AKSHAR ALTORIOS 2.O

By Akshar Skywards Construction

RG-MH-35359 · RERA P52100054382 · Last updated on MahaRERA portal: 6 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 98%
63 of 120Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

AKSHAR ALTORIOS 2.O is a Others project by Akshar Skywards Construction in Pune, Maharashtra, registered with MahaRERA as P52100054382 on 18 Jan 2024. Possession is promised by 31 Dec 2027. 57 of the 120 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameAKSHAR ALTORIOS 2.O
  • TypeOthers
  • Location
    • Sadesatara Nali
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054382
  • ReraGenie IDRG-MH-35359

Builder

  • NameAkshar Skywards Construction
  • Entity typePartnership
  • PartnersBachubhai Dharamshi Arethiya, Kishore Bhachubhai Mujat, Himanshu Ishwarlal Thakkar, Kanji Dharamshi Arethiya, Khimji Dharamshi Arethiya, Rahul Vilas Nahata, Rohan Vijay Nahata

Key dates

this monthRegisteredJan 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jan 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed97 files

Current status

48%57 of 120 units booked
58.9%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing DNA171575075
Wing ENA11945045

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 98%.

Wing D63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Wing E38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed239

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots239
Closed/Covered239
BuildingClosed/CoveredTotal
Wing D136136
Wing E103103

Land and ownership26

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,550 sq m
Land owned byNot the promoter
Named landowners26
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025
LandownerVillageDistrict
Mr. Vasantrao Baburao TupeNavi Mumbai (M Corp.)Thane
Mrs. Latika Vasantrao TupeNavi Mumbai (M Corp.)Thane
Mr. Ravindra Vasantrao TupeNavi Mumbai (M Corp.)Thane
Mrs. Archana Ravindra TupeNavi Mumbai (M Corp.)Thane
Mr. Mahendra Vasantrao TupeNavi Mumbai (M Corp.)Thane
Mrs. Jyoti Mahendra TupeNavi Mumbai (M Corp.)Thane
Mr. Prashant Vasantrao TupeNavi Mumbai (M Corp.)Thane
Mrs. Vaishali Prashant TupeNavi Mumbai (M Corp.)Thane
Mr. Sumantrao Baburao TupeNavi Mumbai (M Corp.)Thane
Mrs. Dhawrka Sumantrao TupeNavi Mumbai (M Corp.)Thane
Mr. Santosh Sumantrao TupeNavi Mumbai (M Corp.)Thane
Mrs. Monika Santosh TupeNavi Mumbai (M Corp.)Thane
Mr. Anil Sumantrao TupeNavi Mumbai (M Corp.)Thane
Mr. Ashokrao Baburao TupeNavi Mumbai (M Corp.)Thane
Mrs. Laxmi Ashokrao TupeNavi Mumbai (M Corp.)Thane
Mr. Dyneshwar Ashokrao TupeNavi Mumbai (M Corp.)Thane
Mr. Sunil Ashokrao TupeNavi Mumbai (M Corp.)Thane
Smt. Madhubala Shubhashrao GhuleNavi Mumbai (M Corp.)Thane
Mr. Rahul Shubhashrao GhuleNavi Mumbai (M Corp.)Thane
Mr. Sudarshan Shubhashrao GhuleNavi Mumbai (M Corp.)Thane
Mrs. Anuradha Narendra BarateNavi Mumbai (M Corp.)Thane
Mr. Sanjay Tukaram TupeNavi Mumbai (M Corp.)Thane
Mrs. Sangeeta Sanjay TupeNavi Mumbai (M Corp.)Thane
Mr. Tushar Sanjay TupeNavi Mumbai (M Corp.)Thane
Mr. Rakesh Sanjay TupeNavi Mumbai (M Corp.)Thane
Ms. Sonali Sanjay TupeNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI13843.68
Proposed, not sanctioned13,844 sq m
Buildings approved3
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCoral Crest, Plot No 3, Sector 23, Near Nerul Station, Navi Mumbai, Maharashtra - 400706
Estimated costRs 44.85 cr
Cost incurredRs 26.40 cr
Work done58.86%
BuildingWingEstimatedIncurred
Wing DNARs 26.50 crRs 17.60 cr
Wing ENARs 13.25 crRs 8.80 cr
-NARs 5.10 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtit Atit Admulwar
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantPranav Bhaskaran & Associates
PartnerRole in project
Akshar Skywards Construction-

Litigation declared4

CaseCourtStatus
1877/2022District and Session Court PuneWritten Statement and Say
1173/2022District and Session Court PunePublic Notice Proclamation
1877/2022District and Session Court PuneOngoing
1173/2022District and Session Court PuneClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5_Akshar Altorios_for FY 2024-25.pdf6 Jun 2026
Withdrawal Update Form 1File: Form -1 Akshar Altorios As on Mar 2026.pdf15 May 2026
Withdrawal Update Form 2File: Form - 2 Akshar Altorios As on Mar 2026.pdf15 May 2026
Withdrawal Update Form 3File: Form -3 Akshar Altorios As on Mar 2026.pdf15 May 2026
Layout approvalFile: Layout (10-11-2025).pdf16 Feb 2026
Building plan approvalFile: 2 (10-11-2025).pdf16 Feb 2026
Layout approvalFile: 3 (10-11-2025).pdf16 Feb 2026
Building plan approvalFile: 4 (10-11-2025).pdf16 Feb 2026
Building plan approvalFile: 5 - 6 (10-11-2025).pdf16 Feb 2026
Withdrawal Update Form 1File: Form 1 - signed Akshar Altorios.pdf16 Feb 2026
Withdrawal Update Form 2File: Form 2 - Signed Akshar Altorios.pdf16 Feb 2026
Withdrawal Update Form 3File: Form 3 - Signed Akshar Altorios.pdf16 Feb 2026
Withdrawal Update Form 1File: Form 1 - Akshar Altorios as on Dec 2025.pdf2 Feb 2026
Withdrawal Update Form 2File: Form 2 - Akshar Altorios as on Dec 2025.pdf2 Feb 2026
Withdrawal Update Form 3File: Form 3 - Akshar Altorios as on Dec 2025.pdf2 Feb 2026
Layout approvalFile: Layout.pdf9 Jan 2026
Building plan approvalFile: Layout.pdf9 Jan 2026
Building plan approvalFile: 2.pdf9 Jan 2026
Building plan approvalFile: 3.pdf9 Jan 2026
Building plan approvalFile: 4.pdf9 Jan 2026
Building plan approvalFile: 5 - 6.pdf9 Jan 2026
Withdrawal Update Form 1File: Form 1 - Akshar Altorios as on Sep 2025.pdf21 Nov 2025
Withdrawal Update Form 2File: Form 2 - Akshar Altorios as on Sept 2025.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 - Akshar Altorios as on Sept 2025.pdf21 Nov 2025
Withdrawal Update Form 1File: Form 1 - Akshar Altorios as on June 2025.pdf8 Sep 2025
Withdrawal Update Form 2File: Form 2 - Akshar Altorios as on June 2025.pdf8 Sep 2025
Withdrawal Update Form 3File: Form 3 - Akshar Altorios as on June 2025.pdf8 Sep 2025
Form 1File: Form 1 - Akshar Altorios as on March 2025.pdf4 Jul 2025
Form 2File: Form 2 - Akshar Altorios as on March 2025.pdf4 Jul 2025
Form 3File: Form 3 Akshar Altorios 31st March 2025.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Altorios 2 Migration March 25.pdf4 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Akshar Altorios as on March 2025.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Akshar Altorios 31st March 2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Akshar Altorios as on March 2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Akshar Altorios as on Dec 2024.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Akshar Altorios 2,O as on December 2024.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Akshar Altorios 31st December 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Akshar Altorios as on March 2024.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Akshar Altorios as on June 2024.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Akshar Altorios as on Sep 2024.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Akshar Altorios 2-0 - 30-09-2024.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Akshar Altorios as on Sep 2024.pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Akshar Altorios 23-24.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Akshar Altorios 30th September 2024.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Akshar Altorios as on 30th June 2024.pdf5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Akshar Altorios 30th June 2024.pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Akshar Altorios As on March 2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: qqqqqqqqq.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Akshar Altorios as on 31st March 2024.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Blank.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf15 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: WhatsApp Image 2024-01-11 at 215035.pdf11 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 2 Commencement Certificates _ NA Order for plotted development (3).pdf11 Jan 2024
Declaration about Commencement CertificateFile: form d 11-Jan-2024 19-36-54(1).pdf11 Jan 2024
Other - LegalFile: PARTNERSHIP DEED - AKSHAR SKYWARDS CONSTRUCTIONS.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 after Scrutiny- Akshar.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 - archtect certificate dated.pdf18 Dec 2023
Proforma of Allotment letterFile: Allotment Letter_Akshar Altorios 2_13122023.pdf18 Dec 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE Akshar.pdf18 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf18 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement for Sale_11zon.pdf18 Dec 2023
Other - TechnicalFile: CC Verification mail from Pune Municipal Corporation.pdf15 Dec 2023
Other - LegalFile: SALE DEED KHEDEKAR FAMILY-rotated-part-1.pdf14 Dec 2023
Other - LegalFile: SALE DEED KHEDEKAR FAMILY-rotated-part-2-compressed.pdf14 Dec 2023
Other - LegalFile: Final SALE DEED DEOKAR FAMILY-rotated_removed-1-55.pdf14 Dec 2023
Other - LegalFile: Final SALE DEED DEOKAR FAMILY-rotated_removed-56-113-compressed.pdf14 Dec 2023
Other - FinanceFile: ilovepdf_merged (40).pdf14 Dec 2023
Other - TechnicalFile: ilovepdf_merged (40).pdf14 Dec 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (15).pdf13 Dec 2023
Building plan approvalFile: scan 2031.pdf13 Dec 2023
Building plan approvalFile: scan 2032.pdf13 Dec 2023
Building plan approvalFile: scan 2033.pdf13 Dec 2023
Building plan approvalFile: scan 2034.pdf13 Dec 2023
Building plan approvalFile: scan 2035.pdf13 Dec 2023
Building plan approvalFile: scan 2036.pdf13 Dec 2023
Copy of the legal title reportFile: 20231218173111.pdf13 Dec 2023

How this compares with Pune

48%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AKSHAR ALTORIOS 2.O on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hadapsar13,700+ in Pune

2 kmAKSHAR ALTORIOS 2.OCompleted 73Lapsed / revoked 21Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 176 registered projects within 2 km.

Builder: Akshar Skywards Construction

Akshar Skywards Construction has 1 registration on MahaRERA, including AKSHAR ALTORIOS 2.O. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AKSHAR ALTORIOS 2.O is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKSHAR ALTORIOS 2.O?

The registered promoter entity is Akshar Skywards Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKSHAR ALTORIOS 2.O?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AKSHAR ALTORIOS 2.O?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKSHAR ALTORIOS 2.O?

The professionals named in the filing: Architect: Atit Atit Admulwar; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKSHAR ALTORIOS 2.O?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKSHAR ALTORIOS 2.O. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKSHAR ALTORIOS 2.O to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.