Red flags

  • 6 complaints at MahaRERA
  • Completion date moved by 29 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
6Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

AL-NASHRA HEIGHTS is a Residential / Group Housing project by UNIQUE BUILDERS AND DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700005471 on 11 Aug 2017. The registration is recorded completed; possession was promised by 15 Jun 2023. The completion date has moved by 29 months from the original filing. 6 complaints are on record with the regulator.

At a glance

Project

  • NameAL-NASHRA HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700005471
  • ReraGenie IDRG-MH-20750

Builder

  • NameUNIQUE BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersASIM ZAHIR KHOT, SIDIQUE SHAHNAWAZ BICHHU, NAD CONSTRUCTION AND TRADERS PRIVATE LIMITED NAD CONSTRUCTION AND TRADERS PRIVATE LIMITED
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseJan 2021Revised toJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion15 Jun 2023
  • Revised completionRevised to 15 Jun 2023 (originally 31 Jan 2021)
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WINGNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

WING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities18

As on 12 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
CCTV SecurityYes100%
INTERCOM AND VIDEO DOOR SECURITYYes100%
POWER BACKUP FOR LIFTS AND COMMON AREAYes100%

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,352 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
MUZAMIL NASIM KHOTKalyanThane
MOHAMMED AZAM ABDUL SHAIKHAndheriMumbai Suburban

Approvals and building plan

Permissible FSI3012.64
Proposed, not sanctioned2,571 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTILAK CHOWK, KALYAN

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectALIM A K FOUZI
EngineerMAJID DHOKLE
EngineerPRANAV ENTERPRISES
EngineerJALAL ARCHITECTS
Chartered AccountantJHS AND ASSOCIATES LLP
Chartered AccountantTHAKKAR PRAKASH AND COMPNAY
PartnerRole in project
UNIQUE BUILDERS AND DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700010525Jan 2021 → Dec 2021

Reason as filed by the promoterThe COVID-19 pandemic has badly affected a real estate sector, which was a struggling pandemic hit and large-scale exodus of migrant workers from large cities to their villages has caused additional stress in the Project called Al Nashra heights , as it relies heavily on migrant labor. All nearby residing families of Al Nashra heights are opposing and not Permitting Labour's to visit for construction activities due to fear of Covid-19 and on the other hand we are facing Problem due to shortage of labour disruption in supply chain of raw materials and other unforeseen factors, which result in d

EXT51700012150Jan 2021 → Jun 2023

Reason as filed by the promoterOccupation certificate has been received and uploaded for the project as on 15-06-2023, and possession of flats has been provided to the allottees. We also believe that QPR (Quarterly Progress Reports) till the date of OC (15-06-2023) has been uploaded. This procedural step is undertaken to adhere to the RERA extension guidelines. We kindly request you to look into the matter at the earliest and accept the OC, extend the project and complete the procedure at the earliest.

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000196338Talat FalkeM/s Unique Builders And Developers15/03/2021
CC006000000196339Talat FalkeM/s Unique Builders And Developers15/03/2021
CC006000000209960Riyaz Abdul Hamid KhanUnique Builders and Developers16/02/2022
CC006000000209792Zeenat Parvez MemonM/s. Unique Builders And Developers25/01/2022
CC006000000209826Aamir Maqsood KhanM/s. Unique Builders And Developers26/01/2022
CC006000000209827Sajid Gulam Mohammed ShaikhM/s.Unique Builders And Developers26/01/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Oct 2023

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: 03_ AL NASHRA MUNCIPAL Layout Paln till 16th Floor_ Compress.pdf12 Oct 2023
Building plan approvalFile: 01_AL NASHRA MUNCIPAL Building Plan till 16th Floor_COMPRESS.pdf12 Oct 2023
Copy of Layout Approval (in case of layout)File: 03_ AL NASHRA MUNCIPAL Layout Paln till 16th Floor_ Compress.pdf12 Oct 2023
Building Plan Approval (IOD)File: 01_AL NASHRA MUNCIPAL Building Plan till 16th Floor_COMPRESS.pdf12 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 04_CC AL NASHRA Completion till 15th floor and Commencment of 16th Floor_Compress.pdf12 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Form 2 FY 21-22.pdf12 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineering Certificate - 31-03-2023.pdf12 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineering Certificate - 31-08-2023.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-01-04-2023 to 31-08-2023.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Closing Stock Certificate as on 31-3-23.pdf12 Oct 2023
Certificates of CA (Form 3)File: form_3_21-22.pdf12 Oct 2023
Certificates of CA (Form 3)File: Form 3 Word 22-23_compressed.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf12 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Merge OC.pdf12 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT FORM_A_11zon.pdf8 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ARCHITECT FORM_A_11zon.pdf8 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER FORM_B_11zon.pdf8 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A AS ON 30-06-2022_11zon.pdf8 Jul 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD AS ON 30-06-2022 (2)_11zon.pdf8 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT 31-03-2021-Final 20-21.pdf2 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT FORM 1 FY 21-22_11zon.pdf2 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER FORM 2 FY 20-21_11zon.pdf2 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ARCHITECT FORM 1 FY 21-22_11zon.pdf2 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold FY 21-22-Final Sheet - (As per Asim Uncle).pdf2 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold FY 21-22 Unique Letter Head.pdf2 Jul 2022
Certificates of CA (Form 3)File: Form 3 20-21_11zon.pdf2 Jul 2022
Certificates of CA (Form 5)File: Form 5 20-21.pdf2 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf2 Jul 2022
Layout approvalFile: 03_ AL NASHRA MUNCIPAL Layout Paln till 16th Floor_ Compress.pdf24 Jun 2022
Building plan approvalFile: 01_AL NASHRA MUNCIPAL Building Plan till 16th Floor_COMPRESS.pdf24 Jun 2022
Copy of Layout Approval (in case of layout)File: 03_ AL NASHRA MUNCIPAL Layout Paln till 16th Floor_ Compress.pdf24 Jun 2022
Building Plan Approval (IOD)File: 01_AL NASHRA MUNCIPAL Building Plan till 16th Floor_COMPRESS.pdf24 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: 04_CC AL NASHRA Completion till 15th floor and Commencment of 16th Floor_Compress.pdf24 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-20-21.pdf24 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A -21-22_compress.pdf24 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Oc Copy.pdf24 Jun 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Certificate.pdf24 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Decl about comm.pdf12 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: New commencement Certificate.pdf12 Sep 2021
Declaration about Commencement CertificateFile: Decl about comm.pdf12 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2020_compressed.pdf12 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2021_compressed.pdf12 Sep 2021
Disclosure of sold/ booked inventoryFile: Sold Inventory 2021_compressed.pdf12 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT 31-03-2020.pdf4 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31-03-2020.pdf4 Jun 2021
Certificates of CA (Form 3)File: Form 3 SIgned_compressed.pdf4 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf16 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Scanned Form 5.pdf14 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf14 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate for uniq 001.pdf30 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf30 Jul 2019
Certificates of CA (Form 5)File: ilovepdf_jpg_to_pdf.pdf13 Oct 2018
Declaration in FORM BFile: Form B Promoter Revised.pdf29 Nov 2017
Layout approvalFile: building Layout (1).pdf30 Jul 2017
Building plan approvalFile: compressed_IOD.pdf30 Jul 2017
Copy of the legal title reportFile: TITLE CRETIFICATE.pdf30 Jul 2017
Details of encumbrancesFile: Encumbrance.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: building Layout (1).pdf30 Jul 2017
Building Plan Approval (IOD)File: compressed_IOD.pdf30 Jul 2017
Declaration in FORM BFile: compressed_Form B Promoter.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf30 Jul 2017
Proforma of Allotment letterFile: Allotment letter.pdf30 Jul 2017
Proforma of Allotment letterFile: Agreement for sale - Proforma.pdf30 Jul 2017
PAN CardFile: PAN-UNIQUE.pdf29 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 29 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AL-NASHRA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan7,600+ in Thane

2 kmAL-NASHRA HEIGHTSCompleted 93Lapsed / revoked 54Other 147Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: UNIQUE BUILDERS AND DEVELOPERS

UNIQUE BUILDERS AND DEVELOPERS has 3 registrations on MahaRERA, including AL-NASHRA HEIGHTS and MOUNT VIEW PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AL-NASHRA HEIGHTS is delayed beyond 15 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AL-NASHRA HEIGHTS?

The registered promoter entity is UNIQUE BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AL-NASHRA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AL-NASHRA HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AL-NASHRA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AL-NASHRA HEIGHTS?

The professionals named in the filing: Architect: ALIM A K FOUZI; Engineer: MAJID DHOKLE; Engineer: PRANAV ENTERPRISES; Engineer: JALAL ARCHITECTS; Chartered Accountant: JHS AND ASSOCIATES LLP; Chartered Accountant: THAKKAR PRAKASH AND COMPNAY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AL-NASHRA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AL-NASHRA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AL-NASHRA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.