Registered No litigation declared Others project

AKSHAR EVITA

By M/S.AKSHAR OM CONSTRUCTION

RG-MH-19756 · RERA P51700004758 · Last updated on MahaRERA portal: 4 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 65 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 65 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
5 of 76Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 186 documents Report an error

AKSHAR EVITA is a Others project by M/S.AKSHAR OM CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700004758 on 9 Aug 2017. Possession is promised by 15 Nov 2026. The completion date has moved by 65 months from the original filing. 71 of the 76 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameAKSHAR EVITA
  • TypeOthers
  • Location
    • DRONAGIRI
    • NAVI MUMBAI
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700004758
  • ReraGenie IDRG-MH-19756

Builder

  • NameM/S.AKSHAR OM CONSTRUCTION
  • Entity typePartnership
  • PartnersHARI BHACHUBHAI MUJAT, NITISH SINH OM GAHLOT, NARAYAN KARMAN ARETHIYA
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion15 Nov 2026
  • Revised completionRevised to 15 Nov 2026 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed186 files

Current status

93%71 of 76 units booked
100.0%Work done, per cost certificate

Figures as on 4 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AKSHAR EVITANA141269776

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

AKSHAR EVITA: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed51

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots51
Closed/Covered12
Open Space39

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,450 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jun 2026

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation
Permissible FSI2168.9
Proposed, not sanctioned2,169 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASHI NAVI MUMBAI
Estimated costRs 9.50 cr
Cost incurredRs 9.50 cr
Work done100.0%
BuildingWingEstimatedIncurred
AKSHAR EVITANARs 9.03 crRs 9.03 cr
-NARs 47.50 lakhRs 47.50 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSoyuz Talib
EngineerS K Consultants & Engineers
EngineerShailesh Bachubhai Arethiya
Chartered AccountantNB Sayed & Associates
Chartered AccountantPranav Bhaskaran & Associates
Chartered AccountantPratiksha Tulshyan & Associates
Chartered AccountantKrupa Uday Balia
PartnerRole in project
M/S.AKSHAR OM CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA22072621828Jun 2021 → Nov 2026

Reason as filed by the promoterwe, M/s. Akshar Om Construction, hereby declare the following with respect to the project Akshar Evita bearing registration number P51700004758 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, and we have received the Occupation Certificate (OC) on 06/10/2025 and we have also initiated the process for the possession as well. However, there is mismatch occurred in certain details on the MahaRERA profile as compared with the sanctioned plans, such as the sanctioned built-up area, total cou

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Nov 2026

Documents filed186

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 186 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: AOM Akshar Evita Form 2A FY 25-26.pdf4 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf4 Aug 2026
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf4 Aug 2026
Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf4 Aug 2026
Form 5 (FY 2021-2022)File: Form 5 2021-22.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 1File: Form 1 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 1File: Form 1 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 1File: Form 1 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 1File: Form 1 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 1File: Form 1 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 1File: Form 1 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3 Akshar Evita.pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3 Akshar Evita.pdf3 Aug 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Akshar Evita as on Dec 2024.pdf29 Jan 2025
Certificates of CA (Form 3)File: Form 3 Evita December 2024.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Akshar Evita Form 2A 31-03-2021.pdf9 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Akshar Evita Form 2A 31-03-2022.pdf9 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Akshar Evita Form 2A 31-03-2023.pdf9 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Akshar Evita Form 2A 31-03-2024.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular 29 Discloser of SoldUnsold Inventory -27-11-2024.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Akshar Evita -27-11-2024.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 2024.pdf29 Nov 2024
Certificates of CA (Form 3)File: FORM 3 30-09-2024.pdf29 Nov 2024
Certificates of CA (Form 5)File: Form 5 2017-2018.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30-09-2024.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-2019.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-2020.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-2021.pdf29 Nov 2024
Declaration about Commencement CertificateFile: Format D.pdf29 Nov 2024
CERSAI detailsFile: Declaration of CRESAI.pdf29 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-2022.pdf29 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-2023.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-2024.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Akshar Evita as on Sep 2024.pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Akshar Evita FY2023-24.pdf25 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Akshar Evita as on Sep 2024.pdf21 Nov 2024
Certificates of CA (Form 3)File: Form 3 Evita September 2024.pdf20 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Akshar Evita as on June 2024.pdf1 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Akshar Evita as on June 2024.pdf1 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Akshar Evita for FY 2022-23.pdf7 Jun 2024
Disclosure of sold/ booked inventoryFile: Akshar Evita Form -29 circular.pdf29 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Evita- Mar-2024.pdf25 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Evita- Mar-2024.pdf25 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Akshar Evita as on March 2024.pdf20 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita March 2024.pdf20 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita as on December 2017.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita June 2018.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita September 2018.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita December 2018.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita June 2019.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita December 2021.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita March 2022.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita June 2022.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita September 2022.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita December 2022.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita March 2023.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita June 2023.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita September 2023.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3 Evita December 2023.pdf18 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Akshar Evita as on Dec 2022.pdf16 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Akshar Evita as on March 2024.pdf15 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2017 September.pdf2 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2017 December.pdf2 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2018 June.pdf2 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2018 September.pdf2 Apr 2024

How this compares with Thane

93%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 65 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AKSHAR EVITA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVI MUMBAI7,600+ in Thane

2 kmAKSHAR EVITACompleted 2Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: M/S.AKSHAR OM CONSTRUCTION

M/S.AKSHAR OM CONSTRUCTION has 2 registrations on MahaRERA, including AKSHAR EVITA and AKSHAR EVANNA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AKSHAR EVITA is delayed beyond 15 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKSHAR EVITA?

The registered promoter entity is M/S.AKSHAR OM CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKSHAR EVITA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AKSHAR EVITA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKSHAR EVITA?

The professionals named in the filing: Architect: Soyuz Talib; Engineer: S K Consultants & Engineers; Engineer: Shailesh Bachubhai Arethiya; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates; Chartered Accountant: Pratiksha Tulshyan & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKSHAR EVITA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKSHAR EVITA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKSHAR EVITA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.