Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
11 of 11Construction stages doneevery applicable stage filed complete
13 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

AKSHAY SHRUSHTI is a Residential / Group Housing project by AKSHAY GROUP in Pune, Maharashtra, registered with MahaRERA as P52100050484 on 17 Apr 2023. Possession is promised by 1 Mar 2028. 43 of the 56 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameAKSHAY SHRUSHTI
  • TypeResidential / Group Housing
  • Location
    • SADASHIV PETH
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411030
  • Pincode411030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050484
  • ReraGenie IDRG-MH-88411

Builder

  • NameAKSHAY GROUP
  • Entity typePartnership
  • PartnersHASMUKH MANGILAL BAFNA, MAHAVIR MANGILAL BAFNA, PRAKASH JAVERCHAND OSWAL, ANSH SANJAY SONAYYA, ASHOK HANSRAJ OSWAL

Key dates

this monthRegisteredApr 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Apr 2023
  • Promised completion1 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

77%43 of 56 units booked
99.5%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AKSHAY SHRUSHTINA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

AKSHAY SHRUSHTI: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered80

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,009 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Apr 2026

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI4142.43
Proposed, not sanctioned4,035 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch2065 SADASHIV PETH SANE GURUJI MARG
Estimated costRs 16.09 cr
Cost incurredRs 16.02 cr
Work done99.54%
BuildingWingEstimatedIncurred
AKSHAY SHRUSHTINARs 16.09 crRs 16.02 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectABHAY JOSHI
EngineerSUNIL MUTALIK
EngineerPrassana Bhumkar
EngineerAshutosh Nighut
Chartered AccountantYASHWANT KHADKIKAR
Chartered AccountantVimalchand Jain
PartnerRole in project
AKSHAY GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Mar 2028

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 AG.pdf22 Apr 2026
Withdrawal Update Form 2File: FORM 2 AG.pdf22 Apr 2026
Withdrawal Update Form 3File: FORM 3 AG.pdf22 Apr 2026
Withdrawal Update Form 1File: AKSHAY SHRUSHTI FORM 1.pdf25 Feb 2026
Withdrawal Update Form 2File: AKSHAY SHRUSHTI FORM 2.pdf25 Feb 2026
Withdrawal Update Form 3File: AKSHAY SHRUSHTI FORM 3_compressed.pdf25 Feb 2026
Withdrawal Update Form 1File: AKSHAY GROUP FORM 1.pdf29 Oct 2025
Withdrawal Update Form 2File: AKSHAY GROUP FORM 2.pdf29 Oct 2025
Withdrawal Update Form 3File: AKSHAY GROUP FORM 3_compressed.pdf29 Oct 2025
Form 2A (FY 2024-2025)File: AKSHAY GROUP 2A.pdf6 Oct 2025
Form 5 (FY 2024-2025)File: AKSHAY GROUP FORM 5.pdf6 Oct 2025
Form 1File: FORM 1.pdf19 Jul 2025
Form 2File: FORM 2.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf19 Jul 2025
Form 3File: FORM 3_compressed.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Apr 2025
Layout approvalFile: Scan-03 (3 files merged).pdf8 Feb 2025
Building plan approvalFile: Scan-03 (3 files merged).pdf8 Feb 2025
Copy of Layout Approval (in case of layout)File: Scan-03 (3 files merged).pdf8 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf8 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Scan-03 (3 files merged).pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2_compressed.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOUSURE_compressed.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: SUS.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2.pdf22 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AKSHAY GROUP.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold AKSHAY GROUP.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Oct 2023
Details of encumbrances concerned to FinanceFile: Finance - Legal.pdf1 Apr 2023
Details of encumbrances concerned to LegalFile: Finance - Legal.pdf1 Apr 2023
Proforma of Agreement for saleFile: 2-ARTICLES OF AGREEMENT.pdf1 Apr 2023
Proforma of Allotment letterFile: Allotment.pdf1 Apr 2023
Deviation Report with respect to Allotment letterFile: Allotment Deviation Report.pdf1 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Agreement Deviation Report.pdf1 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf25 Mar 2023
Copy of the legal title reportFile: FORMAT A.pdf24 Mar 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT.pdf24 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: HASMUKH BAFNA.pdf24 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MAHAVIR BAFNA.pdf24 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PRAKASH OSWAL.pdf24 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ASHOK OSWAL.pdf24 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANSH SONNAYA.pdf24 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT.pdf24 Mar 2023
Layout approvalFile: Scan_1808-01_Compress.pdf9 Mar 2023
Building plan approvalFile: Scan_1808-02_Compress.pdf9 Mar 2023
Building plan approvalFile: Scan_1808-03_Compress.pdf9 Mar 2023
Building plan approvalFile: Scan_1808-04_Compress.pdf9 Mar 2023
PAN CardFile: PAN AKSHAY GROUP.PDF9 Mar 2023
Details of encumbrances concerned to FinanceFile: FINANCE LEGAL.pdf9 Mar 2023
Details of encumbrances concerned to LegalFile: FINANCE LEGAL.pdf9 Mar 2023
Copy of Layout Approval (in case of layout)File: Scan_1808-01_Compress.pdf9 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan_1808-02_Compress.pdf9 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan_1808-03_Compress.pdf9 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan_1808-04_Compress.pdf9 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Commence Cerficate_Compress.pdf9 Mar 2023
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf9 Mar 2023
CERSAI detailsFile: DECLARATION ABOUT CERSAI.pdf9 Mar 2023

How this compares with Pune

77%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AKSHAY SHRUSHTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SADASHIV PETH13,700+ in Pune

2 kmAKSHAY SHRUSHTICompleted 193Lapsed / revoked 123Other 201Dot size: filed unitsN

Filed coordinates, straight-line distance. 517 registered projects within 2 km.

Builder: AKSHAY GROUP

AKSHAY GROUP has 1 registration on MahaRERA, including AKSHAY SHRUSHTI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AKSHAY SHRUSHTI is delayed beyond 1 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKSHAY SHRUSHTI?

The registered promoter entity is AKSHAY GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKSHAY SHRUSHTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AKSHAY SHRUSHTI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKSHAY SHRUSHTI?

The professionals named in the filing: Architect: ABHAY JOSHI; Engineer: SUNIL MUTALIK; Engineer: Prassana Bhumkar; Engineer: Ashutosh Nighut; Chartered Accountant: YASHWANT KHADKIKAR; Chartered Accountant: Vimalchand Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKSHAY SHRUSHTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKSHAY SHRUSHTI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKSHAY SHRUSHTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.