ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / AL AMIN TOWER

Registered No litigation declared Residential / Group Housing project

AL AMIN TOWER

By S V BUILDERS

RG-MH-29530 · RERA P51700028707 · Last updated on MahaRERA portal: 29 Aug 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 42 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 42 months from the original
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 75%
24 of 40Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

AL AMIN TOWER is a Residential / Group Housing project by S V BUILDERS in Thane, Maharashtra, registered with MahaRERA as P51700028707 on 25 Mar 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 42 months from the original filing. 16 of the 40 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAL AMIN TOWER
  • TypeResidential / Group Housing
  • Location
    • OPP KARGA MASJID SAUDAGAR MOHALLA
    • BHIWANDI
    • Bhiwandi (M Corp.)
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700028707
  • ReraGenie IDRG-MH-29530

Builder

  • NameS V BUILDERS
  • Entity typePartnership
  • PartnersWASIM RAFIQUE KASKAR, SHARFUDDIN AMIRSAHEB BAHAUDDIN
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2021First promiseJun 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Mar 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed95 files

Current status

40%16 of 40 units booked
91.6%Work done, per cost certificate

Figures as on 29 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AL AMIN TOWERNA5540040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 75%.

AL AMIN TOWER: 70% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area796 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Declared on16 May 2025
LandownerVillageDistrict
MOHD ALI MOHD AMIN KHATIBBhiwandi (M Corp.)Thane
JAVED MAZHER AGHABhiwandi (M Corp.)Thane
MAQBOOL AB HAMEED NAKHUDABhiwandi (M Corp.)Thane
SAKIB ABDUL HAMID NAKHUDABhiwandi (M Corp.)Thane

Approvals and building plan

Sanctioning authorityBNCMC
Permissible FSI899.56
Proposed, not sanctioned900 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch192/1 ARADHNA AND ANIK BUILDING TELIPADA DHAMANKAR NAKA BHIWANDI THANE
Estimated costRs 3.99 cr
Cost incurredRs 3.65 cr
Work done91.57%
BuildingWingEstimatedIncurred
AL AMIN TOWERNARs 3.70 crRs 3.39 cr
-NARs 28.47 lakhRs 26.07 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNAKHUDA ASSOCIATES
EngineerEBAD ASSOCIATES
Chartered AccountantP S JHABAK & CO
Chartered AccountantSHRIPAL LALITHAIN AND ASSOCIATES
PartnerRole in project
S V BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07082502331Jun 2023 → Dec 2026

Reason as filed by the promoterOur building is 85% Completed and we require extension till 31/12/2026 to complete and obtain O.C from BNCMC.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501292Shams Tabrez Asghar Ali AnsariS V BUILDERS18/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 SV SEPT23.pdf29 Aug 2025
Form 2File: FORM 2 SV SEPT 23.pdf29 Aug 2025
Form 3File: FORM 3 SV SEPT 23.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: JUNE 23 SOLD UNSOLD.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: DEC23 SOLD UNSOLD.pdf29 Aug 2025
Form 3File: FORM 3 SV DECEMBER 23.pdf29 Aug 2025
Form 2File: FORM 2 SV DEC 23.pdf29 Aug 2025
Form 1File: FORM 1 SV DEC 23.pdf29 Aug 2025
Form 1File: FORM 1 SV MARCH 24.pdf29 Aug 2025
Form 2File: FORM 2 SV MAR 24.pdf29 Aug 2025
Form 3File: FORM 3 SV MARCH 24.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: june 24 sold unsold.pdf29 Aug 2025
Form 3File: FORM 3 SV JUNE 24.pdf29 Aug 2025
Form 2File: FORM 2 SV JUNE 24.pdf29 Aug 2025
Form 1File: FORM 1 SV JUNE 24.pdf29 Aug 2025
Form 1File: FORM 1 SV SEPT 24.pdf29 Aug 2025
Form 2File: FORM 2 SV SEPT 24.pdf29 Aug 2025
Form 3File: FORM 3 SV SEPT 24.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: sept 24 sold unsold.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: dec 24 sold unsold.pdf29 Aug 2025
Form 3File: FORM 3 SV DEC 24.pdf29 Aug 2025
Form 2File: FORM 2 SV DEC 24.pdf29 Aug 2025
Form 1File: FORM 1 SV DEC 24.pdf29 Aug 2025
Form 1File: FORM 1 SV MARCH 25.pdf29 Aug 2025
Form 2File: FORM 2 SV MARCH 25.pdf29 Aug 2025
Form 3File: FORM 2 SV MARCH 25.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsod march 25.pdf29 Aug 2025
Withdrawal Update Form 1File: FORM 1 SV JUNE 25.pdf29 Aug 2025
Withdrawal Update Form 2File: FORM 2 SV JUNE 25.pdf29 Aug 2025
Withdrawal Update Form 3File: FORM 3 SV june 25 revised.pdf29 Aug 2025
Form 5 (FY 2024-2025)File: FORM 5 FY 24-25.....pdf29 Aug 2025
Form 1File: FORM 1 SV MARCH 21.pdf12 Jul 2025
Form 2File: FORM 2 SV MAR 21.pdf12 Jul 2025
Form 3File: FORM 3 SV JUNE 21.pdf12 Jul 2025
Self-declaration of Quarterly ProgressFile: self declaration signed.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf12 Jul 2025
Form 1File: FORM 1 SV JUNET 21.pdf12 Jul 2025
Form 2File: FORM 2 SV JUNE 21.pdf12 Jul 2025
Form 3File: FORM 3 SV JUNE 21.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf12 Jul 2025
Form 1File: FORM 1 SV SEPT 21.pdf12 Jul 2025
Form 2File: FORM 2 SV SEPT 21.pdf12 Jul 2025
Form 3File: FORM 3 SV SEPT 21.pdf12 Jul 2025
Form 3File: FORM 3 SV DEC 2021.pdf12 Jul 2025
Form 1File: FORM 1 SV DEC 21.pdf12 Jul 2025
Form 2File: FORM 2 SV DEC 21.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf12 Jul 2025
Form 1File: FORM 1 SV MARCH 22.pdf12 Jul 2025
Form 2File: FORM 2 SV MAR 22.pdf12 Jul 2025
Form 3File: FORM 2 SV MAR 22.pdf12 Jul 2025
Form 2File: FORM 2 SV JUNE 22.pdf12 Jul 2025
Form 1File: FORM 1 SV JUNE 22.pdf12 Jul 2025
Form 3File: FORM 3 SV JUNE 22.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: march 24 sold unsold.pdf12 Jul 2025
Form 1File: FORM 1 SV SEPT 22.pdf12 Jul 2025
Form 2File: FORM 2 SV SEPT 22.pdf12 Jul 2025
Form 3File: FORM 3 SV SEPT 22.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: DEC 22 SOLD UNSOLD.pdf12 Jul 2025
Form 1File: FORM 1 SV DEC 22.pdf12 Jul 2025
Form 2File: FORM 2 SV DEC 22.pdf12 Jul 2025
Form 3File: FORM 3 SV DECEMBER 22.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: DEC 22 SOLD UNSOLD.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: MARCH 23 SOLD UNSOLD.pdf12 Jul 2025
Form 1File: FORM 1 SV MARCH 23.pdf12 Jul 2025
Form 2File: FORM 2 SV MARCH 23.pdf12 Jul 2025
Form 3File: FORM 3 SV MARCH 23.pdf12 Jul 2025
Form 3File: FORM 3 SV JUNE 23.pdf12 Jul 2025
Form 1File: FORM 1 SV JUNE 23.pdf12 Jul 2025
Form 2File: FORM 2 SV JUNE 23.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: JUNE 23 SOLD UNSOLD.pdf12 Jul 2025
Building plan approvalFile: Approved Plan.pdf18 Mar 2021
Copy of the legal title reportFile: Title Certificate Form A.pdf18 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan.pdf18 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: Permission.pdf18 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: Plinth Certificate.pdf18 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: Plinth Certificate1.pdf18 Mar 2021
PAN CardFile: PAN OF SVBUILDERS.pdf15 Mar 2021

How this compares with Thane

40%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 42 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AL AMIN TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHIWANDI7,600+ in Thane

2 kmAL AMIN TOWERCompleted 39Lapsed / revoked 30Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: S V BUILDERS

S V BUILDERS has 3 registrations on MahaRERA, including GAJANAN PLAZA 3 and AL AMIN TOWER. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AL AMIN TOWER is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AL AMIN TOWER?

The registered promoter entity is S V BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AL AMIN TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AL AMIN TOWER?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AL AMIN TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AL AMIN TOWER?

The professionals named in the filing: Architect: NAKHUDA ASSOCIATES; Engineer: EBAD ASSOCIATES; Chartered Accountant: P S JHABAK & CO; Chartered Accountant: SHRIPAL LALITHAIN AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AL AMIN TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AL AMIN TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AL AMIN TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.