ABIL BOULEVARD

By ABIL PROPCON LLP

RG-MH-22366 · RERA P52100031530 · Last updated on MahaRERA portal: 8 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
0Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

ABIL BOULEVARD is a Commercial project by ABIL PROPCON LLP in Pune, Maharashtra, registered with MahaRERA as P52100031530 on 25 Oct 2021. Possession was promised by 30 Dec 2024 and is now 22 months past that date. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameABIL BOULEVARD
  • TypeCommercial
  • Location
    • Land bearing.NO. 35A/2
    • 35A/3
    • 36/1
    • 36/2
    • and corresponding CTS NO.279
    • admeasuring 8
    • 746.60 Sq. Mtrs
    • Village- Ghorpadi
    • Taluka- Pune city
    • District-Pune
    • ...
  • Pincode411001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031530
  • ReraGenie IDRG-MH-22366

Builder

  • NameABIL PROPCON LLP
  • Entity typeOthers
  • Named personsSOHRAB ERUCH CHINOY, ZUBIN SOHRAB CHINOY

Key dates

22 months past promisethis monthRegisteredOct 2021First promiseJun 2024Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Oct 2021
  • Promised completion30 Dec 2024
  • Revised completionRevised to 30 Dec 2024 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed112 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ABIL BOULEVARDNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

ABIL BOULEVARD: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 8 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes20%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes95%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed502

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots502
Closed/Covered502

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,747 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ABIL PROPCON LLPPune (M Corp.)Pune

Approvals and building plan

Permissible FSI44271.85
Proposed, not sanctioned44,272 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFERGUSSON COLLEGE ROAD, SHIVAJI NAGAR PUNE 411 005

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSSA ARCHITECTS
EngineerJW CONSULTANTS LLP
Chartered AccountantSUPRIYA ABHIJEET MUNDADA
PartnerRole in project
ABIL PROPCON LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019758Jun 2024 → Dec 2024

Reason as filed by the promoterfor the purpose of completing the project we have already applied for getting licence for working of lift to the Electrical Inspector Lifts, Mumbai. Thus, the Licence for working of lifts is yet to be received. It is anticipated that date (s) of receipt of the licence/permissions/approvals in relation to completion of the real estate project may extend beyond 30th June, 2024. Therefore, we may not be able to obtain and upload the full occupancy certificate along with Form 4 on or before mentioned completion date. Accordingly and considering the said, we estimate that date of completion of the

Litigation declared1

CaseCourtStatus
WAQF SUIT NO 06/2019MAHARASHTRA STATE WAQF TRIBUNALSTATUS QUO

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Feb 2025

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ABIL PROPCON.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ABIL PROPCON.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD ABIL Boulevard.pdf8 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ABIL.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ABIL Boulevard.pdf9 Apr 2025
Other - LegalFile: Boulevard Full OC 13032025.pdf17 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Boulevard- Part OC 10022025.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ABIL BOULEVARD.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ABIL BOULEVARD_organized.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ABIL PROPCON LLP.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: ABC sold-unsold.pdf6 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-2024 Boulevard.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: sold unsold abil boulevard.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: sold inventory.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a letter head.pdf21 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other organisation.pdf17 Jun 2024
Declaration in FORM BFile: FORM B.pdf30 May 2024
CERSAI detailsFile: cersai.pdf29 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank acc details.pdf29 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf20 May 2024
Disclosure of sold/ booked inventoryFile: diclosure of sold inventory.pdf20 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf20 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf23 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: sold inventory.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf12 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 Boulevard.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 boulevard.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 boulevard.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: sold inventory.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf3 Jul 2023
Disclosure of sold/ booked inventoryFile: sold inventory.pdf3 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC 0222.pdf24 May 2023
Commencement Certificates / NA Order for plotted developmentFile: cc 2375.pdf24 May 2023
Commencement Certificates / NA Order for plotted developmentFile: cc 2711.pdf24 May 2023
Layout approvalFile: 1942_compressed.pdf23 May 2023
Layout approvalFile: 2624_compressed.pdf23 May 2023
Copy of Layout Approval (in case of layout)File: 1942_compressed.pdf23 May 2023
Copy of Layout Approval (in case of layout)File: 2624_compressed.pdf23 May 2023
Commencement Certificates / NA Order for plotted developmentFile: C C 194222_compressed.pdf23 May 2023
Commencement Certificates / NA Order for plotted developmentFile: C C 262422_compressed.pdf23 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf26 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf24 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf6 Apr 2023
Disclosure of sold/ booked inventoryFile: booked inventory.pdf6 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed (3).pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: sold inventory.pdf10 Jan 2023
Other - LegalFile: abil boulevard.pdf17 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf27 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 221015 GHORPADI.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APRIL.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate ABIL Boulevard Sept 22.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JULY.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY JULY.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY OCT.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ABIL Propcon LLP Certificate Sept 22.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JULY.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed (4).pdf28 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Abil propcon LLP Certificate of financial progress_compressed.pdf28 Jun 2022
Layout approvalFile: CC 4093_29032022.pdf19 Apr 2022
Building plan approvalFile: CC 4093_2021 dated 29032022.pdf19 Apr 2022
Copy of Layout Approval (in case of layout)File: CC 4093_29032022.pdf19 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: CC 4093_2021 dated 29032022.pdf19 Apr 2022
Disclosure of sold/ booked inventoryFile: Disclouser Letter.pdf15 Apr 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ABIL BOULEVARD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHORPADI13,700+ in Pune

2 kmABIL BOULEVARDCompleted 19Lapsed / revoked 10Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 97 registered projects within 2 km.

Builder: ABIL PROPCON LLP

ABIL PROPCON LLP has 1 registration on MahaRERA, including ABIL BOULEVARD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that ABIL BOULEVARD shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ABIL BOULEVARD is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ABIL BOULEVARD?

The registered promoter entity is ABIL PROPCON LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ABIL BOULEVARD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ABIL BOULEVARD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ABIL BOULEVARD?

The professionals named in the filing: Architect: SSA ARCHITECTS; Engineer: JW CONSULTANTS LLP; Chartered Accountant: SUPRIYA ABHIJEET MUNDADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ABIL BOULEVARD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ABIL BOULEVARD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ABIL BOULEVARD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.