ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / ALANKAR BUILDING

Completed No litigation declared Residential / Group Housing project

ALANKAR BUILDING

By PRASHANT CHANDRAKANT VAIDYA

RG-MH-12386 · RERA P51900001301 · Last updated on MahaRERA portal: 8 May 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Apr 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

ALANKAR BUILDING is a Residential / Group Housing project by PRASHANT CHANDRAKANT VAIDYA in Mumbai City, Maharashtra, registered with MahaRERA as P51900001301 on 27 Jul 2017. The registration is recorded completed; possession was promised by 30 Apr 2023. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameALANKAR BUILDING
  • TypeResidential / Group Housing
  • Location
    • MUMBAI
    • Mumbai City
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900001301
  • ReraGenie IDRG-MH-12386

Builder

  • NamePRASHANT CHANDRAKANT VAIDYA
  • Entity typeIndividual

Key dates

this monthRegisteredJul 2017First promiseOct 2021Revised toApr 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion30 Apr 2023
  • Revised completionRevised to 30 Apr 2023 (originally 30 Oct 2021)
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ALANKARNA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

ALANKAR: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 8 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
otherYes0%

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area618 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2503.0
Proposed, not sanctioned2,503 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLOWER PAREL MUMBAI-400013

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISHAL PARAB
EngineerKALYANI SAVARDEKAR
PartnerRole in project
PRASHANT CHANDRAKANT VAIDYA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900010752Oct 2021 → Oct 2022

Reason as filed by the promoter1. COVID-19 (1st Wave):- The Global Pandemic has hit India too and due to which there was Total Lockdown from March, 2020 which continued up till Aug-Sept, 2020 for which MAHARERA has granted the extension force majeure for 6 months but due to shortage of labour who have headed back to their native place due to lockdown had not come back which has impacted construction site and its timely completion. 2. COVID-19 (2nd Wave):- The Global Pandemic has hit India again in Feb, 2021 which impacted in complete/ partial Lockdown throughout the country and was more deadly than the previous wave due to

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Nov 2022

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3 (March 2023) signed.pdf8 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: fORM 4.pdf5 May 2023
Certificates of CA (Form 3)File: Form 3 (Dec 2022).pdf20 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: The Vista Society Reg certificate.PDF22 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf18 Nov 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.PDF18 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Work Completion Certificate .pdf1 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Certificate.pdf1 Nov 2022
Certificates of CA (Form 3)File: Form 3 compressed.pdf31 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch certificate.pdf4 Jul 2022
Certificates of CA (Form 3)File: RERA CERTIFICATE FORM 3.pdf4 Jul 2022
OtherFile: The Vista Society Reg certificate.PDF4 Jul 2022
OtherFile: Sold Unsold flat 300622.PDF4 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch certificate.pdf19 Apr 2022
Certificates of CA (Form 3)File: Form 3.PDF19 Apr 2022
OtherFile: surrender surplus built up area.PDF19 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate.PDF17 Jan 2022
Certificates of CA (Form 3)File: Form 3.PDF17 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf23 Oct 2021
Certificates of CA (Form 3)File: Form 3.PDF23 Oct 2021
Declaration about Commencement CertificateFile: Further CC.pdf25 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch certificate.pdf25 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf25 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf25 Aug 2021
Disclosure of sold/ booked inventoryFile: Grand Shelters-Sold -Unsold flat.PDF25 Aug 2021
Certificates of CA (Form 5)File: Form 5 2018-19.pdf25 Aug 2021
Certificates of CA (Form 5)File: Form 5 2019-20.pdf25 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf25 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf25 Aug 2021
Certificates of CA (Form 3)File: Grand Shelter (Form 3).pdf26 Jul 2021
Certificates of CA (Form 3)File: CA CERTIFICATE.PDF4 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch cert.pdf11 Jan 2021
Certificates of CA (Form 3)File: Form 3.PDF11 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architet certificate.PDF15 Oct 2020
Certificates of CA (Form 3)File: FORM 3.PDF15 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf10 Sep 2020
Certificates of CA (Form 3)File: FORM 3.PDF21 Jul 2020
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC.pdf9 Jan 2020
Certificates of CA (Form 3)File: Form 3.PDF9 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate_.pdf14 Oct 2019
Certificates of CA (Form 3)File: Form 3_.pdf14 Oct 2019
Certificates of CA (Form 3)File: CA Certificate-Form3.PDF18 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architacte Cert.PDF8 Apr 2019
Certificates of CA (Form 3)File: CA Certificate.PDF8 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: CC.PDF25 Jan 2019
Certificates of CA (Form 3)File: Form 3.pdf3 Jan 2019
Certificates of CA (Form 5)File: Form 5.PDF28 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: RERA.PDF13 Oct 2018
Certificates of CA (Form 3)File: FORM 3.pdf24 Sep 2018
Building plan approvalFile: IOD Revalidation Approved Letter.pdf18 Jun 2018
Building plan approvalFile: IOD Revalidation Approved Letter.pdf18 Jun 2018
Building Plan Approval (IOD)File: IOD Revalidation Approved Letter.pdf18 Jun 2018
Building Plan Approval (IOD)File: IOD Revalidation Approved Letter.pdf18 Jun 2018
Certificates of CA (Form 3)File: CA Certificate 180618.pdf18 Jun 2018
Declaration in FORM BFile: Form B.pdf26 Jul 2017
Layout approvalFile: Layout FINAL.pdf21 Jul 2017
Building plan approvalFile: IOD Plan.pdf21 Jul 2017
PAN CardFile: PAN Card 1.pdf21 Jul 2017
Copy of the legal title reportFile: Title Certifcate NEW.pdf21 Jul 2017
Details of encumbrancesFile: Encumbrances letter.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout FINAL.pdf21 Jul 2017
Building Plan Approval (IOD)File: IOD Plan.pdf21 Jul 2017
Declaration in FORM BFile: affidavit cum declaration form B.pdf21 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Form 1.pdf21 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Form 2 NEW.pdf21 Jul 2017
Certificates of CA (Form 3)File: C A CERTIFICATE FORM 3.pdf21 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT AND COMPLIANT FLAT SALE AGREEMENT.pdf21 Jul 2017
OtherFile: iod.pdf21 Jul 2017

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one moved by 18 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ALANKAR BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBAI780+ in Mumbai City

2 kmALANKAR BUILDINGCompleted 67Lapsed / revoked 45Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 164 registered projects within 2 km.

Builder: PRASHANT CHANDRAKANT VAIDYA

PRASHANT CHANDRAKANT VAIDYA has 1 registration on MahaRERA, including ALANKAR BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if ALANKAR BUILDING is delayed beyond 30 Apr 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ALANKAR BUILDING?

The registered promoter entity is PRASHANT CHANDRAKANT VAIDYA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ALANKAR BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ALANKAR BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ALANKAR BUILDING?

The professionals named in the filing: Architect: VISHAL PARAB; Engineer: KALYANI SAVARDEKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ALANKAR BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ALANKAR BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ALANKAR BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.