Akshay Anantam
RG-MH-97482 · RERA P52100018878 · Last updated on MahaRERA portal: 20 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 4 cases
- 13 complaints at MahaRERA
- Completion date moved by 55 months
- 4 extensions taken
- Rs 200.00 crore secured on the land, in favour of Lokmangal Nagari Sahakari Patsanstha Maryadit
Clear
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Akshay Anantam is a Others project by Sneh Constructions in Pune, Maharashtra, registered with MahaRERA as P52100018878 on 10 Dec 2018. Possession is promised by 31 Mar 2028. The completion date has moved by 55 months from the original filing. 159 of the 194 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete. 13 complaints are on record with the regulator.
At a glance
Project
- NameAkshay Anantam
- TypeOthers
- Location
- Wakad Thergaon Road
- Near Datta Mandir
- Wakad
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100018878
- ReraGenie IDRG-MH-97482
Builder
- NameSneh Constructions
- Entity typePartnership
- PartnersBhausaheb Sopanrao Bhoir, Sudesh Kanhaiyalal Bhansali, Sanjay Kanhaiyalal Bhansali
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Dec 2018
- Promised completion31 Mar 2028
- Revised completionRevised to 31 Mar 2028 (originally 28 Aug 2023)
- Buildings2 building records
- Documents filed183 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 13 | 13 | 89 | 1 | 90 |
| Building B | NA | 13 | 13 | 104 | 0 | 104 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 99%.
Building A97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 99% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 99% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 99% |
Building B60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 69% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 40% |
| Water Supply | Yes | 99% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 15% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | Yes | 15% |
| Fire protection and fire safety requirements | Yes | 40% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed41
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building B | NA | Rs 17.44 cr | Rs 13.16 cr |
| Building A | NA | Rs 15.90 cr | Rs 15.75 cr |
| - | NA | Rs 5.29 cr | Rs 2.94 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vivek Garode |
| Architect | Vastushilp |
| Engineer | JW CONSULTANTS LLP |
| Engineer | Nitin Vijay Lale |
| Engineer | Sayyed Mansoor Civil Engineers and Architects |
| Chartered Accountant | CA Siddhant Abhay Bhora |
| Chartered Accountant | SPCM & Associates |
| Partner | Role in project |
|---|---|
| Sneh Constructions | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 54.68% allottees for purpose of extension of RERA registration period of the said project.
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 31-03-2026, to complete the project and fulfil all regulatory requirements.
Reason as filed by the promoterConstruction of Wing A has been completed in all respects and possession has been handed over to the allottees. Further, approximately 80% construction work of Wing B has also been completed and possession has been handed over for the completed units; however, approvals/sanctions for certain units are still pending before the competent authority. Due to the said procedural pendency, which is beyond the control of the Promoter, the Completion/Occupancy Certificate could not be obtained. Therefore humbly requests the Hon’ble Authority to grant an extension of registration up to 31/03/2028 for co
Litigation declared4
| Case | Court | Status |
|---|---|---|
| Spl C S No 517 2013/2013 | Civil Judge Senior Division | PENDING FOR HEARING |
| RTS Appeal no 230 2013/2013 | SDO Maval | Closed for order since two thousand nineteen |
| 10020 of 2019/2019 | High Court Bombay | NOT YET ADMITTED BY HIGH COURT PENDING FOR ADMISSION |
| 92/2018 | Civil Judge Senior Division | NOTICE RECEIVED FOR APPEARANCE ON TWENTY THIRD FEB TWENTYTHREE |
Complaints filed with MahaRERA13
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000310549 | Rajendra Hilal Patil | M/S Sneh Constructions | 04/03/2024 |
| CC005000000310551 | Gunjan Rajendra Patil | M/S Sneh Constructions | 04/03/2024 |
| CC005000000471450 | Vinayak Ananda Bharmal | Nitin Bhansali | 15/08/2024 |
| CC12503187 | POOJA CHANDRAKANT GURIKAR | Sneh Constructions | 09/09/2025 |
| CC12601280 | Amit Dilipkumar Kochar | Sneh Constructions | 09/03/2026 |
| CC12601434 | Vinayak Ananda Bharmal | Sneh Constructions | 14/03/2026 |
| CC12601419 | Shashikant Shrihari Karande | Sneh Constructions | 14/03/2026 |
| CC12601420 | Gyanesh Agarwal | Sneh Constructions | 14/03/2026 |
| CC12601421 | Abhijit Bhagawat Sinkar | Sneh Constructions | 14/03/2026 |
| CC12601583 | Farida Riyaj Jamadar | Sneh Constructions | 22/03/2026 |
| CC12603670 | Yogesh Dattatray Sorte | Sneh Constructions | 13/06/2026 |
| CC12604034 | Mandar Arvind Bonde | Sneh Constructions | 29/06/2026 |
| CC12604301 | Sagar Sanjay Malpure | Sneh Constructions | 09/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed183
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 183 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM_2A_FY_25-26.pdf | 20 May 2026 |
| Form 2A (FY 2024-2025)File: FORM_2A_FY_24-25.pdf | 20 May 2026 |
| Form 5 (FY 2024-2025)File: Form-5 March 2025.pdf | 20 May 2026 |
| Form 5 (FY 2021-2022)File: Form-5 March 2022.pdf | 20 May 2026 |
| Form 5 (FY 2024-2025)File: Form-5 March 2025.pdf | 20 May 2026 |
| Form 5 (FY 2022-2023)File: Form-5 March 2023.pdf | 20 May 2026 |
| Form 5 (FY 2023-2024)File: Form-5 March 2024 (2).pdf | 20 May 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: FORM 3 (2).pdf | 12 May 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: FORM 31-12-2025.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: FORM 31-12-2025.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: FORM 31-12-2025.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: FORM 31-12-2025.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: FORM 31-12-2025.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: FORM 2 31-12-2025.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: FORM 2 31-12-2025.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: FORM 2 31-12-2025.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: FORM 2 31-12-2025.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: FORM 2 31-12-2025.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: FORM 3 (2).pdf | 4 May 2026 |
| Withdrawal Update Form 3File: FORM 3 (2).pdf | 4 May 2026 |
| Withdrawal Update Form 3File: FORM 3 31-12-2025 Final.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: FORM 3 31-12-2025 Final.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: FORM 3 31-12-2025 Final.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: FORM 3 31-12-2025 Final.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: FORM 3 31-12-2025 Final.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: Form 1 -AA.pdf | 18 Sep 2025 |
| Withdrawal Update Form 2File: Form_02.pdf | 18 Sep 2025 |
| Withdrawal Update Form 3File: Form_03.pdf | 18 Sep 2025 |
| Form 1File: FORM1 310325.pdf | 25 Jul 2025 |
| Form 2File: ENGINEERS_CERTIFICATE-31-03-2025.pdf | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY 31032025.pdf | 25 Jul 2025 |
| Form 3File: FORM-3_310325_compressed.pdf | 25 Jul 2025 |
| Form 3File: FORM3 311224.pdf | 11 Jun 2025 |
| Form 2File: ENGINEERCERTIFICATE311224.pdf | 11 Jun 2025 |
| Form 1File: FORM1 311224.pdf | 11 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory update 311224.pdf | 11 Jun 2025 |
| Form 1File: FORM1 300924.pdf | 11 Jun 2025 |
| Form 2File: EngineerCERTIFICATE30092024.pdf | 11 Jun 2025 |
| Form 3File: FORM3 300924.pdf | 11 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory update 300924.pdf | 11 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 310324.pdf | 11 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 300624.pdf | 11 Oct 2024 |
| Certificates of CA (Form 3)File: Form-3 310324_11zon (1).pdf | 11 Oct 2024 |
| Certificates of CA (Form 3)File: Form-3300624_11zon.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Booked_Inventory.pdf | 11 Oct 2024 |
| Certificates of CA (Form 3)File: Form-3 310324_11zon (1).pdf | 11 Oct 2024 |
| Certificates of CA (Form 3)File: Form-3300624_11zon.pdf | 11 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 310324.pdf | 11 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 300624.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Booked_Inventory.pdf | 11 Oct 2024 |
| Declaration about Commencement CertificateFile: DECLARATION___COMMENCEMENT_CERTIFICATE.pdf | 13 Aug 2024 |
| Declaration in FORM BFile: Form B.pdf | 12 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Mar 24.pdf | 12 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun 24.pdf | 12 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf | 12 Aug 2024 |
| CERSAI detailsFile: CERSAI.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 12 Aug 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 12 Aug 2024 |
| Certificates of CA (Form 3)File: SIGNED FORM 3 DEC 23_compressed_compressed.pdf | 10 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SCANNED_FORM_5 fy 2022_23_compressed.pdf | 10 Aug 2024 |
| Layout approvalFile: 01of09 1mb.pdf | 10 Apr 2024 |
| Building plan approvalFile: 02of09 1mb.pdf | 10 Apr 2024 |
| Building plan approvalFile: 03of09 1mb.pdf | 10 Apr 2024 |
| Building plan approvalFile: 04of09 1mb.pdf | 10 Apr 2024 |
| Building plan approvalFile: 05of09 1mb.pdf | 10 Apr 2024 |
| Building plan approvalFile: 06of09 1mb.pdf | 10 Apr 2024 |
| Building plan approvalFile: 08of09 1mb.pdf | 10 Apr 2024 |
| Building plan approvalFile: 09of09 1mb.pdf | 10 Apr 2024 |
| Copy of the legal title reportFile: supp s and t 080424.pdf | 10 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: 01of09 1mb.pdf | 10 Apr 2024 |
| Building Plan Approval (IOD)File: 02of09 1mb.pdf | 10 Apr 2024 |
| Building Plan Approval (IOD)File: 03of09 1mb.pdf | 10 Apr 2024 |
| Building Plan Approval (IOD)File: 04of09 1mb.pdf | 10 Apr 2024 |
| Building Plan Approval (IOD)File: 05of09 1mb.pdf | 10 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 183 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Akshay Anantam on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near Datta Mandir13,700+ in Pune
Filed coordinates, straight-line distance. 262 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Sneh Constructions
Sneh Constructions has 1 registration on MahaRERA, including Akshay Anantam. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Akshay Anantam is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Akshay Anantam?
The registered promoter entity is Sneh Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Akshay Anantam?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Akshay Anantam?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Akshay Anantam?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Akshay Anantam?
The professionals named in the filing: Architect: Vivek Garode; Architect: Vastushilp; Engineer: JW CONSULTANTS LLP; Engineer: Nitin Vijay Lale; Engineer: Sayyed Mansoor Civil Engineers and Architects; Chartered Accountant: CA Siddhant Abhay Bhora. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Akshay Anantam?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback