AKASH EMPIRE
By DEEP CONSTRUCTION BUILDERS & DEVELOPERS
RG-MH-19137 · RERA P51600078187 · Last updated on MahaRERA portal: 27 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AKASH EMPIRE is a Others project by DEEP CONSTRUCTION BUILDERS & DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600078187 on 29 Nov 2024. Possession is promised by 31 Dec 2031. 12 of the 124 units on this registration are recorded sold or booked, and 3 of 44 construction stages are filed complete.
At a glance
Project
- NameAKASH EMPIRE
- TypeOthers
- Location
- RAJIV NAGAR
- MUMBAI NAKA
- Nashik
- 422009
- Pincode422009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600078187
- ReraGenie IDRG-MH-19137
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Nov 2024
- Promised completion31 Dec 2031
- Revised completionNone
- Buildings4 building records
- Documents filed47 files
Current status
Figures as on 27 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AKASH EMPIRE WING D | NA | 0 | 0 | 0 | 8 | 8 |
| AKASH EMPIRE WING C | NA | 1 | 1 | 4 | 0 | 4 |
| AKASH EMPIRE WING B | NA | 14 | 14 | 56 | 0 | 56 |
| AKASH EMPIRE WING A | NA | 14 | 14 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.
AKASH EMPIRE WING D9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
AKASH EMPIRE WING C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
AKASH EMPIRE WING B9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
AKASH EMPIRE WING A9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed199
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| AKASH EMPIRE WING D | 16 | 0 | 16 |
| AKASH EMPIRE WING C | 7 | 2 | 9 |
| AKASH EMPIRE WING B | 85 | 2 | 87 |
| AKASH EMPIRE WING A | 85 | 2 | 87 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| AKASH EMPIRE WING B | NA | Rs 11.50 cr | Rs 5.95 cr |
| AKASH EMPIRE WING A | NA | Rs 11.50 cr | Rs 5.95 cr |
| AKASH EMPIRE WING C | NA | Rs 88.94 lakh | - |
| AKASH EMPIRE WING D | NA | Rs 49.41 lakh | Rs 47.51 lakh |
| - | NA | Rs 32.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | UMESH BAGUL |
| Engineer | Suyog Bhore |
| Engineer | Harshal C Dhande |
| Chartered Accountant | CA Pratik Jain |
| Chartered Accountant | LRB & Associates |
| Partner | Role in project |
|---|---|
| DEEP CONSTRUCTION BUILDERS & DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2031
Documents filed47
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5_31032025.pdf | 27 Jun 2026 |
| Form 5 (FY 2025-2026)File: Form 5_31032026.pdf | 27 Jun 2026 |
| Commencement Certificates / NA Order for plotted developmentFile: REA51600165078.pdf | 21 Nov 2024 |
| Proforma of Agreement for saleFile: Agrrement To Sale New_171124.pdf | 21 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B BANK LETTER HEAD_171124.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Akash Empire_24102024.pdf | 26 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sanyogita Disclosure Interest.pdf | 25 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Bhushan Akarte Disclosure of interest.pdf | 25 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: NE_Finance.pdf | 24 Oct 2024 |
| Proforma of Allotment letterFile: Allotment Letter_241024.pdf | 24 Oct 2024 |
| Declaration about Commencement CertificateFile: Form D_241024.pdf | 24 Oct 2024 |
| Details of encumbrances concerned to LegalFile: NE_Finance.pdf | 24 Oct 2024 |
| Other - TechnicalFile: REA51600165078.pdf | 24 Oct 2024 |
| Building plan approvalFile: Sanction Plan 5.pdf | 11 Oct 2024 |
| Building plan approvalFile: Sanction Plan 4.pdf | 11 Oct 2024 |
| Building plan approvalFile: Sanction Plan 3.pdf | 11 Oct 2024 |
| Building plan approvalFile: Sanction Plan 2.pdf | 11 Oct 2024 |
| Building plan approvalFile: Sanction Plan 1.pdf | 11 Oct 2024 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 11 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: NE_Legal.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 11 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 1.pdf | 11 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2.pdf | 11 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 3.pdf | 11 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 4.pdf | 11 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 5.pdf | 11 Oct 2024 |
| Other - LegalFile: 1D_1.pdf | 11 Oct 2024 |
| Other - LegalFile: 1D_2.pdf | 11 Oct 2024 |
| Other - LegalFile: 1C_1.pdf | 11 Oct 2024 |
| Other - LegalFile: 1C_2.pdf | 11 Oct 2024 |
| CERSAI detailsFile: CERSAI_Final.pdf | 11 Oct 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Seperate Account.pdf | 11 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: No Deviation_AL.pdf | 11 Oct 2024 |
| Details of encumbrances concerned to LegalFile: NE_Legal.pdf | 11 Oct 2024 |
| Other - TechnicalFile: ANNEXURE A.pdf | 11 Oct 2024 |
| Other - TechnicalFile: Plot Subdivision.pdf | 11 Oct 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation_AFS.pdf | 11 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 11 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disc of Secured Unsecured Finance.pdf | 11 Oct 2024 |
| Building plan approvalFile: NA ORDER_compressed.pdf | 9 Oct 2024 |
| Layout approvalFile: LAY OUT 1.pdf | 9 Oct 2024 |
| PAN CardFile: PAN Card.pdf | 9 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: LAY OUT 1.pdf | 9 Oct 2024 |
| Declaration in FORM BFile: FORM B ON 100 STAMP PAPER_compressed.pdf | 9 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf | 9 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: NA ORDER_compressed.pdf | 9 Oct 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| AKASH LIFESTYLEP51600030758 | UNTWADI, Nashik | 48 | Sep 2021 | Completed | Dec 2025 | Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 47 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AKASH EMPIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MUMBAI NAKA4,100+ in Nashik
Filed coordinates, straight-line distance. 199 registered projects within 2 km.
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: DEEP CONSTRUCTION BUILDERS & DEVELOPERS
DEEP CONSTRUCTION BUILDERS & DEVELOPERS has 2 registrations on MahaRERA, including AKASH LIFESTYLE and AKASH EMPIRE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if AKASH EMPIRE is delayed beyond 31 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AKASH EMPIRE?
The registered promoter entity is DEEP CONSTRUCTION BUILDERS & DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAHFD0273B1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AKASH EMPIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AKASH EMPIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AKASH EMPIRE?
The professionals named in the filing: Architect: UMESH BAGUL; Engineer: Suyog Bhore; Engineer: Harshal C Dhande; Chartered Accountant: CA Pratik Jain; Chartered Accountant: LRB & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AKASH EMPIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback