Home / Browse projects / Thane, Maharashtra / AL BALAD RESIDENCY

Registered No litigation declared Residential / Group Housing project

AL BALAD RESIDENCY

By UNITY INFRA

RG-MH-06119 · RERA P51700053215 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 33Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 25%
137 of 207Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

AL BALAD RESIDENCY is a Residential / Group Housing project by UNITY INFRA in Thane, Maharashtra, registered with MahaRERA as P51700053215 on 23 Oct 2023. Possession is promised by 31 Dec 2028. 70 of the 207 units on this registration are recorded sold or booked, and 4 of 33 construction stages are filed complete.

At a glance

Project

  • NameAL BALAD RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • SECTOR NO 09
    • SONKHAR
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053215
  • ReraGenie IDRG-MH-06119

Builder

  • NameUNITY INFRA
  • Entity typePartnership
  • PartnersAZHARUDDIN ASGAR SURME, IQBAL MUKHTAR SARDAR, MUNIR AHMAD HASAN MIYA SURME, NADEEM ALTAF SHAIKH, NABEEL FARHAN AZMI
  • Other registrations4 more →
  • Completed1 of 5

Key dates

this monthRegisteredOct 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed105 files

Current status

34%70 of 207 units booked

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AL BALAD RESIDENCY BLDG NO 1 A AND B WINGSNA100541367
AL BALAD RESIDENCY BLDG NO 2 A AND B WINGSNA5084084
AL BALAD RESIDENCY BLDG NO 3 A AND B WINGSNA4056056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 25%.

AL BALAD RESIDENCY BLDG NO 1 A AND B WINGS41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor25%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AL BALAD RESIDENCY BLDG NO 2 A AND B WINGS0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AL BALAD RESIDENCY BLDG NO 3 A AND B WINGS0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed127

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots127
Open Space127
BuildingOpen SpaceTotal
AL BALAD RESIDENCY BLDG NO 1 A AND B WINGS3131
AL BALAD RESIDENCY BLDG NO 2 A AND B WINGS7575
AL BALAD RESIDENCY BLDG NO 3 A AND B WINGS2121

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,998 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 May 2025
LandownerVillageDistrict
NADEEM ALTAF SHAIKHThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityTOWN PLANNING OFFICER THANE
Permissible FSI7068.39
Proposed, not sanctioned7,068 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch4 GF SURME PLAZA OLD MUMBAI PUNE ROAD KAUSA, MUMBRA THANE 400612

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUVARNA GHOSH
EngineerASSOCIATED STRUCTURAL ENGINEERS LLP
Chartered AccountantMUHAMMED AZAM
Chartered AccountantM.AZAM & CO.
Chartered AccountantAMENA F MOMIN & CO
Chartered AccountantNEHA WAFID KHAN
PartnerRole in project
UNITY INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM-1 Q4.pdf13 May 2026
Form 2File: FORM-2 Q4.pdf13 May 2026
Form 3File: FORM-3 Q4.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY Q4.pdf13 May 2026
Form 1File: FORM I 31-12-2023.pdf6 Mar 2026
Form 2File: FORM-2 DEC 2023.pdf6 Mar 2026
Form 3File: Form 3 CA CERTIFOCATE 31-12-2023.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: STATEMENT SOLD INVENTORY DEC QTR 2023.pdf6 Mar 2026
Form 1File: FORM I 31-03-2024.pdf6 Mar 2026
Form 2File: FORM-2 MARCH 2024.pdf6 Mar 2026
Form 3File: Form 3 CA CERTIFOCATE 31-03-2024.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: STATEMENT SOLD INVENTORY MARCH QTR 2024.pdf6 Mar 2026
Form 1File: FORM I 30-06-2024.pdf6 Mar 2026
Form 2File: FORM-2 JUNE 2024.pdf6 Mar 2026
Form 3File: Form 3 CA CERTIFOCATE 30-06-2024.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: STATEMENT SOLD INVENTORY JUNE QTR 2024.pdf6 Mar 2026
Form 1File: FORM-1 SEPT 2024.pdf6 Mar 2026
Form 2File: FORM-2 SEPT 2024.pdf6 Mar 2026
Form 3File: Form 3 CA CERTIFOCATE 30-09-2024.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: STATEMENT SOLD INVENTORY SEP QTR 2024.pdf6 Mar 2026
Form 5 (FY 2024-2025)File: FORM 5 2024-25.pdf2 Mar 2026
Form 5 (FY 2023-2024)File: FORM 5 FY 2023-24.pdf2 Mar 2026
Form 1File: FORM-1 DEC QTR.pdf27 Feb 2026
Form 2File: FORM-2 DEC QTR.pdf27 Feb 2026
Form 3File: FORM-3 DEC QTR 2025.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY DEC 2025.pdf27 Feb 2026
Form 1File: Form-1.pdf28 Jan 2026
Form 2File: Form-2.pdf28 Jan 2026
Form 3File: FORM 3.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: STATEMENT OF SOLD INVENTORY 30-06-2025.pdf28 Jan 2026
Form 1File: FORM I.pdf28 Jan 2026
Form 2File: FORM II.pdf28 Jan 2026
Form 3File: FORM3.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: INVENTORY SOLD.pdf28 Jan 2026
Form 1File: FORM I DEC2024.pdf4 Jun 2025
Form 2File: FORM 2 DCE 2024.pdf4 Jun 2025
Form 3File: FORM 3 DEC 2024_compressed.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: STATEMENT SOLD INVENTORY DEC 2024.pdf4 Jun 2025
Form 1File: FORM I MARCH 2025.pdf4 Jun 2025
Form 2File: FORM 2 MARCH 2025.pdf4 Jun 2025
Form 3File: FORM 3 MARCH 2025_compressed.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: STATEMENT SOLD INVENTORY MARCH 2025.pdf4 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 2023-24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 2023-24.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I 31-03-2024.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I 31-12-2023.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I 30-06-2024.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30-09-2024_11zon (1).pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 1 31-12-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 2-31-12-2023.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 1 31-03-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 2 -31-03-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 3-31-03-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-BLDG 1 30-06-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 2-30-06-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 1-30-09-2024_.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 2-30-09-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 3-30-09-2024.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFOCATE 31-12-2023.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFOCATE 31-03-2024.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFOCATE 30-06-2024.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFOCATE 30-09-2024.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I 31-12-2023.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I 30-06-2024.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30-09-2024_11zon (1).pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I 31-03-2024.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFOCATE 31-12-2023.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFOCATE 31-03-2024.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFOCATE 30-06-2024.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFOCATE 30-09-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 2-31-12-2023.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 3-30-09-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 2-30-09-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 1-30-09-2024_.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 2-30-06-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-BLDG 1 30-06-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 3-31-03-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 2 -31-03-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 1 31-03-2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG 1 31-12-2024.pdf6 Oct 2024

How this compares with Thane

34%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AL BALAD RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SONKHAR7,600+ in Thane

2 kmAL BALAD RESIDENCYCompleted 35Lapsed / revoked 22Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: UNITY INFRA

UNITY INFRA has 5 registrations on MahaRERA, including UNITY PRIDE and NAYAN-VASTU HERITAGE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AL BALAD RESIDENCY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AL BALAD RESIDENCY?

The registered promoter entity is UNITY INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AL BALAD RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AL BALAD RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AL BALAD RESIDENCY?

The professionals named in the filing: Architect: SUVARNA GHOSH; Engineer: ASSOCIATED STRUCTURAL ENGINEERS LLP; Chartered Accountant: MUHAMMED AZAM; Chartered Accountant: M.AZAM & CO.; Chartered Accountant: AMENA F MOMIN & CO; Chartered Accountant: NEHA WAFID KHAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AL BALAD RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AL BALAD RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AL BALAD RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.