ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / AARADHYA PARKWOOD 2

Registered No litigation declared Residential / Group Housing project

AARADHYA PARKWOOD 2

By MAN VASTUCON LLP

RG-MH-18514 · RERA P51700077424 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 93.61 crore secured on the land, in favour of IndusInd bank limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 65%
54 of 455Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

AARADHYA PARKWOOD 2 is a Residential / Group Housing project by MAN VASTUCON LLP in Thane, Maharashtra, registered with MahaRERA as P51700077424 on 13 Aug 2024. Possession is promised by 31 Dec 2028. 401 of the 455 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameAARADHYA PARKWOOD 2
  • TypeResidential / Group Housing
  • Location
    • WESTERN EXPRESS HIGHWAY
    • NEAR SINGAPORE INTERNATIONAL SCHOOL
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077424
  • ReraGenie IDRG-MH-18514

Builder

  • NameMAN VASTUCON LLP
  • Entity typeOthers
  • GSTIN27ACRFS8663E1ZG
  • Named personMAN INFRACONSTRUCTION LIMITED
  • Designated PartnersAYUSH SHAH, VISHANT SHAH
  • Other registrations5 more →
  • Completed4 of 6

Key dates

this monthRegisteredAug 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Aug 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed83 files

Current status

88%401 of 455 units booked
20.8%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1 ASTERNA40382150215
TOWER 2 BLUNA40382400240

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 65%.

TOWER 1 ASTER55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
TOWER 2 BLU59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises14%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks43%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed336

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots336
Closed/Covered336
BuildingClosed/CoveredTotal
TOWER 1 ASTER168168
TOWER 2 BLU168168

Land and ownership4

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area10,509 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared present
Charge in favour ofIndusInd bank limited
Secured amountRs 93.61 crore
CERSAI search filedYes
Declared on11 Feb 2026
LandownerVillageDistrict
LION PENCILS LIMITEDChemburMumbai Suburban
GOAN HOTELS AND REALTY PRIVATE LIMITEDChemburMumbai Suburban
HORIZONTAL VENTURES PRIVATE LIMITEDChemburMumbai Suburban
EVERSMILE CONSTRUCTION COMPANY PRIVATE LIMITEDChemburMumbai Suburban

Approvals and building plan

Sanctioning authorityMira Bhaindar Municipal Corporation
Permissible FSI31574.72
Proposed, not sanctioned31,575 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHATKOPAR EAST MUMBAI 400077
Estimated costRs 199.31 cr
Cost incurredRs 41.52 cr
Work done20.83%
BuildingWingEstimatedIncurred
TOWER 1 ASTERNARs 94.74 crRs 19.66 cr
TOWER 2 BLUNARs 85.67 crRs 21.86 cr
-NARs 18.91 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDISHA DESIGN CONSULTANT
EngineerAmit
Chartered AccountantManisha
Chartered AccountantM A Parikh Shah & Associates LLP
PartnerRole in project
MAN VASTUCON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 31032026.pdf15 Apr 2026
Withdrawal Update Form 2File: FORM 2 APW2 31032025.pdf15 Apr 2026
Withdrawal Update Form 3File: FORM 3 APW2 31032025.pdf15 Apr 2026
Form 2A (FY 2025-2026)File: FORM 2A 31032026.pdf15 Apr 2026
Withdrawal Update Form 1File: FORM 1 31122025.pdf14 Jan 2026
Withdrawal Update Form 2File: FORM 2 APW2 31032025.pdf14 Jan 2026
Withdrawal Update Form 3File: FORM 3 APW2 31032025.pdf14 Jan 2026
Withdrawal Update Form 1File: FORM 1 APW 2 30092025.pdf9 Oct 2025
Withdrawal Update Form 2File: FORM 2 APW2 31032025.pdf9 Oct 2025
Withdrawal Update Form 3File: FORM 3 APW2 31032025.pdf9 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 FY 2425.pdf29 Sep 2025
Withdrawal Update Form 1File: FORM 1 Aaradhya Parkwood 2.pdf19 Jul 2025
Withdrawal Update Form 2File: FORM 2 APW2 31032025.pdf19 Jul 2025
Withdrawal Update Form 3File: FORM 3 APW2 31032025.pdf19 Jul 2025
Form 1File: FORM 1 31032025.pdf20 Jun 2025
Form 2File: FORM 2 APW2 31032025.pdf20 Jun 2025
Form 3File: FORM 3 APW2 31032025.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold 31032025.pdf20 Jun 2025
Withdrawal Update Form 1File: FORM 1 31032025.pdf18 Jun 2025
Withdrawal Update Form 2File: FORM 2 APW2 31032025.pdf18 Jun 2025
Withdrawal Update Form 3File: FORM 3 APW2 31032025.pdf18 Jun 2025
Withdrawal Update Form 1File: FORM 1 31032025.pdf4 Jun 2025
Withdrawal Update Form 2File: FORM 2 APW2 31032025.pdf4 Jun 2025
Withdrawal Update Form 3File: FORM 3 APW2 31032025.pdf4 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31032025.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold 31032025.pdf16 Apr 2025
CERSAI detailsFile: CERSAI 31032025.pdf16 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 31032025.pdf16 Apr 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrances APW Srvy No 260 Updated 18012025.pdf20 Jan 2025
Details of encumbrances concerned to LegalFile: Financial Encumbrances APW Srvy No 260 Updated 18012025.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31122024.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold 31122024.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30092024.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold and unsold AARADHYA PARKWOOD 2 30092024.pdf19 Oct 2024
CERSAI detailsFile: CERSAI 30092024.pdf19 Oct 2024
Copy of the legal title reportFile: MahaRERA Format A Circular No 28 2021 Property at Mahajanwadi 07082024 c.pdf7 Aug 2024
Other - TechnicalFile: Declaration Cum Undertaking in Annexure A MahaRERA Qry 02072024.pdf23 Jul 2024
CERSAI detailsFile: Self Declaration on CERSAI Report MahaRERA Qry 28062024.pdf22 Jul 2024
Other - LegalFile: Self Declaration DTD 04072024 iro LOPs Area Share and Revenue Share MahaRERA Qry 28062024.6 Jul 2024
Other - FinanceFile: Self Declaration DTD 04072024 iro LOPs Area Share and Revenue Share MahaRERA Qry 28062024.6 Jul 2024
Other - TechnicalFile: Self Declaration DTD 04072024 iro LOPs Area Share and Revenue Share MahaRERA Qry 28062024.6 Jul 2024
Details of encumbrances concerned to FinanceFile: Declaration of Financial Encumbrances Revised MahaRERA Qry 28062024.pdf4 Jul 2024
Details of encumbrances concerned to LegalFile: Declaration of Financial Encumbrances Revised MahaRERA Qry 28062024.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 REVISED.pdf4 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Signed Partners Disclosure RERA Order No 39 by Promoter Revised MahaRERA Qry 29062024.pdf4 Jul 2024
Proforma of Agreement for saleFile: APW2 T1 T2 MODEL AFS FINAL BY DD 17062024 Revised MahaRERA Qry 29062024.pdf4 Jul 2024
CERSAI detailsFile: CERSAI 27062024.pdf27 Jun 2024
Layout approvalFile: CC LAYOUT 18052022.pdf19 Jun 2024
Building plan approvalFile: 17.pdf19 Jun 2024
Building plan approvalFile: 18.pdf19 Jun 2024
Building plan approvalFile: 19.pdf19 Jun 2024
Building plan approvalFile: 20.pdf19 Jun 2024
Building plan approvalFile: 21.pdf19 Jun 2024
Building plan approvalFile: 22.pdf19 Jun 2024
Building plan approvalFile: 23.pdf19 Jun 2024
Building plan approvalFile: 26.pdf19 Jun 2024
Building plan approvalFile: 27.pdf19 Jun 2024
Building plan approvalFile: 28.pdf19 Jun 2024
Details of encumbrances concerned to FinanceFile: APW Declaration No Encumbrances LEGAL 18062024.pdf19 Jun 2024
Details of encumbrances concerned to LegalFile: APW Declaration No Encumbrances LEGAL 18062024.pdf19 Jun 2024
Copy of Layout Approval (in case of layout)File: CC LAYOUT 18052022.pdf19 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 17.pdf19 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 18.pdf19 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 19.pdf19 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 20.pdf19 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 21.pdf19 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 22.pdf19 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 23.pdf19 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 26.pdf19 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 27.pdf19 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 28.pdf19 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Further CC 29082023 Phase 2.pdf19 Jun 2024
Declaration about Commencement CertificateFile: APW2 T1 T2 Format D Declaration CC dt 29082023.pdf19 Jun 2024
Declaration in FORM BFile: APW2 T1 T2 Notarised Dt 19062024 Form B Declaration from MVLLP.pdf19 Jun 2024
Proforma of Allotment letterFile: Allotment Letter Aaradhya Parkwood 2.pdf19 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: APW2 T1T2 MVLLP Declaration Dt 18062024 abt Separate Bank Accounts 70 Percent.pdf19 Jun 2024
Deviation Report with respect to Allotment letterFile: Allotment Letter Aaradhya Parkwood 2 DEVIATION REPORT 19062024.pdf19 Jun 2024
Deviation Report with respect to model copy of AgreementFile: APW2 T1 T2 MODEL AFS DEVIATION REPORT 19062024.pdf19 Jun 2024

How this compares with Thane

88%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARADHYA PARKWOOD 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SINGAPORE INTERNATIONAL SCHOOL7,600+ in Thane

2 kmAARADHYA PARKWOOD 2Completed 17Lapsed / revoked 13Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 65 registered projects within 2 km.

Builder: MAN VASTUCON LLP

MAN VASTUCON LLP has 6 registrations on MahaRERA, including AARADHYA HIGHPARK - PROJECT 1 OF PHASE I and AARADHYA HIGHPARK - PROJECT 2 OF PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AARADHYA PARKWOOD 2 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARADHYA PARKWOOD 2?

The registered promoter entity is MAN VASTUCON LLP, an others as per the filing. Its GSTIN 27ACRFS8663E1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARADHYA PARKWOOD 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AARADHYA PARKWOOD 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARADHYA PARKWOOD 2?

The professionals named in the filing: Architect: DISHA DESIGN CONSULTANT; Engineer: Amit; Chartered Accountant: Manisha; Chartered Accountant: M A Parikh Shah & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARADHYA PARKWOOD 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARADHYA PARKWOOD 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARADHYA PARKWOOD 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.