta Architects certificate_compressed.pdf20 Jun 2025
Form 2File: Agneta Engineers certificate_compressed.pdf20 Jun 2025
Form 3File: Form3 CA Alpha Residency_compressed.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 1File: ARCHITECT CERT AGNETA_compressed.pdf20 Jun 2025
Form 2File: ENGINEER CERT AGNETA_compressed.pdf20 Jun 2025
Form 3File: CA_certificate Alpha Residency 30-06-2023_NEW.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 1File: ARCHITECT CERT AGNETA_compressed.pdf20 Jun 2025
Form 2File: ENGINEER CERT AGNETA_compressed.pdf20 Jun 2025
Form 3File: CA_certificate Alpha Residency 30-06-2023_NEW.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 1File: ARCHITECT CERTIFICATE 31-12-2023-compressed.pdf20 Jun 2025
Form 2File: ENGINEER CERTIFICATE 31-12-2023-compressed.pdf20 Jun 2025
Form 3File: CA_certificate Alpha Residency 31-12-2023.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 1File: Form 1 Agneta Const_compressed.pdf20 Jun 2025
Form 2File: Form 2 Agneta Const_compressed.pdf20 Jun 2025
Form 3File: CA_certificate Alpha Residency 31-03-2024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 1File: Form 1 Architects Cert Agneta 30-06-2024_compressed.pdf20 Jun 2025
Form 2File: Form 2 Engineer Cert Agneta 30-06-2024_compressed.pdf20 Jun 2025
Form 3File: CA_certificate Alpha 30-06-2024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 1File: Form 1 Architect Cretificate.pdf20 Jun 2025
Form 2File: Form 2 Engineer Certificate.pdf20 Jun 2025
Form 3File: CA_certificate Alpha 30-09-2024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 1File: Architect Certificate.pdf20 Jun 2025
Form 2File: Engineer Certificate.pdf20 Jun 2025
Form 3File: CA_certificate Alpha 31-12-2024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 1File: Form 1 Agneta 31-03-2025_compressed.pdf20 Jun 2025
Form 2File: Form 2 Agneta 31-03-2025_compressed.pdf20 Jun 2025
Form 3File: CA_certificate Alpha Residency 31-03-2025.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Jun 2025
Form 2A (FY 2022-2023)File: Agneta Form-2A_compressed.pdf20 Jun 2025
Form 2A (FY 2023-2024)File: Form 2A Agneta Const_compressed.pdf20 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A Agneta 31-03-2025_compressed.pdf20 Jun 2025
Form 5 (FY 2022-2023)File: Form 5 Agneta Construction.pdf20 Jun 2025
Form 5 (FY 2023-2024)File: FORM 5 Agneta 31-03-2024.pdf20 Jun 2025
Form 5 (FY 2024-2025)File: FORM 5 Agneta 31-03-2025.pdf20 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_certificate Alpha 31-12-2024.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cretificate.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_certificate Alpha 30-09-2024.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Cert Agneta 30-06-2024_compressed.pdf17 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Cert Agneta 30-06-2024_compressed.pdf17 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_certificate Alpha 30-06-2024.pdf17 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Agneta Const_compressed.pdf1 Jun 2024

How this compares with Thane

53%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ALPHA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhiwandi7,600+ in Thane

Builder: AGNETA CONSTRUCTIONS

AGNETA CONSTRUCTIONS has 1 registration on MahaRERA, including ALPHA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ALPHA RESIDENCY is delayed beyond 30 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ALPHA RESIDENCY?

The registered promoter entity is AGNETA CONSTRUCTIONS, a partnership as per the filing. Its GSTIN 27ABUFA3682K1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ALPHA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ALPHA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ALPHA RESIDENCY?

The professionals named in the filing: Architect: EURECA CONSULTANTS; Engineer: EURECA CONSULTANTS; Engineer: A; Engineer: HAMZA MOHD ALTAF MOMIN; Chartered Accountant: M M ARSIWALA & ASSOCIATES; Chartered Accountant: FARIDA ATTARI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ALPHA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ALPHA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ALPHA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.