Home / Browse projects / Mumbai Suburban, Maharashtra / ADVENT DEEPAK

Registered No litigation declared Residential / Group Housing project

ADVENT DEEPAK

By ADVENT DEVELOPERS PRIVATE LIMITED

RG-MH-06350 · RERA P51800054861 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
3 of 9Construction stages donefurthest along: Slabs of Super Structure, 65%
73 of 74Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

ADVENT DEEPAK is a Residential / Group Housing project by ADVENT DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054861 on 15 Feb 2024. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 1 of the 74 units on this registration are recorded sold or booked, and 3 of 9 construction stages are filed complete.

At a glance

Project

  • NameADVENT DEEPAK
  • TypeResidential / Group Housing
  • Location
    • PAWAN BAUG ROAD
    • CHINCHOLI PHATAK
    • MALAD WEST
    • Chinchvali
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800054861
  • ReraGenie IDRG-MH-06350

Builder

  • NameADVENT DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorSHRIKANT AGARWAL
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2024First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed94 files

Current status

1%1 of 74 units booked
42.1%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DEEPAK APARTMENT CHS LTDNA201974074

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 65%.

DEEPAK APARTMENT CHS LTD: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed83

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots83
Closed/Covered83

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,092 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jul 2025
LandownerVillageDistrict
DEEPAK APARTMENT COOPERATIVE HOUSING SOCIETY LTDMaladMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4280.43
Proposed, not sanctioned4,221 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch325 Gitanjali Arcade 1st Floor Nehru Road Vile Parle East) PIN 400057
Estimated costRs 75.85 cr
Cost incurredRs 31.91 cr
Work done42.07%
BuildingWingEstimatedIncurred
-NARs 39.80 crRs 13.80 cr
DEEPAK APARTMENT CHS LTDNARs 36.05 crRs 18.11 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAASHISH SOLANKI
EngineerKAILASH ANWALA
EngineerUniSteps CONSULTING
Chartered AccountantAJIT SINGH & ASSOCIATES
Chartered AccountantVUDN & Associates LLP
Chartered AccountantJainam Doshi
PartnerRole in project
ADVENT DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26082502443Dec 2025 → Dec 2027

Reason as filed by the promoterWe, Advent Developers Private Limited, Promoters of the above-mentioned project, hereby submit this explanatory note in support of our request for an extension of the project completion date. 1. Grounds and Reasons for Delay The project has faced delays due to a combination of factors beyond our reasonable control: • Construction Challenges: The pace of RCC (Reinforced Cement Concrete) works slowed down due to logistical and manpower constraints during the initial phase. • Market Conditions: Considering prevailing real estate market trends and cautious buyer sentiment, we decided not to launch

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 March 2026.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf24 Jun 2026
Layout approvalFile: Drawing 08-05-2025-1.pdf28 Apr 2026
Building plan approvalFile: Drawing 08-05-2025-1.pdf28 Apr 2026
Building plan approvalFile: Drawing 08-05-2025-2.pdf28 Apr 2026
Building plan approvalFile: Drawing 08-05-2025-3.pdf28 Apr 2026
Building plan approvalFile: Drawing 08-05-2025-4.pdf28 Apr 2026
Building plan approvalFile: Drawing 08-05-2025-5.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 September 2025.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 December 2025.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 September 2025.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 December 2025.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 of RERA updated as on 30-06-2025.pdf7 Sep 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf7 Sep 2025
Withdrawal Update Form 3File: Form 3 Advent Deepak 30-06-2025.pdf7 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A for FY 23-24.pdf7 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A for FY 24-25.pdf7 Sep 2025
Form 5 (FY 2023-2024)File: Form 5_FY2023-24 Advent Realty 1.pdf26 Aug 2025
Form 5 (FY 2024-2025)File: Form 5_FY2024-25 Advent Realty 1.pdf26 Aug 2025
Form 1File: Form 1 of RERA updated as on 30-06-2024.pdf23 Jul 2025
Form 2File: Form 2 June 2024.pdf23 Jul 2025
Form 3File: Form 3 Advent Deepak 30-06-2024.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on 30-06-2024.pdf23 Jul 2025
Form 1File: Form 1 of RERA updated as on 30-09-2024.pdf23 Jul 2025
Form 2File: Form 2 September 2024.pdf23 Jul 2025
Form 3File: Form 3 Advent Deepak 30-09-2024.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on 30-09-2024.pdf23 Jul 2025
Form 1File: Form 1 of RERA updated as on 30-09-2024.pdf23 Jul 2025
Form 2File: Form 2 September 2024.pdf23 Jul 2025
Form 3File: Form 3 Advent Deepak 30-09-2024.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on 30-09-2024.pdf23 Jul 2025
Form 1File: Form 1 of RERA updated as on 31-03-2025.pdf23 Jul 2025
Form 2File: Form 2 March 2025.pdf23 Jul 2025
Form 3File: Form 3 Advent Deepak 31-03-2025.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on 31-03-2025.pdf23 Jul 2025
Form 1File: Form 1 of RERA updated as on 31-03-2024.pdf23 Jul 2025
Form 2File: Form 2 March 2024.pdf23 Jul 2025
Form 3File: Form 3 Advent Deepak 31-03-2024.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on 31-03-2024.pdf23 Jul 2025
Withdrawal Update Form 1File: Form 1 of RERA updated as on 30-06-2025.pdf23 Jul 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf23 Jul 2025
Withdrawal Update Form 3File: Form 3 Advent Deepak 30-06-2025.pdf23 Jul 2025
Layout approvalFile: Drawing-1.pdf30 Jan 2025
Building plan approvalFile: Drawing-1.pdf30 Jan 2025
Building plan approvalFile: Drawing-2.pdf30 Jan 2025
Building plan approvalFile: Drawing-3.pdf30 Jan 2025
Building plan approvalFile: Drawing-4.pdf30 Jan 2025
Copy of Layout Approval (in case of layout)File: Drawing-1.pdf30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 27012025 - DEEPAK - FURTHER CC UPTO 14TH FLOOR.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing-1.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing-2.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing-3.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing-4.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RERA ADVENT DEEPAK.pdf8 Jan 2024
Layout approvalFile: Layout Approval page 1.pdf18 Oct 2023
Layout approvalFile: Layout Approval page 2.pdf18 Oct 2023
Layout approvalFile: Layout Approval page 3.pdf18 Oct 2023
Layout approvalFile: Layout Approval page 4.pdf18 Oct 2023
Copy of Layout Approval (in case of layout)File: Layout Approval page 1.pdf18 Oct 2023
Copy of Layout Approval (in case of layout)File: Layout Approval page 2.pdf18 Oct 2023
Copy of Layout Approval (in case of layout)File: Layout Approval page 3.pdf18 Oct 2023
Copy of Layout Approval (in case of layout)File: Layout Approval page 4.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 of RERA 31082023.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of RERA 31082023.pdf16 Oct 2023
Proforma of Agreement for saleFile: PERFORMA AGREEMENT FOR SALE.pdf16 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format_A_Seperate_Bank_Account_.pdf16 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SHRIKANT_Disclosure of Interest in Other Real Estate Projects.pdf22 Jul 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance and Legal.pdf21 Jul 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ADVENT DIVINEADVENT DIVINE KAVIVAR PANDIT INDRA MARG J. B. NAGAR ANDHERI EAST MUMBAI 40005921CompletedMar 2023Late, Jun 2023
ADVENT PALAZZOADVENT PALAZZO BEHIND STATE BANK OF INDIA RAMBAUG SV ROAD MALAD WEST MUMBAI - 40006464CompletedJul 2018Jul 2018
ADVENT ATRIAADVENT ATRIA CHINCHOLI BUNDER ROAD OPP KINGSTON COMPLEX MALAD WEST42CompletedMar 2010Mar 2010

How this compares with Mumbai Suburban

1%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ADVENT DEEPAK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD WEST6,700+ in Mumbai Suburban

2 kmADVENT DEEPAKCompleted 114Lapsed / revoked 71Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 327 registered projects within 2 km.

Builder: ADVENT DEVELOPERS PRIVATE LIMITED

ADVENT DEVELOPERS PRIVATE LIMITED has 3 registrations on MahaRERA, including ADVENT PALAZZO and Advent Divine. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ADVENT DEEPAK is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ADVENT DEEPAK?

The registered promoter entity is ADVENT DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ADVENT DEEPAK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ADVENT DEEPAK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ADVENT DEEPAK?

The professionals named in the filing: Architect: AASHISH SOLANKI; Engineer: KAILASH ANWALA; Engineer: UniSteps CONSULTING; Chartered Accountant: AJIT SINGH & ASSOCIATES; Chartered Accountant: VUDN & Associates LLP; Chartered Accountant: Jainam Doshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADVENT DEEPAK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADVENT DEEPAK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADVENT DEEPAK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.