ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / ACETRON INDUSTRIAL ESTATE

Registration lapsed No litigation declared Mixed project

ACETRON INDUSTRIAL ESTATE

By ACETRON CONSTRUCTION LLP

RG-MH-57176 · RERA P99000018746 · Last updated on MahaRERA portal: 21 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 25%
0Complaints at MahaRERAon this registration
Jump to the 33 documents Report an error

ACETRON INDUSTRIAL ESTATE is a Mixed project by ACETRON CONSTRUCTION LLP in Palghar, Maharashtra, registered with MahaRERA as P99000018746 on 29 Nov 2018. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 48 months from the original filing.

At a glance

Project

  • NameACETRON INDUSTRIAL ESTATE
  • TypeMixed
  • Location
    • Chandansar
    • HDIL Industrial Road
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401305
  • Pincode401305
  • RERA no.P99000018746
  • ReraGenie IDRG-MH-57176

Builder

  • NameACETRON CONSTRUCTION LLP
  • Entity typeOthers
  • Named personsJEETENDER JAIKISHAN ASWANI, DEEPAK KAIN, MOHIT ASHOK NAWANY, SAGAR RAJKUMAR GWALLANI, DINESH K MULANI
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

16 months past promisethis monthRegisteredNov 2018First promiseJun 2021Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Nov 2018
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed33 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG NO 1NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 25%.

BLDG NO 1: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,905 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2282.2
Proposed, not sanctioned2,282 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 TURNER HEIGHTS TURNER ROAD BANDRA WEST MUMBAI 400050

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDivyesh shah
EngineerAnil gattani
Chartered AccountantSHAH DESAI & ASSOCIATES
Chartered AccountantNIYATI S LOLADIA & ASSOCIATES
PartnerRole in project
ACETRON CONSTRUCTION LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000010829Jun 2021 → Dec 2024

Reason as filed by the promoterDelayed due to approval delay, CC was on 17/3/2017 but Plinth CC received in Jan 2021 (attached). No Units sold so far, attached 7/3 form as directed.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Feb 2025

Documents filed33

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Acetron Industrial.pdf21 Feb 2025
Certificates of CA (Form 3)File: Form 3-Signed.pdf7 Oct 2024
Certificates of CA (Form 3)File: Form 3-Signed.pdf7 Oct 2024
Certificates of CA (Form 3)File: Form 3-Signed.pdf7 Oct 2024
Certificates of CA (Form 3)File: Form 3-Signed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ACLLP FORM 5.pdf25 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf30 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Acetron Construction LLP Form-5 ( FY 2021-2022) Certificate.pdf25 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Letter after Signatures.pdf9 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 2021_compressed (3)_11zon.pdf25 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 2018- 2019.pdf21 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-2020.pdf21 Oct 2021
Declaration about Commencement CertificateFile: Declaration of CC Circular Copy.pdf20 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA 1.pdf20 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Booked Inventory.pdf20 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Acetron Construction Form 5 (2019 20102021).pdf20 Oct 2021
OtherFile: Work Stop Scan.pdf20 Oct 2021
Building plan approvalFile: Approval plan 1.pdf22 Nov 2018
Building plan approvalFile: Approval plan 2.pdf22 Nov 2018
Layout approvalFile: Layout plan Compressed.pdf22 Nov 2018
Copy of the legal title reportFile: Title Certificate 60.pdf22 Nov 2018
Copy of the legal title reportFile: Title Certificate 61.pdf22 Nov 2018
Details of encumbrancesFile: Encruebance Letter.pdf22 Nov 2018
Copy of Layout Approval (in case of layout)File: Layout plan Compressed.pdf22 Nov 2018
Building Plan Approval (IOD)File: Approval plan 1.pdf22 Nov 2018
Building Plan Approval (IOD)File: Approval plan 2.pdf22 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: cc copy bldg 61.pdf22 Nov 2018
Declaration in FORM BFile: Declaration form B.pdf22 Nov 2018
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf22 Nov 2018
Proforma of Allotment letterFile: Allotment Letter DRAFT.pdf22 Nov 2018
Proforma of Allotment letterFile: Acetron Const Agreement Draft.pdf22 Nov 2018
PAN CardFile: Acetron Construction LLP PAN Card.pdf20 Nov 2018

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 48 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ACETRON INDUSTRIAL ESTATE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HDIL Industrial Road3,200+ in Palghar

Builder: ACETRON CONSTRUCTION LLP

ACETRON CONSTRUCTION LLP has 2 registrations on MahaRERA, including INFINITI INDUSTRIAL ESTATE I and ACETRON INDUSTRIAL ESTATE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that ACETRON INDUSTRIAL ESTATE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ACETRON INDUSTRIAL ESTATE is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ACETRON INDUSTRIAL ESTATE?

The registered promoter entity is ACETRON CONSTRUCTION LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ACETRON INDUSTRIAL ESTATE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ACETRON INDUSTRIAL ESTATE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ACETRON INDUSTRIAL ESTATE?

The professionals named in the filing: Architect: Divyesh shah; Engineer: Anil gattani; Chartered Accountant: SHAH DESAI & ASSOCIATES; Chartered Accountant: NIYATI S LOLADIA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ACETRON INDUSTRIAL ESTATE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ACETRON INDUSTRIAL ESTATE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ACETRON INDUSTRIAL ESTATE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.