ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / ADITIS RIBERA

Completed No litigation declared Residential / Group Housing project

ADITIS RIBERA

By ADITI REALTORS

RG-MH-25491 · RERA P52100013429 · Last updated on MahaRERA portal: 31 Dec 2019

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
0Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

ADITIS RIBERA is a Residential / Group Housing project by ADITI REALTORS in Pune, Maharashtra, registered with MahaRERA as P52100013429 on 5 Oct 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameADITIS RIBERA
  • TypeResidential / Group Housing
  • Location
    • Aundh Balewadi DP Road
    • Baner
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100013429
  • ReraGenie IDRG-MH-25491

Builder

  • NameADITI REALTORS
  • Entity typePartnership
  • PartnerAJIT BHAIRU PATIL
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredOct 2017First promiseDec 2018Revised toDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Oct 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ADITIS RIBERANA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Dec 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

ADITIS RIBERA: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 31 Dec 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes25%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes10%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered48
Open Space12

Land and ownership11

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,400 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
LandownerVillageDistrict
LAXMAN GANPAT JADHAVBanerPune
SULABHA LAXMAN JADHAVBanerPune
TUSHAR LAXMAN JADHAVBanerPune
VIMAL RAMDAS JADHAVBanerPune
MOHAN RAMDAS JJADHAVBanerPune
SARIKA MOHAN JADHAVBanerPune
SAYALI MOHAN JADAHVBanerPune
SANKET MOHAN JADHAVBanerPune
NANDU RAMDAS JADHAVBanerPune
UJWALA NANDU JADHAVBanerPune
SHUBHADA NANDU JADHAVBanerPune

Approvals and building plan

Permissible FSI4422.4
Proposed, not sanctioned3,999 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANER PUNE 411045

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTOMATO ARCHITECTURAL SOLUTIONS PVT LTD
PartnerRole in project
ADITI REALTORS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001230Dec 2018 → Dec 2019

Reason as filed by the promoterAll External and Internal works have been completed. Lift, STP, Drainage, Garden, Solar, Revised Provisional Fire NOC received. Final Fire NOC applied for. Application for Occupancy Certificate has been made on 20.12.2018. Now awaiting OC from Sanctioning Authority. Please grant the extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jan 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jan 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Dec 2019

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate final 001.pdf31 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: Ar 1 001.pdf31 Dec 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: REGISTRATION CERTIFICATE.pdf31 Dec 2019
Certificates of CA (Form 5)File: Form-5 New.pdf12 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Revised Sanction.pdf31 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate.pdf25 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerficate.pdf25 Sep 2018
Certificates of CA (Form 3)File: CA Certificate.pdf25 Sep 2018
Proforma of Allotment letterFile: Allotment Letter - Aditi's Ribera - RERA - pdf.pdf23 Jan 2018
Proforma of Allotment letterFile: Flat Booking Aditi Realtors Ribera - Pdf.pdf23 Jan 2018
Declaration in FORM BFile: Form B Declaration New_1.pdf9 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate FINAL.pdf9 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 070118.pdf9 Jan 2018
Certificates of CA (Form 3)File: CA Certificate Draft.pdf9 Jan 2018
Certificates of CA (Form 3)File: Final CA Certificate of RERA COMP.pdf9 Jan 2018
Building plan approvalFile: LAYOUT.PDF6 Jan 2018
Layout approvalFile: LAYOUT.PDF6 Jan 2018
Copy of Layout Approval (in case of layout)File: LAYOUT.PDF6 Jan 2018
Building Plan Approval (IOD)File: LAYOUT.PDF6 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate.pdf6 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aditi Rebira Certificate.pdf6 Jan 2018
Certificates of CA (Form 3)File: CA Certificate.pdf6 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf23 Sep 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf23 Sep 2017
Certificates of CA (Form 3)File: CA Certificate.pdf23 Sep 2017
Details of encumbrancesFile: Details of encumbrances.pdf18 Sep 2017
Declaration in FORM BFile: P H C Form B.pdf28 Aug 2017
Proforma of Allotment letterFile: Allotment Letter - Aditi's Ribera - RERA.pdf28 Aug 2017
Layout approvalFile: Sanctioned Layout Plan compressed.pdf19 Aug 2017
Copy of the legal title reportFile: search and Title report-compressed.pdf19 Aug 2017
Copy of Layout Approval (in case of layout)File: Sanctioned Layout Plan compressed.pdf19 Aug 2017
Building plan approvalFile: Sanctioned Plan COMPRESSED.pdf18 Aug 2017
PAN CardFile: Aditi Realtors PAN.pdf18 Aug 2017
Building Plan Approval (IOD)File: Sanctioned Plan COMPRESSED.pdf18 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: CC 1793.pdf18 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE COMPRESSED.pdf18 Aug 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ADITIS RIBERA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner13,700+ in Pune

2 kmADITIS RIBERACompleted 52Lapsed / revoked 25Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 106 registered projects within 2 km.

Builder: ADITI REALTORS

ADITI REALTORS has 2 registrations on MahaRERA, including ADITIS RIBERA and AV AASHIRWAD GARDEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ADITIS RIBERA is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ADITIS RIBERA?

The registered promoter entity is ADITI REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ADITIS RIBERA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ADITIS RIBERA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ADITIS RIBERA?

The professionals named in the filing: Architect: TOMATO ARCHITECTURAL SOLUTIONS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADITIS RIBERA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADITIS RIBERA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADITIS RIBERA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.