Completed No litigation declared Commercial project

AARADHYA PRIMUS

By MAN VASTUCON LLP

RG-MH-22868 · RERA P51700023844 · Last updated on MahaRERA portal: 13 Jul 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

AARADHYA PRIMUS is a Commercial project by MAN VASTUCON LLP in Thane, Maharashtra, registered with MahaRERA as P51700023844 on 7 Jan 2020. The registration is recorded completed; possession was promised by 30 Mar 2023.

At a glance

Project

  • NameAARADHYA PRIMUS
  • TypeCommercial
  • Location
    • WESTERN EXPRESS HIGHWAY
    • NEAR SINGAPORE INTERNATIONAL SCHOOL
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700023844
  • ReraGenie IDRG-MH-22868

Builder

  • NameMAN VASTUCON LLP
  • Entity typeOthers
  • Named personsSUKETU P SHAH, MAN INFRACONSTRUCTION LIMITED
  • Other registrations5 more →
  • Completed4 of 6

Key dates

this monthRegisteredJan 2020PromisedMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Jan 2020
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AARADHYA PRIMUSNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

AARADHYA PRIMUS: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area299 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
GOAN HOTELS & REALTY PRIVATE LIMITEDBorivaliMumbai Suburban
HORIZONTAL REALTY AND AVIATION PRIVATE LIMITEDBorivaliMumbai Suburban
EVERSMILE CONSTRUCTION COMPANY PRIVATE LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI951.88
Proposed, not sanctioned952 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHATKOPAR EAST, MUMBAI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDISHA DESIGN CONSULTANTS
EngineerRAVINDRA YEVALE
Chartered AccountantHEMAN CHHEDA AND CO
Chartered AccountantM A PARIKH & CO
PartnerRole in project
MAN VASTUCON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Nov 2022

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY202223.pdf13 Jul 2023
Details of encumbrancesFile: Declaration of No Financial Encumbrances Primus 20042023.pdf20 Apr 2023
Details of encumbrancesFile: Aaradhya Primus Financial Encumbrance Details 05012023 ECLFL.pdf6 Jan 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf30 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Dated 09112022.pdf23 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Corrigendum of OC Dated 18112022.pdf23 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION CERTIFICATES.pdf4 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 12102022 Aaradhya Primus.pdf19 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21062022.pdf13 Oct 2022
CERSAI detailsFile: CERSAI 30092022.pdf11 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold and Unsold 30092022.pdf8 Oct 2022
Details of encumbrancesFile: Aaradhya Primus Financial Encumbrance Details.pdf28 Sep 2022
Details of encumbrances concerned to LegalFile: Aaradhya Primus Declaration of No Encumbrances LEGAL.pdf28 Sep 2022
Other - FinanceFile: Rqst Ltr for Withdrawal Primus 29082022.pdf6 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 23082022.pdf23 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 23082022.pdf23 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 07072022.pdf7 Jul 2022
CERSAI detailsFile: CERSAI PRIMUS.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold and Unsold 07072022.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 27062022.pdf27 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 04042022.pdf6 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 05042022.pdf6 Apr 2022
CERSAI detailsFile: CERSAI PRIMUS 31032022.pdf6 Apr 2022
Disclosure of sold/ booked inventoryFile: CERSAI PRIMUS 31032022.pdf6 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold and Unsold 06042022.pdf6 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HIGHPARK PROJECT PRIMUS.pdf8 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 HIGHPARK PROJECT PRIMUS.pdf8 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 25022022 NEW FORMAT.pdf26 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 28012022.pdf28 Jan 2022
CERSAI detailsFile: Aaradhya Primus CERSAI 15012022.pdf28 Jan 2022
Disclosure of sold/ booked inventoryFile: Sold and Unsold 05012022.pdf5 Jan 2022
CERSAI detailsFile: CERSAI-Sept-2021.pdf10 Dec 2021
Layout approvalFile: Approved Layout 25082021.pdf2 Dec 2021
Layout approvalFile: Proforma Approved Layout 25082021.pdf2 Dec 2021
Copy of the legal title reportFile: RERA Title Report.pdf2 Dec 2021
Copy of Layout Approval (in case of layout)File: Proforma Approved Layout 25082021.pdf2 Dec 2021
Copy of Layout Approval (in case of layout)File: Approved Layout 25082021.pdf2 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: FULL CC 25082021.pdf2 Dec 2021
Declaration about Commencement CertificateFile: Format D Declaration for CC UDCPR.pdf2 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 18112021.pdf2 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 24112021.pdf2 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 08102021.pdf12 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 01102021.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 08102021.pdf9 Oct 2021
Details of encumbrancesFile: CERSAI Sept 2021.pdf6 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold and Unsold Spet 2021.pdf6 Oct 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Name Reservation.pdf31 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT Aug-2021.pdf27 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Aug-2021.pdf27 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Aug-2021.pdf27 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062021.pdf13 Aug 2021
Details of encumbrancesFile: CERSAI Report - Edelweiss.pdf11 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold 30062021.pdf13 Jul 2021
Declaration about Commencement CertificateFile: Declaration Format D and CC.pdf18 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032021.pdf12 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31032021.pdf12 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31032021.pdf12 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31032021.pdf12 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31032021.pdf12 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 31032021.pdf12 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 31032021.pdf12 Jun 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory as on 31032021.pdf11 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 11052021.pdf13 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30092020.pdf27 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30092020.pdf27 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 30092020.pdf27 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092020.pdf27 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062020.pdf28 Sep 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 17092020.pdf18 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 17092020.pdf18 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 17092020.pdf18 Sep 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 06072020.pdf29 Jul 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 0607202.pdf29 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 06072020.pdf29 Jul 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032020.pdf27 Jul 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 31032020.pdf27 Jul 2020
Details of Restarting of Construction work post lockdownFile: LOCKDOWN DETAILS.pdf17 Jun 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 18022020.pdf26 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 18022020.pdf26 Feb 2020

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARADHYA PRIMUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SINGAPORE INTERNATIONAL SCHOOL7,600+ in Thane

2 kmAARADHYA PRIMUSCompleted 38Lapsed / revoked 30Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: MAN VASTUCON LLP

MAN VASTUCON LLP has 6 registrations on MahaRERA, including AARADHYA HIGHPARK - PROJECT 1 OF PHASE I and AARADHYA HIGHPARK - PROJECT 2 OF PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AARADHYA PRIMUS is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARADHYA PRIMUS?

The registered promoter entity is MAN VASTUCON LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARADHYA PRIMUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AARADHYA PRIMUS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARADHYA PRIMUS?

The professionals named in the filing: Architect: DISHA DESIGN CONSULTANTS; Engineer: RAVINDRA YEVALE; Chartered Accountant: HEMAN CHHEDA AND CO; Chartered Accountant: M A PARIKH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARADHYA PRIMUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARADHYA PRIMUS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARADHYA PRIMUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.