Home / Browse projects / Mumbai Suburban, Maharashtra / ALCOVE WING B
ALCOVE WING B
By Mahindra Lifespace Developers limited
RG-MH-27892 · RERA P51800024957 · Last updated on MahaRERA portal: 24 Jul 2024
Source: official MahaRERA filing
Red flags
- De-registered
- Possession 28 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ALCOVE WING B is a Residential / Group Housing project by Mahindra Lifespace Developers limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800024957 on 12 Mar 2020. Possession was promised by 30 Jun 2024 and is now 28 months past that date.
At a glance
Project
- NameALCOVE WING B
- TypeResidential / Group Housing
- Location
- VILLAGE SAKI
- OFF SAKI VIHAR ROAD
- OPPOSITE SAKI VIHAR COMPLEX CHANDIVALI
- Kurla
- Mumbai Suburban
- 400072
- Pincode400072
- RERA no.P51800024957
- ReraGenie IDRG-MH-27892
Builder
- NameMahindra Lifespace Developers limited
- Entity typeCompany
- CINL45200MH1999PLC118949
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- ChairpersonArun Kumar Tilak Raj Nanda
- Managing DirectorArvind Subramanian
- Other registrations66 more →
- Completed25 of 67
- No longer live20 lapsed, de-registered or revoked
- Declared earlier projects66 →
Key dates
Key facts
Registration and timeline
- StatusDe-registered
- Registered on12 Mar 2020
- Promised completion30 Jun 2024
- Revised completionNone
- Buildings1 building record
- Documents filed43 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ALCOVE WING B | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
ALCOVE WING B: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities17
As on 24 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Club house | Yes | 0% |
Parking filed79
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Edifice consultant Prv. Ltd |
| Engineer | WTP Cost Advisory services India Pvt. Ltd. |
| Chartered Accountant | A B D AND CO LLP |
| Chartered Accountant | P G BHAGWAT LLP |
| Partner | Role in project |
|---|---|
| Mahindra Lifespace Developers limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jan 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jan 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jan 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed43
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Tower B.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Tower B.pdf | 24 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Alcove Form 2A.pdf | 24 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Alcove Form 2A.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar 24 Alcove B Wing CA certificate.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower B.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: M-MLDL-AND-Wing B-RERA Q3_2022_23_signed.pdf | 19 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alcove B Q3_signed.pdf | 19 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alcove B Architects Certificate Q3 FY 20-21.pdf | 3 Feb 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alcove B Engineer's Certificate Q3 FY 20-21.pdf | 3 Feb 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alcove B CA Certificate Q3 FY 20-21.pdf | 3 Feb 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alcove B Architects Certificate Q2_2020_21.pdf | 24 Oct 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - BUILDING B - 30-09-2020.pdf | 24 Oct 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alcove-B CA Certificate SEPT2020.pdf | 24 Oct 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Acme Arch Certificate Alcove B Q4 FY20.pdf | 25 Aug 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Acme Engg Certificate Alcove B Q1 FY21.pdf | 25 Aug 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Alcove B Q1 FY 21.pdf | 25 Aug 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Acme Engg Certificate Alcove B Q1 FY21.pdf | 25 Aug 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Acme Engg Certificate Alcove B Q1 FY21.pdf | 25 Aug 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Alcove B March 20.pdf | 25 Aug 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Alcove B June 20.pdf | 25 Aug 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alcove - B.pdf | 9 Mar 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alcove B Dec 19 Certificate.pdf | 7 Mar 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: 2242967_FurtherCC_signed.pdf | 6 Mar 2020 |
| Details of encumbrancesFile: Declaration - No Encumbrance.pdf | 29 Feb 2020 |
| OtherFile: Declaration - Alcove.pdf | 29 Feb 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTI_A_001.pdf | 4 Feb 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alcove B Dec 19 Certificate.pdf | 4 Feb 2020 |
| Layout approvalFile: Amended approval issue letter.pdf | 31 Jan 2020 |
| Layout approvalFile: Drawing 1 to 10-New.pdf | 31 Jan 2020 |
| Layout approvalFile: Drawing 11 to 23-New.pdf | 31 Jan 2020 |
| Building plan approvalFile: Amended approval issue letter.pdf | 31 Jan 2020 |
| PAN CardFile: MLDLPAN.pdf | 31 Jan 2020 |
| Copy of the legal title reportFile: Title Certificate.pdf | 31 Jan 2020 |
| Copy of Layout Approval (in case of layout)File: Amended approval issue letter.pdf | 31 Jan 2020 |
| Copy of Layout Approval (in case of layout)File: Drawing 1 to 10-New.pdf | 31 Jan 2020 |
| Copy of Layout Approval (in case of layout)File: Drawing 11 to 23-New.pdf | 31 Jan 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended approval issue letter.pdf | 31 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: 2242967_FurtherCC_signed.pdf | 31 Jan 2020 |
| Declaration in FORM BFile: Form - B - Wing - B.pdf | 31 Jan 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: M-MLDL-AND-RERA CERTIFICATE-200129.pdf | 31 Jan 2020 |
| Proforma of Allotment letterFile: Allotment Letter - Alcove.pdf | 31 Jan 2020 |
| Proforma of Allotment letterFile: AFS - Alcove - Wing -B - MLDL share.pdf | 31 Jan 2020 |
Promoter's earlier projects16
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Windchimes | Mahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075 | 454 | Completed | Dec 2018 | Dec 2018 |
| Boisar Phase II | Gut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar | 238 | Completed | Dec 2017 | Jun 2017 |
| BOISAR Phase I | Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar | 359 | Completed | Jun 2017 | Jan 2017 |
| Lartista | Mahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 018 | 21 | Completed | Sep 2016 | Sep 2016 |
| Avadi Phase I | Block No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee | 604 | Completed | Jun 2016 | Apr 2016 |
| Ashvita | Mahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072 | 664 | Completed | Jun 2016 | May 2016 |
| Aura PH5 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 150 | Completed | Jan 2015 | Late, Sep 2016 |
| Aura PH4 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 142 | Completed | Jan 2015 | Late, Dec 2015 |
| Aura PH3 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 110 | Completed | Oct 2014 | Late, Aug 2015 |
| Aura PH2 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 166 | Completed | Nov 2013 | Late, Oct 2014 |
| Splendour Phase 2 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re | 233 | Completed | Nov 2013 | Jun 2013 |
| Aura PH1 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 231 | Completed | May 2013 | May 2013 |
| Angelica | Bldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai | 67 | Completed | Mar 2013 | Mar 2013 |
| Aspen | Bldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai | 68 | Completed | Dec 2012 | Dec 2012 |
| Splendour Phase 1 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078 | 265 | Completed | Aug 2011 | Aug 2011 |
| Chloris | Milestone 16 PART 3 Sector 19 Faridabad | 160 | Completed | Jul 2011 | Jul 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 66 other registrations, which the RERA portal never shows together
- All 43 filed documents as one ZIP, foldered, with a manifest
Keep ALCOVE WING B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OPPOSITE SAKI VIHAR COMPLEX CHANDIVALI6,700+ in Mumbai Suburban
AMARYLLIS TOWERS AND PLAZA
NAHAR BUILDERS LTD.
JANGID MEADOWS
JANGID HOME PVT LTD
NAHAR'S CHANDI VALLEY - PHASE I
NAHAR BUILDERS LIMITED
KABRA RESIDENCY PARK
AHINSA BUILDTECH PVT LTD
IBIS at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
BARBET at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
See every Mumbai Suburban project, with the district possession charts
Builder: Mahindra Lifespace Developers limited
Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that ALCOVE WING B shows as de-registered on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ALCOVE WING B is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ALCOVE WING B?
The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ALCOVE WING B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ALCOVE WING B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ALCOVE WING B?
The professionals named in the filing: Architect: Edifice consultant Prv. Ltd; Engineer: WTP Cost Advisory services India Pvt. Ltd.; Chartered Accountant: A B D AND CO LLP; Chartered Accountant: P G BHAGWAT LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ALCOVE WING B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback