ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Aaranyam - A Project by SDPL

Registered No litigation declared Plotted project

Aaranyam - A Project by SDPL

By SANDEEP DWELLERS PVT. LTD.

RG-MH-30491 · RERA P50500049338 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 26 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
162 of 258Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Aaranyam - A Project by SDPL is a Plotted project by SANDEEP DWELLERS PVT. LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500049338 on 7 Feb 2023. Possession is promised by 31 Dec 2027. 96 of the 258 units on this registration are recorded sold or booked.

At a glance

Project

  • NameAaranyam - A Project by SDPL
  • TypePlotted
  • Location
    • Amravati Road Bypass
    • Lawa
    • Lavha
    • Nagpur (Rural)
    • Nagpur
    • 440023
  • Pincode440023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500049338
  • ReraGenie IDRG-MH-30491

Builder

  • NameSANDEEP DWELLERS PVT. LTD.
  • Entity typeCompany
  • CINU45200MH1990PTC058101
  • GSTIN27AACCS0133P1Z9
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorASHOK SUBHASKUMAR AGARWALA
  • Other registrations26 more →
  • Completed13 of 27
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed81 files

Current status

37%96 of 258 units booked
63.0%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes68%
Water SupplyYes45%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes55%
Street LightingYes30%
Community BuildingsYes40%
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntYes75%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes90%
Open ParkingNoNot applicable

Land and ownership12

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area49,381 sq m
Land owned byNot the promoter
Named landowners12
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 May 2026
LandownerVillageDistrict
Ashok AgarwalaNagpur (M Corp.)Nagpur
Reena AgarwalaNagpur (M Corp.)Nagpur
Anil AgarwalaNagpur (M Corp.)Nagpur
Smita AgarwalaNagpur (M Corp.)Nagpur
Gaurav AgarwalaNagpur (M Corp.)Nagpur
Akanksha AgarwalaNagpur (M Corp.)Nagpur
Rahul AgarwalaNagpur (M Corp.)Nagpur
Subhas Kumar Ashok Kumar (HUF)Nagpur (M Corp.)Nagpur
Ashok Agarwala & Sons (HUF)Nagpur (M Corp.)Nagpur
Anil Agarwala (HUF)Nagpur (M Corp.)Nagpur
Gaurav Agarwala (HUF)Nagpur (M Corp.)Nagpur
Sandeep Dwellers Private LimitedNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority
Permissible FSI79907.09
Proposed, not sanctioned79,907 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLOOR, PLOT NO.34, OPP.HDFC BANK, BYRAMJI TOWN,NAGPUR-440001
Estimated costRs 14.03 cr
Cost incurredRs 8.84 cr
Work done63.0%
BuildingWingEstimatedIncurred
-NARs 14.03 crRs 8.84 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Agarwala
EngineerAman Kumar Singh
EngineerAshish Shiwarkar
EngineerPrasanna Kulkarni
Chartered AccountantParesh Tank
Chartered AccountantBC BHARTIA
Chartered AccountantAkshay Yawalkar
PartnerRole in project
SANDEEP DWELLERS PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Aaranyam - Architect Form 1 - Mar 26.pdf21 Apr 2026
Withdrawal Update Form 2File: Aaranyam - Engineer Form 2 - Mar 26.pdf21 Apr 2026
Withdrawal Update Form 3File: Aaranyam - CA Form 3 - Mar 26.pdf21 Apr 2026
Withdrawal Update Form 1File: Aaranyam - Architect Form 1 - Mar 26.pdf20 Apr 2026
Withdrawal Update Form 2File: Aaranyam - Engineer Form 2 - Mar 26.pdf20 Apr 2026
Withdrawal Update Form 3File: Aaranyam - CA - Dec 25.pdf20 Apr 2026
Withdrawal Update Form 1File: Aaranyam - Architect Form 1 - Mar 26.pdf18 Apr 2026
Withdrawal Update Form 2File: Aaranyam - Engineer Form 2 - Mar 26.pdf18 Apr 2026
Withdrawal Update Form 3File: Aaranyam - CA - Dec 25.pdf18 Apr 2026
Withdrawal Update Form 1File: Aaranyam - Architect - Dec 25.pdf15 Jan 2026
Withdrawal Update Form 2File: Aaranyam - Engineer - Dec 25.pdf15 Jan 2026
Withdrawal Update Form 3File: Aaranyam - CA - Dec 25.pdf15 Jan 2026
Withdrawal Update Form 1File: Architect - Aaranyam - Oct 25.pdf17 Oct 2025
Withdrawal Update Form 1File: Architect - Aaranyam - Oct 25.pdf17 Oct 2025
Withdrawal Update Form 2File: Engineer - Aaranyam - Oct 25.pdf17 Oct 2025
Withdrawal Update Form 2File: Engineer - Aaranyam - Oct 25.pdf17 Oct 2025
Withdrawal Update Form 3File: CA - Aaranyam - Oct 25.pdf17 Oct 2025
Withdrawal Update Form 3File: CA - Aaranyam - Oct 25.pdf17 Oct 2025
Form 2A (FY 2023-2024)File: SAR - Form 2A.pdf23 Sep 2025
Form 2A (FY 2024-2025)File: SAR - Form 2A.pdf23 Sep 2025
Form 2A (FY 2022-2023)File: SAR - Form 2A.pdf15 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaranyam- Architect - Mar 25.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaranyam - CA - Mar 25-compressed.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aaranyam- Engineer - Mar 25.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaranyam- CA - Dec 24.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaranyam- Architect - Dec 24.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aaranyam- Engineer - Dec 24.pdf11 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Aaranyam-compressed.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Aaranyam-compressed.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaranyam_compressed.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaranyam.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aaranyam.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Aaranyam - Supervisor - 2024.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaranyam_compressed.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AARANYAM - Architect - 30Jun24.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aaranyam - Engineer - 30Jun24.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AARANYAM - CA Certificate - 31Mar24.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: aaranyam.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aaranyam- SDPL.pdf10 Apr 2024
Other - LegalFile: MOU - Aaranyam Land Owners_compressed.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - SDPL Aaranyam- Dec23.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - SDPL Aaranyam- Dec23.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - Aranyam- Dec23.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaranyam_compressed.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect- Aaranyam- 30Sep23.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - Aaranyam - Sep 23.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AARANYAM.pdf26 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aaranyam -A.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect- Aaranyam -A- 30Jun23.pdf7 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - Aaranyam- 30Jun23.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aaranyam - Supervisor - 31 March 23.pdf19 Jun 2023
Other - LegalFile: Adobe Scan 22-Apr-2023.pdf22 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 21-Apr-2023 (2)_compressed.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Aaranyam - Mar 23.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - Aaranyam - Mar 23.pdf19 Apr 2023
Proforma of Agreement for saleFile: Revised AGREEMENT-AARANYAM LAWA-feb 23.pdf3 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation agreement - aaranyam - feb 23.pdf3 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA clarification letter - CA - Aaranyam.pdf23 Jan 2023
Other - LegalFile: RERA land owner letter - Aaranyam.pdf23 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Adobe Scan 14-Jan-2023.pdf14 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Revised - AARANYAM.pdf7 Jan 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER FORMAT - Aaranyam.pdf7 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank declaration.pdf7 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation allotment - aaranyam.pdf7 Jan 2023
Other - LegalFile: RERA clarification letter - Aaranyam.pdf7 Jan 2023
Layout approvalFile: Layout sanction - kalyani.pdf14 Dec 2022
Building plan approval or NA orderFile: Na order.pdf14 Dec 2022
Layout approvalFile: Layout sanction 2022.pdf14 Dec 2022
Layout approvalFile: Tentative Layout Sanction Letter_compressed.pdf14 Dec 2022
PAN CardFile: PAN Card- SDPL - Copy signed.pdf14 Dec 2022
Copy of the legal title reportFile: Title search report - Aaranyam.pdf14 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrances.pdf14 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrances.pdf14 Dec 2022
Copy of Layout Approval (in case of layout)File: Layout sanction - kalyani.pdf14 Dec 2022
Copy of Layout Approval (in case of layout)File: Layout sanction 2022.pdf14 Dec 2022
Copy of Layout Approval (in case of layout)File: Tentative Layout Sanction Letter_compressed.pdf14 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Na order.pdf14 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Na order.pdf14 Dec 2022
Declaration about Commencement CertificateFile: commencement declaration.pdf14 Dec 2022
Declaration in FORM BFile: Form B - SDPL.pdf14 Dec 2022

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SDPL ClassicPlot no 35 Kh. No. 302 Chinchbhuvan Wardha Road Near Khapri Nagpur 44002543CompletedJun 2017Apr 2017
SDPL Greens Wing B and D and Convenience ShoppingKh No. 13-15 Opp. Star Motors Kamptee Road Nagpur 440026131CompletedMay 2017Nov 2016
SDPL Paradise Wing A and BBehind Water Tank Dabha Nagpur 44002372CompletedSep 2016Late, Oct 2016
Shree Swaminarayan EnclaveNext to Sadashiv Nagar Near Swaminarayan Temple Wathoda Nagpur 44000898CompletedDec 2014Late, Feb 2015
NILGIRIOpp. Transport Plaza Automotive Chowk Kamptee Road Nagpur 44002655CompletedSep 2014Late, Dec 2014

How this compares with Nagpur

37%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aaranyam - A Project by SDPL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lawa2,800+ in Nagpur

2 kmAaranyam - A Project by Completed 6Lapsed / revoked 3Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: SANDEEP DWELLERS PVT. LTD.

SANDEEP DWELLERS PVT. LTD. has 27 registrations on MahaRERA, including SDPL Aashray Dabha and SDPL Paradise II. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Aaranyam - A Project by SDPL is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aaranyam - A Project by SDPL?

The registered promoter entity is SANDEEP DWELLERS PVT. LTD., a company as per the filing. Its CIN U45200MH1990PTC058101 and GSTIN 27AACCS0133P1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aaranyam - A Project by SDPL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aaranyam - A Project by SDPL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aaranyam - A Project by SDPL?

The professionals named in the filing: Architect: Rahul Agarwala; Engineer: Aman Kumar Singh; Engineer: Ashish Shiwarkar; Engineer: Prasanna Kulkarni; Chartered Accountant: Paresh Tank; Chartered Accountant: BC BHARTIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aaranyam - A Project by SDPL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aaranyam - A Project by SDPL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aaranyam - A Project by SDPL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one