Home / Browse projects / Ratnagiri, Maharashtra / AKAR SHERE PLAZA

Registered No litigation declared Others project

AKAR SHERE PLAZA

By AKAR INFRASTRUCTURE

RG-MH-07181 · RERA P52800076898 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Nov 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 90%
14 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

AKAR SHERE PLAZA is a Others project by AKAR INFRASTRUCTURE in Ratnagiri, Maharashtra, registered with MahaRERA as P52800076898 on 9 Jul 2024. Possession is promised by 30 Nov 2028. 7 of the 21 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameAKAR SHERE PLAZA
  • TypeOthers
  • Location
    • SUBHASH ROAD
    • JOSHI PALAND NAKA
    • Zadgaon CT
    • Ratnagiri
    • 415612
  • Pincode415612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800076898
  • ReraGenie IDRG-MH-07181

Builder

  • NameAKAR INFRASTRUCTURE
  • Entity typePartnership
  • GSTIN27ABHFA3858L1Z0
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersNITYANAND RAVINDRA BHUTE, VIRENDRA VISHNU VANAJU
  • Other registrations6 more →
  • Completed4 of 7
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2024PromisedNov 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Jul 2024
  • Promised completion30 Nov 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

33%7 of 21 units booked
61.4%Work done, per cost certificate

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AKAR SHERE PLAZANA7718321

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

AKAR SHERE PLAZA: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26

Land and ownership17

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area512 sq m
Land owned byThe promoter, with other names on the file
Named landowners17
Declared on25 Sep 2024
LandownerVillageDistrict
MANASI PRABHAKAR NIMKARNachane (CT)Ratnagiri
SURAJ SHANKAR SHEREZadgaon CTRatnagiri
PRITAM SHANKAR SHEREZadgaon CTRatnagiri
DIVYA DEEPAK SHEREKurlaMumbai Suburban
TRUPTI RAMESH REDIJVasai-Virar City (M Corp)Palghar
ALANKAR DINANATH BERDEMumbai CityMumbai City
DEEPAK SHRIKRUSHNA SHEREZadgaon CTRatnagiri
CHANDAN VILAS SHEREZadgaon CTRatnagiri
MADHURA MILIND KAJARIKurlaMumbai Suburban
VEDANGI VIJAY SANSAREZadgaon CTRatnagiri
SHEETAL VILAS SHEREZadgaon CTRatnagiri
SANATAN VILAS SHEREZadgaon CTRatnagiri
NEHA SUNIL BELWALKARZadgaon CTRatnagiri
SANSKRUTI SHARAD PILAWANKARMumbai CityMumbai City
PRARUTI KETAN KALUSHTEMumbai CityMumbai City
SMRUTI SANJAY PAWARMumbai CityMumbai City
RIDDHI NANDKUMAR TODKARIMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMUNCIPAL COUNCIL RATNAGIRI
Permissible FSI1231.75
Proposed, not sanctioned1,232 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHAREGHAT ROAD,RATNAGIRI 415612
Estimated costRs 3.23 cr
Cost incurredRs 1.98 cr
Work done61.4%
BuildingWingEstimatedIncurred
AKAR SHERE PLAZANARs 2.99 crRs 1.98 cr
-NARs 23.60 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Milind Yadav
ArchitectMILIND YADAV
EngineerMr Manoj Joshi
EngineerROHIT CHANDRAKANT BHARANKAR
Chartered AccountantMr Satyaroop Despande
Chartered AccountantMASH & ASSOCIATES
PartnerRole in project
AKAR INFRASTRUCTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2028

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2026-2027)File: 26-27_11zon.pdf1 Jun 2026
Withdrawal Update Form 1File: FORM 1 MARCH26.pdf18 Apr 2026
Withdrawal Update Form 2File: FORM 2 MARCH 26.pdf18 Apr 2026
Withdrawal Update Form 3File: akar shere plaza-5.pdf18 Apr 2026
Withdrawal Update Form 1File: form 1 shere dec 25.pdf17 Jan 2026
Withdrawal Update Form 2File: shere plaza form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: Akar Shere Plaza form 3.pdf17 Jan 2026
Form 5 (FY 2024-2025)File: shere plaza (2).pdf24 Dec 2025
Withdrawal Update Form 1File: form 1 sept 25.pdf15 Oct 2025
Withdrawal Update Form 2File: form 2 sept25.pdf15 Oct 2025
Withdrawal Update Form 3File: form 3 sept25.pdf15 Oct 2025
Withdrawal Update Form 1File: FORM - 1 SHERE.pdf11 Jul 2025
Withdrawal Update Form 2File: FORM 2.pdf11 Jul 2025
Withdrawal Update Form 3File: FORM 3.pdf11 Jul 2025
Form 2A (FY 2024-2025)File: 24-25.pdf19 Jun 2025
Form 2A (FY 2025-2026)File: 25-26.pdf19 Jun 2025
Form 1File: architect certificate .pdf23 May 2025
Form 2File: Engineer certificate.pdf23 May 2025
Form 3File: C A.pdf23 May 2025
Form 1File: Form 1 -Dec 24.pdf23 May 2025
Form 2File: From -2 Dec- 24.pdf23 May 2025
Form 3File: FORM -3 DEC 24.pdf23 May 2025
Form 1File: FORM-1 MARCH 25.pdf23 May 2025
Form 2File: FORM -2 MARCH 25.pdf23 May 2025
Form 3File: FORM 3 -MARCH 25.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Dec 24.pdf17 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 MARCH 25.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 DEC 24.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 March 2025 AKAR SHERE PLAZA_compressed (1).pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From -2 Dec- 24.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 MARCH 25.pdf17 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate .pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf25 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A bank ac.pdf10 Jul 2024
Details of encumbrances concerned to FinanceFile: POA.pdf22 Jun 2024
Details of encumbrances concerned to FinanceFile: TRUPTI SHERE POA.pdf22 Jun 2024
Details of encumbrances concerned to LegalFile: POA.pdf22 Jun 2024
Details of encumbrances concerned to LegalFile: TRUPTI SHERE POA.pdf22 Jun 2024
Declaration about Commencement CertificateFile: Gmail - Verification of CC.pdf5 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Vanaju.pdf5 Apr 2024
Foreclosure of the ProjectFile: Gmail - Verification of CC.pdf5 Apr 2024
Other - FinanceFile: FINANCE ENCUMBRANCES.pdf29 Mar 2024
CERSAI detailsFile: Cersai Declaration.pdf27 Mar 2024
Other - TechnicalFile: ANNEXURE A.pdf27 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf19 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf16 Mar 2024
Proforma of Agreement for saleFile: rera flat afs.pdf15 Mar 2024
Copy of the legal title reportFile: SEARCH REPORT.pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CERTIFICATE.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf12 Mar 2024
Declaration about Commencement CertificateFile: FORMAT D.pdf7 Mar 2024
Layout approvalFile: BUILDING PLAN.pdf5 Mar 2024
Building plan approvalFile: BUILDING PLAN.pdf5 Mar 2024
Copy of Layout Approval (in case of layout)File: BUILDING PLAN.pdf5 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf5 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf5 Mar 2024
Proforma of Allotment letterFile: Allotment letter.pdf5 Mar 2024
Details of encumbrances concerned to FinanceFile: FINANCE ENCUMBRANCES.pdf20 Feb 2024
Details of encumbrances concerned to FinanceFile: finance.pdf20 Feb 2024
Details of encumbrances concerned to LegalFile: FINANCE ENCUMBRANCES.pdf20 Feb 2024
Details of encumbrances concerned to LegalFile: finance.pdf20 Feb 2024
Declaration in FORM BFile: FORM B.pdf20 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Bhute.pdf20 Feb 2024
Deviation Report with respect to Allotment letterFile: deviation allotment letter.pdf20 Feb 2024
Deviation Report with respect to model copy of AgreementFile: deviation agreement sale.pdf20 Feb 2024
PAN CardFile: PAN INFRA.pdf8 Jan 2024
CERSAI detailsFile: CERSAI.pdf8 Jan 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AKAR VISHWA PHASE 2P52800016360BEHIND CHIRAYU HOSPITAL, Ratnagiri25May 2018CompletedMay 2024Aug 2023
AKAR SWAROOPP52800018675BEHIND BANK OF INDIA, Ratnagiri13Nov 2018CompletedJan 2024Mar 2021
AKAR VISHWA PHASE 1P52800011556BEHIND CHIRAYU HOSPITAL, Ratnagiri24Aug 2017CompletedOct 2020Feb 2019

How this compares with Ratnagiri

33%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep AKAR SHERE PLAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOSHI PALAND NAKA1,100+ in Ratnagiri

Builder: AKAR INFRASTRUCTURE

AKAR INFRASTRUCTURE has 7 registrations on MahaRERA, including AKAR VISHWA PHASE 1 and AKAR VISHWA PHASE 2. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if AKAR SHERE PLAZA is delayed beyond 30 Nov 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKAR SHERE PLAZA?

The registered promoter entity is AKAR INFRASTRUCTURE, a partnership as per the filing. Its GSTIN 27ABHFA3858L1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKAR SHERE PLAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AKAR SHERE PLAZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKAR SHERE PLAZA?

The professionals named in the filing: Architect: Mr Milind Yadav; Architect: MILIND YADAV; Engineer: Mr Manoj Joshi; Engineer: ROHIT CHANDRAKANT BHARANKAR; Chartered Accountant: Mr Satyaroop Despande; Chartered Accountant: MASH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKAR SHERE PLAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKAR SHERE PLAZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKAR SHERE PLAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.