Home / Browse projects / Thane, Maharashtra / AL AMIN TOWER
AL AMIN TOWER
By S V BUILDERS
RG-MH-29530 · RERA P51700028707 · Last updated on MahaRERA portal: 29 Aug 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 42 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AL AMIN TOWER is a Residential / Group Housing project by S V BUILDERS in Thane, Maharashtra, registered with MahaRERA as P51700028707 on 25 Mar 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 42 months from the original filing. 16 of the 40 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameAL AMIN TOWER
- TypeResidential / Group Housing
- Location
- OPP KARGA MASJID SAUDAGAR MOHALLA
- BHIWANDI
- Bhiwandi (M Corp.)
- Thane
- 421302
- Pincode421302
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700028707
- ReraGenie IDRG-MH-29530
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Mar 2021
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2023)
- Buildings1 building record
- Documents filed95 files
Current status
Figures as on 29 Aug 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AL AMIN TOWER | NA | 5 | 5 | 40 | 0 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 75%.
AL AMIN TOWER: 70% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MOHD ALI MOHD AMIN KHATIB | Bhiwandi (M Corp.) | Thane |
| JAVED MAZHER AGHA | Bhiwandi (M Corp.) | Thane |
| MAQBOOL AB HAMEED NAKHUDA | Bhiwandi (M Corp.) | Thane |
| SAKIB ABDUL HAMID NAKHUDA | Bhiwandi (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| AL AMIN TOWER | NA | Rs 3.70 cr | Rs 3.39 cr |
| - | NA | Rs 28.47 lakh | Rs 26.07 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NAKHUDA ASSOCIATES |
| Engineer | EBAD ASSOCIATES |
| Chartered Accountant | P S JHABAK & CO |
| Chartered Accountant | SHRIPAL LALITHAIN AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| S V BUILDERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOur building is 85% Completed and we require extension till 31/12/2026 to complete and obtain O.C from BNCMC.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12501292 | Shams Tabrez Asghar Ali Ansari | S V BUILDERS | 18/04/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Mar 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Mar 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Mar 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 SV SEPT23.pdf | 29 Aug 2025 |
| Form 2File: FORM 2 SV SEPT 23.pdf | 29 Aug 2025 |
| Form 3File: FORM 3 SV SEPT 23.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: JUNE 23 SOLD UNSOLD.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DEC23 SOLD UNSOLD.pdf | 29 Aug 2025 |
| Form 3File: FORM 3 SV DECEMBER 23.pdf | 29 Aug 2025 |
| Form 2File: FORM 2 SV DEC 23.pdf | 29 Aug 2025 |
| Form 1File: FORM 1 SV DEC 23.pdf | 29 Aug 2025 |
| Form 1File: FORM 1 SV MARCH 24.pdf | 29 Aug 2025 |
| Form 2File: FORM 2 SV MAR 24.pdf | 29 Aug 2025 |
| Form 3File: FORM 3 SV MARCH 24.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: june 24 sold unsold.pdf | 29 Aug 2025 |
| Form 3File: FORM 3 SV JUNE 24.pdf | 29 Aug 2025 |
| Form 2File: FORM 2 SV JUNE 24.pdf | 29 Aug 2025 |
| Form 1File: FORM 1 SV JUNE 24.pdf | 29 Aug 2025 |
| Form 1File: FORM 1 SV SEPT 24.pdf | 29 Aug 2025 |
| Form 2File: FORM 2 SV SEPT 24.pdf | 29 Aug 2025 |
| Form 3File: FORM 3 SV SEPT 24.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: sept 24 sold unsold.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: dec 24 sold unsold.pdf | 29 Aug 2025 |
| Form 3File: FORM 3 SV DEC 24.pdf | 29 Aug 2025 |
| Form 2File: FORM 2 SV DEC 24.pdf | 29 Aug 2025 |
| Form 1File: FORM 1 SV DEC 24.pdf | 29 Aug 2025 |
| Form 1File: FORM 1 SV MARCH 25.pdf | 29 Aug 2025 |
| Form 2File: FORM 2 SV MARCH 25.pdf | 29 Aug 2025 |
| Form 3File: FORM 2 SV MARCH 25.pdf | 29 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsod march 25.pdf | 29 Aug 2025 |
| Withdrawal Update Form 1File: FORM 1 SV JUNE 25.pdf | 29 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 SV JUNE 25.pdf | 29 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 SV june 25 revised.pdf | 29 Aug 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 FY 24-25.....pdf | 29 Aug 2025 |
| Form 1File: FORM 1 SV MARCH 21.pdf | 12 Jul 2025 |
| Form 2File: FORM 2 SV MAR 21.pdf | 12 Jul 2025 |
| Form 3File: FORM 3 SV JUNE 21.pdf | 12 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration signed.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf | 12 Jul 2025 |
| Form 1File: FORM 1 SV JUNET 21.pdf | 12 Jul 2025 |
| Form 2File: FORM 2 SV JUNE 21.pdf | 12 Jul 2025 |
| Form 3File: FORM 3 SV JUNE 21.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf | 12 Jul 2025 |
| Form 1File: FORM 1 SV SEPT 21.pdf | 12 Jul 2025 |
| Form 2File: FORM 2 SV SEPT 21.pdf | 12 Jul 2025 |
| Form 3File: FORM 3 SV SEPT 21.pdf | 12 Jul 2025 |
| Form 3File: FORM 3 SV DEC 2021.pdf | 12 Jul 2025 |
| Form 1File: FORM 1 SV DEC 21.pdf | 12 Jul 2025 |
| Form 2File: FORM 2 SV DEC 21.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf | 12 Jul 2025 |
| Form 1File: FORM 1 SV MARCH 22.pdf | 12 Jul 2025 |
| Form 2File: FORM 2 SV MAR 22.pdf | 12 Jul 2025 |
| Form 3File: FORM 2 SV MAR 22.pdf | 12 Jul 2025 |
| Form 2File: FORM 2 SV JUNE 22.pdf | 12 Jul 2025 |
| Form 1File: FORM 1 SV JUNE 22.pdf | 12 Jul 2025 |
| Form 3File: FORM 3 SV JUNE 22.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf | 12 Jul 2025 |
| Form 1File: FORM 1 SV SEPT 22.pdf | 12 Jul 2025 |
| Form 2File: FORM 2 SV SEPT 22.pdf | 12 Jul 2025 |
| Form 3File: FORM 3 SV SEPT 22.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DEC 22 SOLD UNSOLD.pdf | 12 Jul 2025 |
| Form 1File: FORM 1 SV DEC 22.pdf | 12 Jul 2025 |
| Form 2File: FORM 2 SV DEC 22.pdf | 12 Jul 2025 |
| Form 3File: FORM 3 SV DECEMBER 22.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DEC 22 SOLD UNSOLD.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: MARCH 23 SOLD UNSOLD.pdf | 12 Jul 2025 |
| Form 1File: FORM 1 SV MARCH 23.pdf | 12 Jul 2025 |
| Form 2File: FORM 2 SV MARCH 23.pdf | 12 Jul 2025 |
| Form 3File: FORM 3 SV MARCH 23.pdf | 12 Jul 2025 |
| Form 3File: FORM 3 SV JUNE 23.pdf | 12 Jul 2025 |
| Form 1File: FORM 1 SV JUNE 23.pdf | 12 Jul 2025 |
| Form 2File: FORM 2 SV JUNE 23.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: JUNE 23 SOLD UNSOLD.pdf | 12 Jul 2025 |
| Building plan approvalFile: Approved Plan.pdf | 18 Mar 2021 |
| Copy of the legal title reportFile: Title Certificate Form A.pdf | 18 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved Plan.pdf | 18 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Permission.pdf | 18 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth Certificate.pdf | 18 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth Certificate1.pdf | 18 Mar 2021 |
| PAN CardFile: PAN OF SVBUILDERS.pdf | 15 Mar 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep AL AMIN TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHIWANDI7,600+ in Thane
Filed coordinates, straight-line distance. 91 registered projects within 2 km.
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: S V BUILDERS
S V BUILDERS has 3 registrations on MahaRERA, including GAJANAN PLAZA 3 and AL AMIN TOWER. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if AL AMIN TOWER is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AL AMIN TOWER?
The registered promoter entity is S V BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AL AMIN TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AL AMIN TOWER?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for AL AMIN TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AL AMIN TOWER?
The professionals named in the filing: Architect: NAKHUDA ASSOCIATES; Engineer: EBAD ASSOCIATES; Chartered Accountant: P S JHABAK & CO; Chartered Accountant: SHRIPAL LALITHAIN AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AL AMIN TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback