Home / Browse projects / Thane, Maharashtra / AL MAWADAH RESIDENCY

Registered No litigation declared Residential / Group Housing project

AL MAWADAH RESIDENCY

By SEHER REALTY

RG-MH-18027 · RERA P51700076683 · Last updated on MahaRERA portal: 4 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
15 of 66Construction stages doneacross 6 buildings; furthest along: Slabs of Super Structure, 50%
69 of 139Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

AL MAWADAH RESIDENCY is a Residential / Group Housing project by SEHER REALTY in Thane, Maharashtra, registered with MahaRERA as P51700076683 on 20 Jun 2024. Possession is promised by 31 Dec 2030. 70 of the 139 units on this registration are recorded sold or booked, and 15 of 66 construction stages are filed complete.

At a glance

Project

  • NameAL MAWADAH RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • SONKHAR
    • MUMBRA
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700076683
  • ReraGenie IDRG-MH-18027

Builder

  • NameSEHER REALTY
  • Entity typePartnership
  • PartnersIRSHAD AHMED MUNIR KHAN, MOHAMED MUNIR JAMANTULLAH KHAN, MOHAMMED HUMAYUN SHAIKH, ARIF ALI AZEEZ MULANI, NOOR MOHAMMAD DOST MOHAMMAD KHAN, NADEEM ALTAF SHAIKH, MOHAMMED ZAHID MOTANI, AMJAD AAMIRULLA KHAN

Key dates

this monthRegisteredJun 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings6 building records
  • Documents filed90 files

Current status

50%70 of 139 units booked
19.1%Work done, per cost certificate

Figures as on 4 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA8840747
BUILDING NO 2NA8728028
BUILDING NO 3NA8728028
BUILDING NO 4NA8728028
BUILDING NO 5NA21404
BUILDING NO 6NA21404

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

BUILDING NO 120%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 220%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 320%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 429%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 532%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 632%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed241

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots241
Closed/Covered122
Open Space119
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 1222042
BUILDING NO 2172037
BUILDING NO 3152035
BUILDING NO 4222042
BUILDING NO 5242044
BUILDING NO 6221941

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,511 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 May 2025

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI11939.16
Proposed, not sanctioned8,975 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSURME PLAZA, GROUND FLOOR, OPP MILLENNIUM HOSPITAL, OLD MUMBAI PUNE ROAD, KAUSA MUMBRA - 400612
Estimated costRs 17.28 cr
Cost incurredRs 3.31 cr
Work done19.15%
BuildingWingEstimatedIncurred
BUILDING NO 1NARs 5.63 crRs 1.19 cr
BUILDING NO 2NARs 3.37 crRs 64.62 lakh
BUILDING NO 3NARs 3.37 crRs 64.62 lakh
BUILDING NO 4NARs 3.37 crRs 64.62 lakh
-NARs 56.15 lakh-
BUILDING NO 5NARs 48.21 lakhRs 9.23 lakh
BUILDING NO 6NARs 48.10 lakhRs 9.21 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRIGHTANGLE
EngineerSSCONS
Chartered AccountantAS SUTERWALA & CO
Chartered AccountantBHURANI & ASSOCIATES
Chartered AccountantSHABBAR & ASSOCIATES
PartnerRole in project
SEHER REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q4.pdf4 May 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q4.pdf4 May 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q4.pdf4 May 2026
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q3.pdf26 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q3.pdf26 Feb 2026
Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q3.pdf26 Feb 2026
Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q2.pdf16 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q2.pdf16 Jan 2026
Withdrawal Update Form 3File: CA Certificate FY 25-26-Q2.pdf16 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Audit Report FY 2024-25.pdf26 Nov 2025
Withdrawal Update Form 1File: Form 1-Architect Certificate-FY 25-26-Q1.pdf31 Jul 2025
Withdrawal Update Form 2File: Form 2-Engineer Certificate-FY 25-26-Q1.pdf31 Jul 2025
Withdrawal Update Form 3File: Form 3-CA Certificate-FY 25-26-Q1.pdf31 Jul 2025
Commencement certificateFile: Comencement Certificate.pdf28 Jul 2025
Form 1File: Architect Certificate.pdf24 May 2025
Form 2File: Engineer Certificate.pdf24 May 2025
Form 3File: CA Certificate.pdf24 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory.pdf24 May 2025
Form 1File: Architect Certificate.pdf24 May 2025
Form 2File: Engineer Certificate.pdf24 May 2025
Form 3File: CA Certificate.pdf24 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory.pdf24 May 2025
Withdrawal Update Form 1File: Architect Certificate.pdf24 May 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf24 May 2025
Withdrawal Update Form 3File: CA Certificate.pdf24 May 2025
Form 1File: Architect Certificate.pdf20 May 2025
Form 2File: Engineer Certificate.pdf20 May 2025
Form 3File: CA Certificate.pdf20 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory.pdf20 May 2025
Form 1File: Architect Certificate.pdf20 May 2025
Form 2File: CA Certificate.pdf20 May 2025
Form 3File: Sold Booked Inventory.pdf20 May 2025
Disclosure of Sold and Booked InventoryFile: Architect Certificate.pdf20 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q4.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory Fy 24-25-Q4.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 24-25-Q3.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q3.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory FY 24-25-Q3.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 24-25- Q1.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 24-25- Q2.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 24-25- Q1.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 24-25- Q2.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q1.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24-25-Q2.pdf23 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 24-25- Q1.pdf23 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory FY 24-25- Q2.pdf23 Nov 2024
Other - LegalFile: Partnership Deed.pdf13 Jun 2024
Other - LegalFile: Page 1 to 11 Upload.pdf13 Jun 2024
Other - LegalFile: Page 12 to 22 Upload.pdf13 Jun 2024
Other - LegalFile: Page 23 to 33 Upload.pdf13 Jun 2024
Other - LegalFile: Page 34 to 44 Upload.pdf13 Jun 2024
Other - LegalFile: Page 45 to 55 Upload.pdf13 Jun 2024
Other - LegalFile: Page 56 to 66 Upload.pdf13 Jun 2024
Other - LegalFile: Page 67 to 73 Upload.pdf13 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf7 Jun 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf7 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf7 Jun 2024
Other - TechnicalFile: CC and Declaration.pdf7 Jun 2024
Other - TechnicalFile: Partnership Deed.pdf7 Jun 2024
Other - TechnicalFile: Annexure A- Declaration cum undertaking.pdf7 Jun 2024
Other - TechnicalFile: Declaration for Land Owner.pdf7 Jun 2024
Declaration in FORM BFile: Form B Declaration.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf8 May 2024
Proforma of Allotment letterFile: Allotment Letter.pdf8 May 2024
Layout approvalFile: Layout Plan.pdf25 Apr 2024
Building plan approvalFile: Building 1 Plan.pdf25 Apr 2024
Building plan approvalFile: Building 2 Plan.pdf25 Apr 2024
Building plan approvalFile: Building 3 Plan.pdf25 Apr 2024
Building plan approvalFile: Building 4 Plan.pdf25 Apr 2024
Building plan approvalFile: Building 5 Plan.pdf25 Apr 2024
Building plan approvalFile: Building 6 Plan.pdf25 Apr 2024
PAN CardFile: Pan Card.pdf25 Apr 2024
Copy of the legal title reportFile: Title Certificate.pdf25 Apr 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance.pdf25 Apr 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance.pdf25 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 1 Plan.pdf25 Apr 2024

How this compares with Thane

50%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AL MAWADAH RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBRA7,600+ in Thane

2 kmAL MAWADAH RESIDENCYCompleted 45Lapsed / revoked 27Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 114 registered projects within 2 km.

Builder: SEHER REALTY

SEHER REALTY has 1 registration on MahaRERA, including AL MAWADAH RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AL MAWADAH RESIDENCY is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AL MAWADAH RESIDENCY?

The registered promoter entity is SEHER REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AL MAWADAH RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AL MAWADAH RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AL MAWADAH RESIDENCY?

The professionals named in the filing: Architect: RIGHTANGLE; Engineer: SSCONS; Chartered Accountant: AS SUTERWALA & CO; Chartered Accountant: BHURANI & ASSOCIATES; Chartered Accountant: SHABBAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AL MAWADAH RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AL MAWADAH RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AL MAWADAH RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.