AL ABID RESIDENCY

By VRUKSH DEVELOPERS

RG-MH-42992 · RERA P52800017174 · Last updated on MahaRERA portal: 26 Jul 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 54 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 54 months from the original
3 of 11Construction stages donefurthest along: Staircases, 70%
31 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 29 documents Report an error

AL ABID RESIDENCY is a Others project by VRUKSH DEVELOPERS in Ratnagiri, Maharashtra, registered with MahaRERA as P52800017174 on 17 Jul 2018. Possession is promised by 31 Dec 2027. The completion date has moved by 54 months from the original filing. 1 of the 32 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameAL ABID RESIDENCY
  • TypeOthers
  • Location
    • S NO 250/A/1
    • ZADGAON
    • Zadgaon CT
    • Ratnagiri
    • 415612
  • Pincode415612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800017174
  • ReraGenie IDRG-MH-42992

Builder

  • NameVRUKSH DEVELOPERS
  • Entity typePartnership

Key dates

this monthRegisteredJul 2018First promiseJun 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jul 2018
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed29 files

Current status

3%1 of 32 units booked
92.7%Work done, per cost certificate

Figures as on 26 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
al abid rsidencyNA99221032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 70%.

al abid rsidency: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes30%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered25
Open Space20

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area872 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityRatnagiri Municipal Council
Permissible FSI2281.34
Proposed, not sanctioned1,802 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANTAKRUZ SANGAM CHS S V ROAD MUMBAI - 400054
Estimated costRs 1.92 cr
Cost incurredRs 1.78 cr
Work done92.71%
BuildingWingEstimatedIncurred
al abid rsidencyNARs 1.92 crRs 1.78 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectALTAF BIJALI
EngineerSANDEEP SHETYE
EngineerMohammed Salim Bilal Matiyat
Chartered AccountantSaurabh Dattaram Gawali
Chartered AccountantOmkar A Sardesai
PartnerRole in project
VRUKSH DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52800025553Jun 2023 → Dec 2027

Reason as filed by the promoterDue to financial crises and unfavorable market conditions, the project work was halted for a period, causing a delay in its progress.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed29

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Blueprint.pdf26 Jul 2025
Withdrawal Update Form 1File: Architect Certificate 30-06-2025.pdf26 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate 30-06-2025.pdf26 Jul 2025
Withdrawal Update Form 3File: CA Certificate 30-06-2025.pdf26 Jul 2025
Form 1File: Architect Certificate 31-12-2024.pdf22 Jul 2025
Form 2File: Engineer Certificate 31-12-2024.pdf22 Jul 2025
Form 3File: CA Certificate 31-12-2024.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 31-12-2024.pdf22 Jul 2025
Form 1File: Architect Certificate 31-03-2025.pdf22 Jul 2025
Form 2File: Engineer Certificate 31-03-2025.pdf22 Jul 2025
Form 3File: CA Certificate 31-03-2025.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 31-03-2025.pdf22 Jul 2025
Form 1File: Architect Certificate 30-06-2025.pdf22 Jul 2025
Form 2File: Engineer Certificate 30-06-2024.pdf22 Jul 2025
Form 3File: CA Certificate 30-06-2025.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 30-06-2025.pdf22 Jul 2025
Layout approvalFile: LAYOUT PLAN.pdf9 Jun 2018
Building plan approvalFile: LAYOUT PLAN.pdf9 Jun 2018
PAN CardFile: company pan.pdf9 Jun 2018
Copy of the legal title reportFile: LEGAL TITLE (1).pdf9 Jun 2018
Details of encumbrancesFile: encumbrance.pdf9 Jun 2018
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf9 Jun 2018
Building Plan Approval (IOD)File: LAYOUT PLAN.pdf9 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT (1).pdf9 Jun 2018
Declaration in FORM BFile: form b (1).pdf9 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arkitect (1).pdf9 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer (1).pdf9 Jun 2018
Certificates of CA (Form 3)File: CA CERFITICATE (1).pdf9 Jun 2018
Proforma of Allotment letterFile: SALE DEED (1).pdf9 Jun 2018

How this compares with Ratnagiri

3%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one moved by 54 months
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep AL ABID RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ZADGAON1,100+ in Ratnagiri

2 kmAL ABID RESIDENCYCompleted 31Lapsed / revoked 7Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: VRUKSH DEVELOPERS

VRUKSH DEVELOPERS has 1 registration on MahaRERA, including AL ABID RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if AL ABID RESIDENCY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AL ABID RESIDENCY?

The registered promoter entity is VRUKSH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AL ABID RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AL ABID RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AL ABID RESIDENCY?

The professionals named in the filing: Architect: ALTAF BIJALI; Engineer: SANDEEP SHETYE; Engineer: Mohammed Salim Bilal Matiyat; Chartered Accountant: Saurabh Dattaram Gawali; Chartered Accountant: Omkar A Sardesai. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AL ABID RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AL ABID RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AL ABID RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.