Home / Browse projects / Thane, Maharashtra / ADITYA APARTMENTS BUILDING C

Completed No litigation declared Residential / Group Housing project

ADITYA APARTMENTS BUILDING C

By NAVIN NARANJI JAIN

RG-MH-44037 · RERA P51700018589 · Last updated on MahaRERA portal: 14 May 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 3 months
  • 5 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2020Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

ADITYA APARTMENTS BUILDING C is a Residential / Group Housing project by NAVIN NARANJI JAIN in Thane, Maharashtra, registered with MahaRERA as P51700018589 on 21 Nov 2018. The registration is recorded completed; possession was promised by 30 Sep 2020. The completion date has moved by 3 months from the original filing.

At a glance

Project

  • NameADITYA APARTMENTS BUILDING C
  • TypeResidential / Group Housing
  • Location
    • Kalyan Murbad Highway
    • Village Bapsai
    • Bapsai
    • Kalyan
    • Thane
    • 421103
  • Pincode421103
  • RERA no.P51700018589
  • ReraGenie IDRG-MH-44037

Builder

  • NameNAVIN NARANJI JAIN
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2018First promiseJun 2020Revised toSep 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Nov 2018
  • Promised completion30 Sep 2020
  • Revised completionRevised to 30 Sep 2020 (originally 30 Jun 2020)
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING CNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

BUILDING C: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Open Space21

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,930 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2930.41
Proposed, not sanctioned2,930 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchR R Reality LBS Road BHANDUP West Mumbai - 400078

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectULHAS KSHIRSAGAR & ASSOCIATES
EngineerE STRUCT CONSULTANCY PVT LTD
Chartered AccountantA. T. UPADHYE & CO.
Chartered AccountantPOOJA JAIN
PartnerRole in project
NAVIN NARANJI JAIN-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700009781Jun 2020 → Jun 2022

Reason as filed by the promoterdue to corona - covid19 pandemic period we are facing labour and financial rotation issues

EXT51700006064Jun 2020 → Jun 2021

Reason as filed by the promoterdue to covid19 lockdown situation we are finding difficulties in Labour, Raw material and sales and financial issues

EXT51700019743Jun 2020 → Jun 2024

Reason as filed by the promoterO C Received on 02-04-2024 and RERA validity was up to 31-03-2024

EXT51700013492Jun 2020 → Mar 2023

Reason as filed by the promoterconstruction of the building is completed and Occupation Certificate is under process. Extension is required for executing Sales Agreements till receipt of OC

EXT51700015448Jun 2020 → Mar 2024

Reason as filed by the promoterBuilding construction work is completed and O C is applied but since RERA Date expired on 31-03-2023 required to be extended till 31-03-2024

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Apr 2024

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B.pdf14 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf13 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 10-5-2024.pdf11 May 2024
Certificates of CA (Form 3)File: Form_3.pdf11 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf11 May 2024
Declaration in FORM BFile: Form B 10-5-2024.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 31-3-2024.pdf8 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: form 4 RERA 04-Apr-2024 11-23-53 Page 1.pdf7 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: C Bldg O C.pdf27 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory Sold 30-9-2023.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: certified form 5.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 12-10-2023.pdf12 Oct 2023
Home Buyer /Allottee Grievance Redressal CellFile: Grievances Cell declaration.pdf12 Oct 2023
Certificates of CA (Form 3)File: Form 3_compressed.pdf17 May 2023
Declaration in FORM BFile: Form B 16-5-2023.pdf16 May 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate 16-05-2023.pdf16 May 2023
Declaration in FORM BFile: FORM B 9-5-23_compressed.pdf9 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 01_compressed.pdf9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 02_compressed.pdf9 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A_compressed.pdf9 May 2023
Disclosure of sold/ booked inventoryFile: ADITYA- SOLD INVENTORY 2_compressed.pdf9 May 2023
Disclosure of sold/ booked inventoryFile: ADITYA - SOLD INVENTORY_compressed.pdf9 May 2023
Certificates of CA (Form 3)File: Form 3.pdf9 May 2023
Disclosure of sold/ booked inventoryFile: Details of Sold Unit 24-04-2023.pdf24 Apr 2023
Foreclosure of the ProjectFile: FORECLOSURE OF THE PROJECT.pdf24 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form- 1 Architect Certificate.pdf16 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 RCC Engg Certificate.pdf16 Jan 2023
Disclosure of sold/ booked inventoryFile: Details of sold Flat.pdf16 Jan 2023
Certificates of CA (Form 3)File: Form 3 - C A Cert.pdf16 Jan 2023
Certificates of CA (Form 3)File: Form 3 - C A Certificate.pdf16 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: No Interest.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5 C A Cert.pdf16 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation.pdf16 Jan 2023
Other - TechnicalFile: Format D - Aditya Developer.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 31-03-2022.pdf20 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Declration.pdf15 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance Declration.pdf15 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Qaulity Assurance Certificate_compressed(1).pdf15 Dec 2022
CERSAI detailsFile: Cersai.pdf15 Dec 2022
Proforma of Agreement for saleFile: PROFORMA AGREEMENT.pdf15 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Details required.pdf15 Dec 2022
Deviation Report with respect to Allotment letterFile: No Deviation allotment letter.pdf15 Dec 2022
Deviation Report with respect to model copy of AgreementFile: No Deviation sale agreements.pdf15 Dec 2022
Other - FinanceFile: form 4.pdf21 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A 30-9-21_compressed.pdf23 Nov 2021
Disclosure of sold/ booked inventoryFile: Sold-Unsold Flats 30-9-2021_compressed.pdf21 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 30-9-2021.pdf21 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificates 2019-20_compressed.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificates 2020-21_compressed.pdf12 Jul 2021
Declaration about Commencement CertificateFile: format D for bldg C 09-Jul-2021 12-54-07.pdf9 Jul 2021
Disclosure of sold/ booked inventoryFile: Aditya sold unsold 07-Jul-2021 11-49-13_compressed(2).pdf7 Jul 2021
Declaration about Commencement CertificateFile: CC 14-9-18_compressed.pdf6 Jul 2021
Declaration about Commencement CertificateFile: Commencement Declaration Form D.pdf6 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: D D Bhagat- Form 2A.pdf6 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: D D Bhagat- Form 2A.pdf6 Jul 2021
Disclosure of sold/ booked inventoryFile: Aditya- sold unsold 06-Jul-2021 16-02-13_compressed.pdf6 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form5 17-18.pdf6 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5 18-19.pdf6 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form5 19-20.pdf6 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5-20-21.pdf6 Jul 2021
Details of Restarting of Construction work post lockdownFile: Lockdown Cert.pdf6 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Work Completion Cert of Arch.pdf6 Jul 2021
OtherFile: RCC consultant cert.pdf6 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect certificate (signed).pdf31 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect certificate (signed).pdf31 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - RCC Engg certificate (signed).pdf31 May 2019
Certificates of CA (Form 3)File: Form 3 - CA certificate (signed) LowRes.pdf31 May 2019
Building plan approvalFile: 2-11.pdf12 Nov 2018
Layout approvalFile: 1-11.pdf12 Nov 2018
PAN CardFile: NJ - PAN.pdf12 Nov 2018
Copy of the legal title reportFile: ADV SANDESH POTE - TITLE CERT-ilovepdf-compressed.pdf12 Nov 2018
Details of encumbrancesFile: ADITYA DEVELOPERS Encomb.pdf12 Nov 2018
Copy of Layout Approval (in case of layout)File: 1-11.pdf12 Nov 2018
Building Plan Approval (IOD)File: 2-11.pdf12 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: CC-Aditya C Bldg.pdf12 Nov 2018
Declaration in FORM BFile: FORM B-rera.pdf12 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Architect RERA Cert-RERA.pdf12 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form- 2 RCC Engg Rera Cert- RERA-1.pdf12 Nov 2018
Certificates of CA (Form 3)File: Form 3 CA Cert -RERA.pdf12 Nov 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SUNRISE TOWERATALI ROAD AMBIVLI WEST TAL KALYAN DIST THANE18CompletedJul 2017Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 3 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ADITYA APARTMENTS BUILDING C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Bapsai7,600+ in Thane

Builder: NAVIN NARANJI JAIN

NAVIN NARANJI JAIN has 2 registrations on MahaRERA, including ADITYA APARTMENTS and ADITYA APARTMENTS BUILDING C. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ADITYA APARTMENTS BUILDING C is delayed beyond 30 Sep 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ADITYA APARTMENTS BUILDING C?

The registered promoter entity is NAVIN NARANJI JAIN, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ADITYA APARTMENTS BUILDING C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ADITYA APARTMENTS BUILDING C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ADITYA APARTMENTS BUILDING C?

The professionals named in the filing: Architect: ULHAS KSHIRSAGAR & ASSOCIATES; Engineer: E STRUCT CONSULTANCY PVT LTD; Chartered Accountant: A. T. UPADHYE & CO.; Chartered Accountant: POOJA JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADITYA APARTMENTS BUILDING C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADITYA APARTMENTS BUILDING C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADITYA APARTMENTS BUILDING C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.