Home / Browse projects / Raigarh, Maharashtra / Adhiraj Capital City Tower Meraki

Registration lapsed Litigation declared Residential / Group Housing project

Adhiraj Capital City Tower Meraki

By Adhiraj Constructions Private Limited

RG-MH-15690 · RERA P52000022975 · Last updated on MahaRERA portal: 31 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Litigation declared, 5 cases
  • 5 complaints at MahaRERA
  • Rs 525.00 crore secured on the land, in favour of LIC Housing Finance Ltd

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 2%
34 of 272Units unsoldnot recorded sold or booked
5Complaints at MahaRERAon this registration
Jump to the 177 documents Report an error

Adhiraj Capital City Tower Meraki is a Residential / Group Housing project by Adhiraj Constructions Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000022975 on 6 Nov 2019. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 238 of the 272 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 5 complaints are on record with the regulator.

At a glance

Project

  • NameAdhiraj Capital City Tower Meraki
  • TypeResidential / Group Housing
  • Location
    • -
    • Rohinjan
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000022975
  • ReraGenie IDRG-MH-15690

Builder

  • NameAdhiraj Constructions Private Limited
  • Entity typeCompany
  • CINU45200MH1999PTC118665
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsKunj Behari Gupta, Brij Bhushan Gupta
  • Other registrations10 more →
  • Completed3 of 11
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

16 months past promisethis monthRegisteredNov 2019PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Nov 2019
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed177 files

Current status

88%238 of 272 units booked
10.0%Work done, per cost certificate

Figures as on 31 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Adhiraj Capital City Tower MerakiNA48472720272

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 2%.

Adhiraj Capital City Tower Meraki: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure2%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes76%
Water SupplyYes36%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes41%
Storm Water DrainsYes82%
Landscaping & Tree PlantingYes57%
Street LightingYes15%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes73%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes17%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,400 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofLIC Housing Finance Ltd
Secured amountRs 525.00 crore
CERSAI search filedYes
Declared on2 Jul 2025

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI19100.0
Proposed, not sanctioned18,289 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 47 48 110 Arenja Corner Palm Beach Road Sector 17 Vashi Navi Mumbai
Estimated costRs 145.93 cr
Cost incurredRs 14.63 cr
Work done10.02%
BuildingWingEstimatedIncurred
Adhiraj Capital City Tower MerakiNARs 118.93 crRs 8.14 cr
-NARs 27.00 crRs 6.48 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNitin Honawar
EngineerMr Bangarunaidu
EngineerMr Ajay Nagar
Chartered AccountantB K G & Associates
Chartered AccountantJKJS & Co. LLP
PartnerRole in project
Adhiraj Constructions Private Limited-

Litigation declared5

CaseCourtStatus
653/2007Senior Division PanvelOngoing
75/2014Senior Division PanvelOngoing
459/2021Senior Division PanvelClosed
5/2022Senior Division PanvelPending
5/20224th Jt.Civil Judge, J.D.and J.M.F.C.PanvelOngoing

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC006000000196279Kamlesh ChoudharyAdhiraj Constructions Private Limited09/03/2021
CC12400008Vinay Sadashiv NairAdhiraj Constructions Private Limited02/09/2024
CC12501977Malahari Gaynoba NaikAdhiraj Constructions Private Limited17/06/2025
CC12503746Ankit GhoshAdhiraj Constructions Private Limited26/10/2025
CC12601624Devesh TripathiAdhiraj Constructions Private Limited23/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Oct 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed177

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 177 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 Tower MERAKI FY 2425.pdf31 Dec 2025
Withdrawal Update Form 1File: Form 1 - Arch Cert - Tower Meraki - June 2025.pdf5 Sep 2025
Withdrawal Update Form 2File: Form 2 - Engineer Cert - Tower Meraki - June 2025.pdf5 Sep 2025
Withdrawal Update Form 3File: Form 3 - CA cert - Tower Meraki - June 2025.pdf5 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch Cert - Tower Meraki - March 2025.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Cert - Tower Meraki - March 2025.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: inventory - Tower Meraki - March 2025.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - meraki_11zon_11zon.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch Cert - Tower Meraki - Dec 24.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer cert - tower meraki - Dec 24.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory - Meraki - Dec 24.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adhiraj Capital city Tower Meraki-june 2024_11zon.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adhiraj Capital city Tower Meraki-September 2024_11zon (1).pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Tower Meraki - 2023 -2024.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 - Tower Meraki - Sept 2024.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Tower Meraki - Sept 2024.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory - Meraki - Sept 2024.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Tower Meraki - March 2024.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower Meraki Form 1 June 24.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower Meraki Form 2 June 24.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Tower Meraki Information Of Sold-Booked Inventory June 24.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Forrm 3 Dec 23 Tower Meraki_compressed.pdf29 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower meraki MARCH 2024_compressed.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 -meraki.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 meraki.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: booked inventory MERAKI_compressed.pdf19 Apr 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Societyformation meraki.pdf19 Apr 2024
Declaration about Commencement CertificateFile: Tower Meraki- CC declaration.pdf10 Jan 2024
Declaration about Commencement CertificateFile: cc declaration Meraki- Sept 2023.pdf10 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Tower Meraki.pdf10 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Tower Meraki.pdf10 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory Tower Meraki_11zon.pdf10 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3- CA cert - ADHIRAJ CAPITAL CITY TOWER MERAKI - Sept 2023.pdf25 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Meraki - 2022-2023.pdf25 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cert - Tower Meraki - March 2023_.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA - cert - Tower Meraki - June 2023_.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- Arch - Cert - Meraki SEPTEMBER(2023).pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer cert - Meraki - Sept 2023.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: Inventory - Meraki_Sept 2023.pdf10 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Society - Meraki.pdf10 Nov 2023
Declaration about Commencement CertificateFile: cc declaration - meraki - June 2023.pdf29 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Arch Cert - Tower Meraki - June 2023.pdf29 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineering Cert - Tower Meraki- June 2023.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A - meraki-March 2023 - Quality Assurance.pdf29 Aug 2023
Disclosure of sold/ booked inventoryFile: Inventory - Meraki.pdf29 Aug 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: society status - Meraki.pdf29 Aug 2023
Declaration about Commencement CertificateFile: meraki.pdf8 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: meraki_.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: meraki_.pdf8 May 2023
Disclosure of sold/ booked inventoryFile: meraki_.pdf8 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: meraki.pdf8 May 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate (Legal) - Tower Meraki_.pdf1 Apr 2023
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate (Finance) - Tower Meraki_.pdf1 Apr 2023
Details of encumbrances concerned to LegalFile: Encumbrance Certificate (Legal) - Tower Meraki_.pdf1 Apr 2023
Details of encumbrances concerned to LegalFile: Encumbrances Certificate (Finance) - Tower Meraki_.pdf1 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA cert - Tower Meraki - Dec 2022.pdf1 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Brij Bhushan Gupta.pdf1 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Kunj Gupta.pdf1 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A- Tower Meraki.pdf1 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Cert - Tower Meraki - Sept 2022.pdf6 Mar 2023
Declaration about Commencement CertificateFile: Meraki - cc declaration.pdf10 Feb 2023
Disclosure of sold/ booked inventoryFile: merki - inventory.pdf10 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: meraki - society.pdf10 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch Cert - Tower Meraki - Dec 2022.pdf27 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Enginner Cert - Tower Meraki - Dec 2022.pdf27 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert -March 2022 - meraki.pdf20 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA cert - Tower Meraki - June 2022.pdf20 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA cert - Tower Meraki - Dec 2021_.pdf19 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Meraki Form-2 Sep 22.pdf1 Dec 2022
Disclosure of sold/ booked inventoryFile: Meraki- inventory Sep 22.pdf1 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Meraki 2A 202122.pdf30 Nov 2022
Declaration about Commencement CertificateFile: Meraki CC Declarion September 2022.pdf29 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Meraki Form 1 September 2022.pdf29 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Adhiraj Form 5 Tower - Meraki news.pdf29 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch Cert - Tower Meraki - 30 June 2022.pdf28 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Cert - Tower Meraki - 30 June 2022.pdf28 Jul 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: society status - Tower Meraki - 30 June 2022.pdf28 Jul 2022
Details of encumbrancesFile: Details of Encumbrabce - March 2022.pdf8 Apr 2022
Declaration about Commencement CertificateFile: CC-Declaratrion - Meraki.pdf8 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch Certificate - Tower Meraki - March 2022.pdf8 Apr 2022

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Adhiraj Samyama Tower 2BP52000003039Rohinjan, Raigarh324Aug 2017CompletedNov 2023Registered original: Jun 2021Nov 2023
Adhiraj Samyama Tower 2AP52000007539-, Raigarh324Aug 2017CompletedNov 2023Registered original: Jun 2021Nov 2023
ZINNIAAdhiraj Gardens Sector 5 Plot No. 32 Kharghar Navi Mumbai38-CompletedSep 2017Late, Nov 2018
Cypress AquaAdhiraj Gardens Sector 5 Plot No. 32 Kharghar Navi Mumbai184-CompletedMar 2016Late, Mar 2017
CypressAdhiraj Gardens Sector 5 Plot No. 32 Kharghar Navi Mumbai83-CompletedJun 2015Late, Jun 2016

How this compares with Raigarh

88%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Adhiraj Capital City Tower Meraki on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -5,900+ in Raigarh

2 kmAdhiraj Capital City TowCompleted 26Lapsed / revoked 28Other 71Dot size: filed unitsN

Filed coordinates, straight-line distance. 125 registered projects within 2 km.

Builder: Adhiraj Constructions Private Limited

Adhiraj Constructions Private Limited has 11 registrations on MahaRERA, including Adhiraj Samyama Tower 2A and Adhiraj Samyama Tower 2B. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that Adhiraj Capital City Tower Meraki shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Adhiraj Capital City Tower Meraki is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Adhiraj Capital City Tower Meraki?

The registered promoter entity is Adhiraj Constructions Private Limited, a company as per the filing. Its CIN U45200MH1999PTC118665 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Adhiraj Capital City Tower Meraki?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Adhiraj Capital City Tower Meraki?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Adhiraj Capital City Tower Meraki?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Adhiraj Capital City Tower Meraki?

The professionals named in the filing: Architect: Nitin Honawar; Engineer: Mr Bangarunaidu; Engineer: Mr Ajay Nagar; Chartered Accountant: B K G & Associates; Chartered Accountant: JKJS & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Adhiraj Capital City Tower Meraki?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Adhiraj Capital City Tower Meraki. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Adhiraj Capital City Tower Meraki to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.