Home / Browse projects / Thane, Maharashtra / AKANKSHA CO. OP. HSG. SOC. LTD.

Registered No litigation declared Residential / Group Housing project

AKANKSHA CO. OP. HSG. SOC. LTD.

By KRISHNA BUILDCON

RG-MH-06429 · RERA P51700076666 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
58 of 68Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

AKANKSHA CO. OP. HSG. SOC. LTD. is a Residential / Group Housing project by KRISHNA BUILDCON in Thane, Maharashtra, registered with MahaRERA as P51700076666 on 20 Jun 2024. Possession is promised by 31 Dec 2026. 10 of the 68 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameAKANKSHA CO. OP. HSG. SOC. LTD.
  • TypeResidential / Group Housing
  • Location
    • AT VILLAGE KULGAON
    • KULGAON
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700076666
  • ReraGenie IDRG-MH-06429

Builder

  • NameKRISHNA BUILDCON
  • Entity typePartnership
  • PartnersSANDEEP DAYABHAI PATEL, PRAMOD VISHNU PATEL, ABHISHEK NARAYAN PATHADE, KISHAN SANDEEP PATEL, ISHWAR LALJI POKAR
  • Other registrations7 more →
  • Completed2 of 8
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

15%10 of 68 units booked
59.0%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AKANKSHA CO OP HSG SOC LTDNA7666268

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

AKANKSHA CO OP HSG SOC LTD: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed83

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots83
Closed/Covered44
Open Space39

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,086 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Feb 2026
LandownerVillageDistrict
EKNATH CHAHU JADHAVBadlapur (M Cl)Thane
UDAYSINGH BHIMSINGH PARMARBadlapur (M Cl)Thane
AKANKSHA CO-OP HSG. SOC. LTD.Badlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKBMC
Permissible FSI2987.33
Proposed, not sanctioned2,987 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBADLAPUR
Estimated costRs 7.94 cr
Cost incurredRs 4.68 cr
Work done58.97%
BuildingWingEstimatedIncurred
AKANKSHA CO OP HSG SOC LTDNARs 7.26 crRs 4.68 cr
-NARs 68.05 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAMOD V. PATIL & ASSOCIATES
EngineerATUL KUDTARKAR & ASSOCIATES PVT LTD
Chartered AccountantDINESH J POKAR & CO
PartnerRole in project
KRISHNA BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 Krishna Buildcon Q4 2025 - 26.pdf29 May 2026
Withdrawal Update Form 2File: Form2 Krishna Buildcon Q4 2025-26.pdf29 May 2026
Withdrawal Update Form 3File: Form3 Krishna Buildcon Q4 2025-26_11zon.pdf29 May 2026
Withdrawal Update Form 1File: Krishna Buildcon Form 1 Q3 25 26.pdf13 Feb 2026
Withdrawal Update Form 2File: Krishna Buildcon Form 2 Q3 25 26.pdf13 Feb 2026
Withdrawal Update Form 3File: Form 3 - Krishan Buildcon - FY 25 26 - Q3.pdf13 Feb 2026
Withdrawal Update Form 1File: Form 1 - Krishna Buildcon - Q2 - FY 25 26.pdf24 Dec 2025
Withdrawal Update Form 2File: Krishna Buildcon Form 2 - Q2 2025-26.pdf24 Dec 2025
Withdrawal Update Form 3File: Form 3 Krishna Buildcon - Q2 25-26.pdf24 Dec 2025
Withdrawal Update Form 1File: Form 1 - Krishna Buildcon- Q1 - FY 25 26.pdf23 Dec 2025
Withdrawal Update Form 2File: Krishna Buildcon Form 2 - Q1 2025-26 (1).pdf23 Dec 2025
Withdrawal Update Form 3File: Krishna Buildcon Form 3 - Q1 2025 - 26.pdf23 Dec 2025
Form 1File: Form 1 - Architect Akansha CHS badlapur.pdf18 Dec 2025
Form 2File: Form 2 Engineers Certificate.pdf18 Dec 2025
Form 3File: Form 3-Final.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q1 24 25 Disclosure KB.pdf18 Dec 2025
Self-declaration of Quarterly ProgressFile: Q1 24 25 self decelration_QPR KB.pdf18 Dec 2025
Form 1File: Form 1 - Krishna Buildcon - Akanksha - Q2 FY 24- 25.pdf18 Dec 2025
Form 2File: Form 2 - Krishna Buildcon - Akanksha - Q2 FY 24- 25.pdf18 Dec 2025
Form 3File: Form 3 - Krishna Buildcon - Akanksha - Q2 FY 24- 25.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q2 24 25 Disclosure KB.pdf18 Dec 2025
Self-declaration of Quarterly ProgressFile: Q2 24 25 Self Decleration KB.pdf18 Dec 2025
Form 1File: Form 1 - Krishna Buildcon FY 24 25 - Q3.Pdf18 Dec 2025
Form 2File: Form 2 - Krishna Buildcon FY 24 25 - Q3.pdf18 Dec 2025
Form 3File: Form 3 - Krishna Buildcon FY 24 25 - Q3.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q3 24 25 Disclosure KB .pdf18 Dec 2025
Self-declaration of Quarterly ProgressFile: Q3 24 25 Self Decleration KB.pdf18 Dec 2025
Form 1File: Krishna buildcon form 1 (Q4 Jan to March 25).pdf18 Dec 2025
Form 2File: Krishna buildcon form 2 (Q4 Jan to march 25).pdf18 Dec 2025
Form 3File: Krishna buildcon form 3 (Q4 Jan to march 25).pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q4 24 25 Diclosure KB.pdf18 Dec 2025
Self-declaration of Quarterly ProgressFile: Q4 24 25 Self Decelration KB.pdf18 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Krishna Buildcon FY 24 25 - Q3.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - FY 24-25 - Q3 - Krishna Buildcon.Pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Krishna Buildcon FY 24 25 - Q3.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Krishna Buildcon - Akanksha - Q2 FY 24- 25.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Krishna Buildcon - Akanksha - Q2 FY 24- 25_11zon.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Krishna Buildcon - Akanksha - Q2 FY 24- 25.pdf22 Nov 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Krishna Buildcon ( Akanksha).pdf22 May 2024
Other - TechnicalFile: MAIL SUBMISSION BY PLAN PASS AUTHORITY.pdf15 May 2024
Other - TechnicalFile: Annexure A - Krishna Buildcon ( Akanksha).pdf14 May 2024
Copy of the legal title reportFile: Akanksha Legal Title report.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf1 May 2024
CERSAI detailsFile: Cersai declaration.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf1 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclosure of Interest in other real estate organization.pdf1 May 2024
Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf1 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf1 May 2024
Copy of the legal title reportFile: Akanksha Search report.pdf18 Mar 2024
Layout approvalFile: Sanction plan_11zon.pdf16 Mar 2024
Building plan approvalFile: Sanction plan_11zon.pdf16 Mar 2024
PAN CardFile: Company PAN.pdf16 Mar 2024
Details of encumbrances concerned to FinanceFile: Declaration - Krishna Buildcon (Akanksha CHS).pdf16 Mar 2024
Details of encumbrances concerned to LegalFile: Declaration - Krishna Buildcon (Akanksha CHS).pdf16 Mar 2024
Copy of Layout Approval (in case of layout)File: Sanction plan_11zon.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction plan_11zon.pdf16 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf16 Mar 2024
Declaration about Commencement CertificateFile: Format - D Akansha Rera.pdf16 Mar 2024
Declaration in FORM BFile: Akanksha Form B-Promoter.pdf16 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Akansha CHS badlapur.pdf16 Mar 2024
Proforma of Allotment letterFile: Akanksha MODEL ALLOTMENT LETTER.pdf16 Mar 2024
Deviation Report with respect to Allotment letterFile: Divation letter - Agreement of sale.pdf16 Mar 2024
Other - LegalFile: Development Agreement Akansha_11zon.pdf16 Mar 2024
Other - LegalFile: Development agreement Supplementary 1.pdf16 Mar 2024
Other - LegalFile: Power of Attorney Akansha_11zon.pdf16 Mar 2024
Other - LegalFile: Authority letter - Akansha Rera.pdf16 Mar 2024
Other - FinanceFile: Partnership Deed-Merged.pdf16 Mar 2024
Other - FinanceFile: GST Certificate.pdf16 Mar 2024
Other - TechnicalFile: Rera Capet_GR_First_2nd to 6th.pdf16 Mar 2024

How this compares with Thane

15%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AKANKSHA CO. OP. HSG. SOC. LTD. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KULGAON7,600+ in Thane

Builder: KRISHNA BUILDCON

KRISHNA BUILDCON has 8 registrations on MahaRERA, including Krishna Nisarg and GOODWILL METROPOLIS EAST PHASE 1. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AKANKSHA CO. OP. HSG. SOC. LTD. is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKANKSHA CO. OP. HSG. SOC. LTD.?

The registered promoter entity is KRISHNA BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKANKSHA CO. OP. HSG. SOC. LTD.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AKANKSHA CO. OP. HSG. SOC. LTD.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKANKSHA CO. OP. HSG. SOC. LTD.?

The professionals named in the filing: Architect: PRAMOD V. PATIL & ASSOCIATES; Engineer: ATUL KUDTARKAR & ASSOCIATES PVT LTD; Chartered Accountant: DINESH J POKAR & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKANKSHA CO. OP. HSG. SOC. LTD.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKANKSHA CO. OP. HSG. SOC. LTD.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKANKSHA CO. OP. HSG. SOC. LTD. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.