Home / Browse projects / Pune, Maharashtra / AKASHDEEP APARTMENT

Registered No litigation declared Residential / Group Housing project

AKASHDEEP APARTMENT

By GRUHSHILP CONSTRUCTION

RG-MH-18749 · RERA P52100077558 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
2Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

AKASHDEEP APARTMENT is a Residential / Group Housing project by GRUHSHILP CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100077558 on 10 Oct 2024. Possession is promised by 30 Jun 2027. 2 complaints are on record with the regulator.

At a glance

Project

  • NameAKASHDEEP APARTMENT
  • TypeResidential / Group Housing
  • Location
    • TULSHIBAGWALE COLONY
    • Parvati
    • Haveli
    • Pune
    • 411009
  • Pincode411009
  • RERA no.P52100077558
  • ReraGenie IDRG-MH-18749

Builder

  • NameGRUHSHILP CONSTRUCTION
  • Entity typePartnership
  • GSTIN27ABAFG7964J1ZY
  • PartnersMr Amol Arun Choudhari, Mrs Shefali Amol Choudhary

Key dates

this monthRegisteredOct 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2024
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed113 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AKASHDEEP APARTMENTNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

AKASHDEEP APARTMENT: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area455 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
DATTATRAY SAHEBRAO DHUMALPune (M Corp.)Pune
ABHIJIT HEMANT NAWAREPune (M Corp.)Pune
PRAKASH BALKRUSHNA DAPHALAPULKARPune (M Corp.)Pune
MUKUND NAGORAO JAGIRDARPune (M Corp.)Pune
UDDHAV KRUSHNARAO TULSHIBAUGWALEPune (M Corp.)Pune
RAMDAS KRUSHNARAO TULSHIBAUGWALEPune (M Corp.)Pune
DEEPAK PANDURANG DEODHARPune (M Corp.)Pune
SURYAKANT MOHANLAL RATHIPune (M Corp.)Pune
RAVINDRA PANDURANG DEODHARPune (M Corp.)Pune

Approvals and building plan

Permissible FSI1363.12
Proposed, not sanctioned695 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDECCAN, GYMKHANA, PUNE,MAHARASHTRA 411004

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANGESH GOTAL
EngineerSADASHIV LOHKARE
EngineerSandip Baban Shelar
Chartered AccountantSUPRIYA ABHIJIT MUNDADA
Chartered AccountantAjinkya Doshi
PartnerRole in project
GRUHSHILP CONSTRUCTION-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
SM12600006Ram GawaliGRUHSHILP CONSTRUCTION06/01/2026
SM12600008Ram GawaliGRUHSHILP CONSTRUCTION06/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1- Architect Certificate- GC Upto 31st March 2026.pdf9 May 2026
Form 2File: Form 2 RERA Engineer Certificate GC Upto 31st March 2026.pdf9 May 2026
Form 3File: Form 3 RERA CA- Akashdeep Project- Upto 31st March 2026.pdf9 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 31st March 2026.pdf9 May 2026
Form 1File: Form 1 Architect Certificate GC Upto 31st Dec 2024.pdf3 Apr 2026
Form 2File: Form 2 RERA Engineer Certificate GC Upto 31st Dec 2024.pdf3 Apr 2026
Form 3File: Form 3 RERA CA- Akashdeep Project Upto 31st Dec 2024.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 31st Dec 2024.pdf3 Apr 2026
Form 1File: Form 1 Architect Certificate GC Upto 31st March 2025.pdf3 Apr 2026
Form 2File: Form 2 RERA Engineer Certificate GC Upto 31st March 2025.pdf3 Apr 2026
Form 3File: Form 3 RERA CA- Akashdeep Project Upto 31st March 2025.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 31st March 2025.pdf3 Apr 2026
Form 1File: Form 1- Architect Certificate- GC Upto 30th June 2025.pdf3 Apr 2026
Form 2File: Form 2 RERA Engineer Certificate GC Upto 30th June 2025.pdf3 Apr 2026
Form 3File: Form 3 RERA CA- Akashdeep Project Upto 30th June 2025.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 30th June 2025.pdf3 Apr 2026
Form 1File: Form 1- Architect Certificate- GC Upto 30th Sep 2025.pdf3 Apr 2026
Form 2File: Form 2 RERA Engineer Certificate GC Upto 30th Sep 2025.pdf3 Apr 2026
Form 3File: Form 3 RERA CA- Akashdeep Project Upto 30th Sep 2025.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 30th Sep 2025.pdf3 Apr 2026
Form 1File: Form 1- Architect Certificate- GC Upto 31st Dec 2025.pdf3 Apr 2026
Form 2File: Form 2 RERA Engineer Certificate GC Upto 31st Dec 2025.pdf3 Apr 2026
Form 3File: Form 3 RERA CA- Akashdeep Project Upto 31st Dec 2025.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 31st Dec 2025.pdf3 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A- GC- Akashdeep- FY 24-25.pdf14 Mar 2026
Form 5 (FY 2024-2025)File: Form 5- Annual Report- GC- Akashdeep- FY 24-25.pdf21 Feb 2026
Other - LegalFile: Property Card.pdf13 Aug 2024
Other - LegalFile: Deed of Decalaration .pdf13 Aug 2024
Other - LegalFile: 2024.pdf13 Aug 2024
Other - TechnicalFile: 2024.pdf13 Aug 2024
Other - LegalFile: Property Card.pdf13 Aug 2024
Other - LegalFile: Deed of Decalaration .pdf13 Aug 2024
Other - LegalFile: 2024.pdf13 Aug 2024
Other - TechnicalFile: 2024.pdf13 Aug 2024
Other - LegalFile: Property Card.pdf13 Aug 2024
Other - LegalFile: Deed of Decalaration .pdf13 Aug 2024
Other - LegalFile: 2024.pdf13 Aug 2024
Other - TechnicalFile: 2024.pdf13 Aug 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.pdf3 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf3 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrance - Finance.pdf3 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf3 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.pdf3 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf3 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrance - Finance.pdf3 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf3 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.pdf3 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf3 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrance - Finance.pdf3 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf3 Jul 2024
Copy of the legal title reportFile: ilovepdf_merged (11)_compressed.pdf23 May 2024
Declaration in FORM BFile: Form B Akashdeep.pdf23 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement 21052024.pdf23 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure a Amol 23052024.pdf23 May 2024
Copy of the legal title reportFile: ilovepdf_merged (11)_compressed.pdf23 May 2024
Declaration in FORM BFile: Form B Akashdeep.pdf23 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement 21052024.pdf23 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure a Amol 23052024.pdf23 May 2024
Copy of the legal title reportFile: ilovepdf_merged (11)_compressed.pdf23 May 2024
Declaration in FORM BFile: Form B Akashdeep.pdf23 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement 21052024.pdf23 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure a Amol 23052024.pdf23 May 2024
Proforma of Agreement for saleFile: AFS.pdf21 May 2024
Proforma of Agreement for saleFile: AFS.pdf21 May 2024
Proforma of Agreement for saleFile: AFS.pdf21 May 2024
Building plan approvalFile: SANCTION DWG_11zon (1).pdf19 May 2024
Layout approvalFile: SANCTION DWG_11zon (1).pdf19 May 2024
Building plan approvalFile: SANCTION DWG_11zon (1).pdf19 May 2024
Layout approvalFile: SANCTION DWG_11zon (1).pdf19 May 2024
Building plan approvalFile: SANCTION DWG_11zon (1).pdf19 May 2024
Layout approvalFile: SANCTION DWG_11zon (1).pdf19 May 2024
PAN CardFile: GC_PAN Card_Partnership Firm.pdf19 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrance certificate finance.pdf19 May 2024
Copy of Layout Approval (in case of layout)File: SANCTION DWG_11zon (1).pdf19 May 2024
Proforma of Allotment letterFile: Allotment letter Akashdeep n.pdf19 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM 1.pdf19 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 May 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf19 May 2024
Building Plan Approval / NA Order for plotted developmentFile: SANCTION DWG_11zon (1).pdf19 May 2024
Other - LegalFile: Legal Encumbrance certificate.pdf19 May 2024

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AKASHDEEP APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TULSHIBAGWALE COLONY13,700+ in Pune

Builder: GRUHSHILP CONSTRUCTION

GRUHSHILP CONSTRUCTION has 1 registration on MahaRERA, including AKASHDEEP APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AKASHDEEP APARTMENT is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKASHDEEP APARTMENT?

The registered promoter entity is GRUHSHILP CONSTRUCTION, a partnership as per the filing. Its GSTIN 27ABAFG7964J1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKASHDEEP APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AKASHDEEP APARTMENT?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AKASHDEEP APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKASHDEEP APARTMENT?

The professionals named in the filing: Architect: MANGESH GOTAL; Engineer: SADASHIV LOHKARE; Engineer: Sandip Baban Shelar; Chartered Accountant: SUPRIYA ABHIJIT MUNDADA; Chartered Accountant: Ajinkya Doshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKASHDEEP APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKASHDEEP APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKASHDEEP APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.