Home / Browse projects / Pune, Maharashtra / AISHWARYAM HAMARA PHASE I

Completed No litigation declared Residential / Group Housing project

AISHWARYAM HAMARA PHASE I

By SAI ESSEN DEVELOPERS

RG-MH-01920 · RERA P52100002396 · Last updated on MahaRERA portal: 14 Mar 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 22 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
66 of 66Construction stages doneacross 6 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

AISHWARYAM HAMARA PHASE I is a Residential / Group Housing project by SAI ESSEN DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100002396 on 31 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2022. The completion date has moved by 22 months from the original filing.

At a glance

Project

  • NameAISHWARYAM HAMARA PHASE I
  • TypeResidential / Group Housing
  • Location
    • DEHU-MOSHI ROAD
    • MOSHI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412114
  • Pincode412114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002396
  • ReraGenie IDRG-MH-01920

Builder

  • NameSAI ESSEN DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABRFS7781C1ZL
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersNITIN BHIMSEN AGARWAL, NARENDRA BHIMSEN AGARWAL, SATISH BHIMSEN AGARWAL, DEEPAK ASHOK MANE, SURENDRA BHIMSEN AGARWAL, ASHOK RAGHUNATH MANE
  • Other registrations7 more →
  • Completed4 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2017First promiseAug 2020Revised toJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 31 Aug 2020)
  • Buildings6 building records
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A7NA140000
A8NA140000
A9NA140000
A10NA140000
A11NA140000
A12NA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 14 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

66 of 66 construction stages are filed complete across 6 buildings.

A7100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A8100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A9100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A10100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A11100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A12100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed1020

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,020
Closed/Covered354
Open Space666
BuildingClosed/CoveredOpen SpaceTotal
A713947186
A847139186
A942120162
A1042120162
A1142120162
A1242120162

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,310 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI44683.53
Proposed, not sanctioned36,688 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK, FORT, MUMBAI-400001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShashank Phadke
EngineerJAYANT INAMDAR
PartnerRole in project
SAI ESSEN DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005903Aug 2020 → Aug 2020

Reason as filed by the promoterWe have currently applied for the NOC’s required for procuring the occupation certificate but we have yet not received them.

EXT52100009222Aug 2020 → Dec 2021

Reason as filed by the promoterAwaiting completion certificate

Litigation declared1

CaseCourtStatus
105/2011/2011JMFC PIMPRIPENDING FOR ODRER

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 May 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Aug 2021

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: AISHWARYAM HAMARA- PH-I FROM 5.pdf14 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: REGISTRATION CERTIFICATE A7.pdf22 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: REGISTRATION CERTIFICATE A9.pdf22 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: REGISTRATION CERTIFICATE A11.pdf22 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: REGISTRATION CERTIFICATE A10.pdf22 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: REGISTRATION CERTIFICATE A8.pdf22 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: REGISTRATION CERTIFICATE A12.pdf22 Nov 2022
Architect’s Certificate on Completion of Project (Form 4)File: Aishwaryam Hamara Phase 1 - Form 4.pdf20 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Hamara 1 (form5) 19-20.pdf13 Oct 2021
Certificates of CA (Form 3)File: Aishwaryan Hamara- Jun-21.pdf7 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SED-AISHWARYAM HAMARA PH-I FORM 5 FY-20-21.pdf7 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: hamara complition_compressed (2).pdf5 Aug 2021
Details of Restarting of Construction work post lockdownFile: Hamara Phase 1.pdf2 Jul 2020
Details of encumbrancesFile: ENCUMBRANCE PH-I.pdf6 Mar 2020
Declaration in FORM BFile: FORM B PH-I.pdf6 Mar 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: AISH HAMARA PH-I CA 5.pdf1 Jan 2020
Layout approvalFile: layout plan.pdf11 May 2019
Layout approvalFile: layout plan.pdf11 May 2019
Details of encumbrancesFile: Encrumbrances Letter.pdf11 May 2019
Copy of Layout Approval (in case of layout)File: layout plan.pdf11 May 2019
Copy of Layout Approval (in case of layout)File: layout plan.pdf11 May 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf11 May 2019
Declaration in FORM BFile: Form B Hamara-compressed.pdf26 Dec 2018
Certificates of CA (Form 3)File: Aiswarma Hamara P-1 29042018.pdf16 Oct 2018
Certificates of CA (Form 5)File: HAMARA1.pdf15 Oct 2018
Declaration in FORM BFile: Form B SED.pdf6 Mar 2018
Declaration in FORM BFile: B Form Hamara Phase 1.pdf27 Nov 2017
Declaration in FORM BFile: B Form Hamara Phase 1.pdf27 Nov 2017
Declaration in FORM BFile: B Form Hamara Phase 1.pdf27 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINIRING CERTIFICATE HAMARA.pdf26 Jul 2017
Certificates of CA (Form 3)File: CA CERT.pdf26 Jul 2017
Building plan approvalFile: Building plan.pdf25 Jul 2017
Layout approvalFile: Layout 250717.pdf25 Jul 2017
Copy of the legal title reportFile: LEGAL TITTLE REPORT.pdf25 Jul 2017
Details of encumbrancesFile: encumbranees hamara.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout 250717.pdf25 Jul 2017
Building Plan Approval (IOD)File: Building plan.pdf25 Jul 2017
Declaration in FORM BFile: MX-M282N_20170725_205308.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificats.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC HAMARA.pdf17 Jun 2017
Proforma of Allotment letterFile: Finalized Draft for Aishwaryam Hamara Phase-I 25-07-2017.pdf17 Jun 2017
PAN CardFile: SED Pancard (1).pdf16 Jun 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 22 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AISHWARYAM HAMARA PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOSHI13,700+ in Pune

2 kmAISHWARYAM HAMARA PHASE Completed 162Lapsed / revoked 119Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: SAI ESSEN DEVELOPERS

SAI ESSEN DEVELOPERS has 8 registrations on MahaRERA, including AISHWARYAM HAMARA PHASE I and AISHWARYAM HAMARA PHASE II. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AISHWARYAM HAMARA PHASE I is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AISHWARYAM HAMARA PHASE I?

The registered promoter entity is SAI ESSEN DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABRFS7781C1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AISHWARYAM HAMARA PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AISHWARYAM HAMARA PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AISHWARYAM HAMARA PHASE I?

The professionals named in the filing: Architect: Shashank Phadke; Engineer: JAYANT INAMDAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AISHWARYAM HAMARA PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AISHWARYAM HAMARA PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AISHWARYAM HAMARA PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.