Home / Browse projects / Pune, Maharashtra / Adityas A Garden City

Completed No litigation declared Residential / Group Housing project

Adityas A Garden City

By ADITYA CONSTRUCTION

RG-MH-17058 · RERA P52100027750 · Last updated on MahaRERA portal: 13 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
11 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 90%
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Adityas A Garden City is a Residential / Group Housing project by ADITYA CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100027750 on 3 Jan 2021. The registration is recorded completed; possession was promised by 30 Oct 2025.

At a glance

Project

  • NameAdityas A Garden City
  • TypeResidential / Group Housing
  • Location
    • Near RMD Sinhgad College
    • Warje
    • Haveli
    • Pune
    • 411058
  • Pincode411058
  • RERA no.P52100027750
  • ReraGenie IDRG-MH-17058

Builder

  • NameADITYA CONSTRUCTION
  • Entity typePartnership
  • PartnersKEVALCHAND BHIKCHAND KATARIA, LALITKUMAR BHIKCHAND KATARIA, SHANTILAL BHIKCHAND KATARIA, SATISH BHIKCHAND KATARIA, PRAVIN BHIKCHAND KATARIA, SACHIN SUMATILAL LODHA, SHIKHA AJIT SANCHETI
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2021PromisedOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Jan 2021
  • Promised completion30 Oct 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SNA160000
TNA160000
UNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

S48%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
T48%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
U45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed125

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots125
Closed/Covered113
Open Space12
BuildingClosed/CoveredOpen SpaceTotal
S51455
T088
U62062

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,845 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12473.0
Proposed, not sanctioned12,473 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank, Narayan Peth

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSiddharth Harishchandrikar
EngineerJW Consultants
Chartered AccountantSPCM
PartnerRole in project
ADITYA CONSTRUCTION-

Litigation declared1

CaseCourtStatus
733/2015/2015Civil Court Senior Division PuneIssuance Of Notices

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Dec 2023

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: IMG_0003.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SIGNED FORM 5 AC 24.pdf13 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 AGC.pdf9 Aug 2024
Other - TechnicalFile: Declaration on Completion Certificate AC5.pdf29 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ADITYA GARDENCITY PART COMPLETION CERTIFICATE.pdf19 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ADITYA CONSTRUCITON SIGNED FORM-5_compressed.pdf8 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ADITYA CONSTRUCITON SIGNED FORM-5_compressed.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SCANNED FORM 3 AC_compressed_compressed (1).pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ACS.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ACT.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ACU.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 AC.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A AC.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: AC Sold unsold.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AC S 300623.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AC T 300623.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AC U 300623.pdf7 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AC 300623.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A AC 300623.pdf7 Jul 2023
Disclosure of sold/ booked inventoryFile: AC SOLD UNSOLD 300623.pdf7 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form 3 300623-compressed (1).pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 T.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 S.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 T.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AC.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf7 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold AC.pdf7 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AC_c_compressed_compressed.pdf7 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Enabling formation of Association -AGC.pdf1 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 AC S.pdf7 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 AC T.pdf7 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 AC U.pdf7 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F 2 AC.pdf7 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: F 2A AC.pdf7 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM, 03 AC_compressed.pdf7 Jan 2023
Layout approvalFile: Layout Plan AGC 2022.pdf30 Dec 2022
Building plan approvalFile: Building Plan AGC 2022.pdf30 Dec 2022
Copy of Layout Approval (in case of layout)File: Layout Plan AGC 2022.pdf30 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan AGC 2022.pdf30 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: AGC Building Plan Commencement Certificate.pdf30 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 AGC.pdf29 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC S WING ARCHITECT CERTIFICATE.pdf7 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC T WING ARCHITECT CERTIFICATE.pdf7 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC U WING ARCHITECT CERTIFICATE.pdf7 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AC FORM 2.pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: AC SOLD UNSOLD.pdf7 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL SCANNED COPY (1).pdf7 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3AC FINAL.pdf9 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC FORM 1 T.pdf8 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC FORM 1 U.pdf8 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC FORM1 S.pdf8 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A (1).pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: sold -unsold.pdf7 Jul 2022
Declaration about Commencement CertificateFile: ADITYA CONSTRUTION.pdf6 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC2 OF AGC.pdf25 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200235730737_For_Debtor_Based_Search_23_04_2022_16_33_41_654.pdf23 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A.pdf8 Apr 2022
Disclosure of sold/ booked inventoryFile: D.pdf8 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Binder1.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 4.pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SINGED FORM03 FINAL.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold Aditya Construction.pdf8 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aditya Constuction.pdf7 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aditya Construction.pdf7 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aditya Construction.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: DISCOLSURE AC SEPT21.pdf13 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AC FORM 5 MAR 21.pdf13 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AC Sep 21.pdf12 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AC SEPT21.pdf12 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A.pdf12 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AGC Form 3 Sep-21.pdf12 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A AGC June 21.pdf26 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Aditya Construction.pdf26 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aditya Garden City Eng Cer june 21.pdf25 Aug 2021
Disclosure of sold/ booked inventoryFile: Adityas A GardenCity Booked Inventory June 21.pdf25 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aditya Garden City Architect Certificate June 2021.pdf23 Aug 2021
Building plan approvalFile: layout plan.pdf13 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: layout plan.pdf13 Mar 2021
PAN CardFile: AC Pan Card.pdf6 Jan 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Adityas A Garden City on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Warje13,700+ in Pune

Builder: ADITYA CONSTRUCTION

ADITYA CONSTRUCTION has 3 registrations on MahaRERA, including AARTI PLAZA and Adityas A Garden City. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Adityas A Garden City is delayed beyond 30 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Adityas A Garden City?

The registered promoter entity is ADITYA CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Adityas A Garden City?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Adityas A Garden City?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Adityas A Garden City?

The professionals named in the filing: Architect: Siddharth Harishchandrikar; Engineer: JW Consultants; Chartered Accountant: SPCM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Adityas A Garden City?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Adityas A Garden City. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Adityas A Garden City to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.