Ajmera Eden
By Shree Yogi Realcon Private Limited
RG-MH-55326 · RERA P51800049667 · Last updated on MahaRERA portal: 11 Dec 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ajmera Eden is a Residential / Group Housing project by Shree Yogi Realcon Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049667 on 22 Feb 2023. The registration is recorded completed; possession was promised by 30 Jan 2027. 90 of the 97 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.
At a glance
Project
- NameAjmera Eden
- TypeResidential / Group Housing
- Location
- Pant Nagar
- Ghatkopar East Mumbai
- Ghatkopar
- Kurla
- Mumbai Suburban
- 400075
- Pincode400075
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800049667
- ReraGenie IDRG-MH-55326
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Feb 2023
- Promised completion30 Jan 2027
- Revised completionNone
- Buildings2 building records
- Documents filed97 files
Current status
Figures as on 11 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 18 | 16 | 41 | 0 | 41 |
| Wing B | NA | 18 | 16 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 11 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 20%.
Wing A13%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 20% |
| Podiums (if any) | 0% |
| Plinth | 20% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B13%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 20% |
| Podiums (if any) | 0% |
| Plinth | 20% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed154
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing A | 77 | 77 |
| Wing B | 77 | 77 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shree Yogi Realcon Private Limited | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A | NA | Rs 63.32 cr | Rs 19.58 cr |
| Wing B | NA | Rs 63.32 cr | Rs 19.58 cr |
| - | NA | Rs 2.95 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Enclsoure Private Limited |
| Architect | Archo Consultants |
| Engineer | Mr Ramchandra Mishra |
| Chartered Accountant | BSMS Company |
| Chartered Accountant | V. PAREKH & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Shree Yogi Realcon Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Form 4 signed.pdf | 11 Dec 2025 |
| Occupational CertificateFile: OC verification.pdf | 11 Dec 2025 |
| Occupational CertificateFile: pdf drawing-1.pdf | 9 Dec 2025 |
| Occupational CertificateFile: pdf drawing-2.pdf | 9 Dec 2025 |
| Occupational CertificateFile: pdf drawing-3.pdf | 9 Dec 2025 |
| Occupational CertificateFile: pdf drawing-4.pdf | 9 Dec 2025 |
| Occupational CertificateFile: pdf drawing-5.pdf | 9 Dec 2025 |
| Occupational CertificateFile: pdf drawing-6.pdf | 9 Dec 2025 |
| Occupational CertificateFile: pdf drawing-7.pdf | 9 Dec 2025 |
| Occupational CertificateFile: pdf drawing-8.pdf | 9 Dec 2025 |
| Occupational CertificateFile: pdf drawing-9.pdf | 9 Dec 2025 |
| Occupational CertificateFile: pdf drawing-10.pdf | 9 Dec 2025 |
| Occupational CertificateFile: Eden OC.pdf | 3 Dec 2025 |
| Form 1File: Form 1.pdf | 7 Nov 2025 |
| Form 2File: Form 2.pdf | 7 Nov 2025 |
| Form 3File: FORM 3.pdf | 7 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 7 Nov 2025 |
| Form 5 (FY 2024-2025)File: form 5.pdf | 23 Sep 2025 |
| Form 1File: ARCH SIGNED FORM 1.pdf | 2 Aug 2025 |
| Form 2File: Form 2.pdf | 2 Aug 2025 |
| Form 3File: FORM 3 EDEN Q1 FY 2025-2026 Signed.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 2 Aug 2025 |
| Form 2A (FY 2024-2025)File: eden sign.pdf | 25 Jun 2025 |
| Form 1File: Form 1.pdf | 22 May 2025 |
| Form 2File: Form 2.pdf | 22 May 2025 |
| Form 3File: EDEN Form 3 Q4 FY 2024-2025 Signed.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EDEN Q3 FY 2024-2025 Signed.pdf | 7 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EDEN FORM 3 Q2 FY 2024-2025 Signed.pdf | 13 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 11 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eden RERA cert 06112024.pdf | 6 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA 10-22-2024 eden form 1.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 EDEN FY 2023-2024 Signed.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 9 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 29 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 EDEN FY 2023-2024 Signed.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold eden.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality certificate EDEN (2).pdf | 7 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1.pdf | 8 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EDEN FORM 3 Q3 FY 2023-2024-Signed.pdf | 7 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 30 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf | 24 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 10 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eden RERA cert 15122023.pdf | 15 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EDEN CA Certificate Q2 FY 2023-2024 Signed.pdf | 6 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 60_6142_AJMERA EDEN (Form 5) 2022-23.pdf | 20 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 60_6142_AJMERA EDEN (Form 5) 2022-23.pdf | 20 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eden RERA Form 1.pdf | 2 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eden RERA Form 1 revised.pdf | 2 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EDEN FORM 3.pdf | 2 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Eden.pdf | 28 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eden.pdf | 24 Jul 2023 |
| Proforma of Agreement for saleFile: Corrected Payment Plan AFS.pdf | 6 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fOM 1 Arch certificate Ajmera Eden 19052023.pdf | 19 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE -PANT NAGAR.pdf | 19 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EDEN Q4 FORM 3 CA Certificate Signed.pdf | 18 May 2023 |
| Building plan approvalFile: Eden IOD NEW1 6.pdf | 24 Apr 2023 |
| Building plan approvalFile: Eden IOD NEW 7 11.pdf | 24 Apr 2023 |
| Building plan approvalFile: Eden IOD NEW12 16.pdf | 24 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Eden IOD NEW1 6.pdf | 24 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Eden IOD NEW 7 11.pdf | 24 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Eden IOD NEW12 16.pdf | 24 Apr 2023 |
| Proforma of Agreement for saleFile: AfsRera 16feb.pdf | 16 Feb 2023 |
| Layout approvalFile: pant_nagar_layout_page 1 marked.pdf | 10 Feb 2023 |
| Layout approvalFile: pant_nagar_layout_page 2 marked.pdf | 10 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: pant_nagar_layout_page 1 marked.pdf | 10 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: pant_nagar_layout_page 2 marked.pdf | 10 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: AFS Deviation 08 FEB.pdf | 10 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Real Est.pdf | 4 Feb 2023 |
| Proforma of Allotment letterFile: Final Allotment.pdf | 4 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
Keep Ajmera Eden on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ghatkopar East Mumbai6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 110 registered projects within 2 km.
THE VIEWS
AGNEL DEVELOPERS
THE VIEWS II
AGNEL DEVELOPERS
Drushti Emerald
SAMARTH DRUSHTI DEVELOPERS
East Syde
VL GAJAMUKH DEVELOPERS LLP
ROYAL ALTEZZA
SHRI GANESH DEVELOPERS
Damji Shamji Corporate Square - Wing C
Coronate Constructions
See every Mumbai Suburban project, with the district possession charts
Builder: Shree Yogi Realcon Private Limited
Shree Yogi Realcon Private Limited has 2 registrations on MahaRERA, including Ajmera Eden and Ajmera Solis. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Ajmera Eden is delayed beyond 30 Jan 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ajmera Eden?
The registered promoter entity is Shree Yogi Realcon Private Limited, a company as per the filing. Its CIN U45400MH2013PTC243647 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ajmera Eden?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Ajmera Eden?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ajmera Eden?
The professionals named in the filing: Architect: Enclsoure Private Limited; Architect: Archo Consultants; Engineer: Mr Ramchandra Mishra; Chartered Accountant: BSMS Company; Chartered Accountant: V. PAREKH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ajmera Eden?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback