Completed No litigation declared Residential / Group Housing project

AARADHYA NINE

By MICL REALTY LLP

RG-MH-08301 · RERA P51800000229 · Last updated on MahaRERA portal: 22 Jun 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2021Possession promisedregistration recorded completed
40 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

AARADHYA NINE is a Residential / Group Housing project by MICL REALTY LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000229 on 10 Jul 2017. The registration is recorded completed; possession was promised by 30 Mar 2021.

At a glance

Project

  • NameAARADHYA NINE
  • TypeResidential / Group Housing
  • Location
    • PANT NAGAR
    • GHATKOPAR EAST
    • Kurla
    • Mumbai Suburban
    • 400075
  • Pincode400075
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800000229
  • ReraGenie IDRG-MH-08301

Builder

  • NameMICL REALTY LLP
  • Entity typeOthers
  • Named personsMAN INFRACONSTRUCTION LIMITED, VIRAL JITENDRA BHADRA, NEMIN VIRENDRA VORA

Key dates

this monthRegisteredJul 2017PromisedMar 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Jul 2017
  • Promised completion30 Mar 2021
  • Revised completionNone
  • Buildings4 building records
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA180000
WING BNA180000
WING CNA180000
WING DNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 22 Jun 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 22 Jun 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
FITNESS CENTER AT TERRACE OF WING A AND BYes100%
RECREATION AREA AT TERRACE OF WING A AND BYes100%

Parking filed154

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots154
Closed/Covered154
BuildingClosed/CoveredTotal
WING A3939
WING B5757
WING C2929
WING D2929

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,462 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI16001.0
Proposed, not sanctioned15,796 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHATKOPAR EAST, MUMBAI 400077

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHITECTURE PLUS
EngineerRAVINDRA YEVALE
Chartered AccountantSHAPARIA MEHTA AND ASSOCIATES LLP
Chartered AccountantB P SANGHANI AND ASSOCIATES
PartnerRole in project
MICL REALTY LLP-

Litigation declared1

CaseCourtStatus
938/2018High Court BombayDisposed off

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jun 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Dec 2019

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Aaradhya Nine Society Formation C and D Wing.pdf22 Jun 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Association of Society Aaradhya Nine.pdf22 Jun 2021
Certificates of CA (Form 5)File: Form 5 31032020.pdf15 Jul 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf24 Jun 2020
Details of encumbrancesFile: No Encumbarance 13 April 2020.pdf13 May 2020
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 10122019.pdf13 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 25092019.pdf6 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf4 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf4 Dec 2019
Certificates of CA (Form 3)File: Form 3 30062019.pdf5 Sep 2019
Certificates of CA (Form 5)File: Form 5 as on 31032019.pdf4 Jun 2019
Certificates of CA (Form 3)File: CA Certificate Form 3 31032019.pdf31 May 2019
Form 2AFile: Form 2A.pdf2 Feb 2019
Certificates of CA (Form 3)File: Form 3.pdf2 Feb 2019
OtherFile: Disclosure on project professionals.pdf2 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: FINAL FULL CC 26092018.pdf1 Oct 2018
Details of encumbrancesFile: Details of Encumbrances-MICL Realty LLP.pdf4 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: Further CC 15062018.pdf18 Jun 2018
Certificates of CA (Form 5)File: Form 5 2017 2018.pdf8 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Certificate.pdf9 May 2018
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf9 May 2018
Layout approvalFile: AARADHYA NINE PAGE ONE.pdf20 Feb 2018
Layout approvalFile: ARADHYA NINE PAGE TWO.pdf20 Feb 2018
Layout approvalFile: AARADHYA NINE PAGE THREE.pdf20 Feb 2018
Layout approvalFile: AARADHYA NINE PAGE FOUR.pdf20 Feb 2018
Layout approvalFile: AARADHYA NINE PAGE FIVE.pdf20 Feb 2018
Copy of Layout Approval (in case of layout)File: AARADHYA NINE PAGE ONE.pdf20 Feb 2018
Copy of Layout Approval (in case of layout)File: ARADHYA NINE PAGE TWO.pdf20 Feb 2018
Copy of Layout Approval (in case of layout)File: AARADHYA NINE PAGE THREE.pdf20 Feb 2018
Copy of Layout Approval (in case of layout)File: AARADHYA NINE PAGE FOUR.pdf20 Feb 2018
Copy of Layout Approval (in case of layout)File: AARADHYA NINE PAGE FIVE.pdf20 Feb 2018
Proforma of Allotment letterFile: Draft RERA Agreement- Aaradhya Nine (2).pdf20 Feb 2018
Proforma of Allotment letterFile: Draft RERA- Allotment Letter- Aaradhya Nine.pdf20 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate MICL Realty.pdf12 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf22 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf22 Jan 2018
Certificates of CA (Form 3)File: Form 3.pdf22 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf18 Aug 2017
Layout approvalFile: Letter.pdf4 Jul 2017
Layout approvalFile: Performa A.pdf4 Jul 2017
Layout approvalFile: Drawing Page 1 With Performa A.pdf4 Jul 2017
Layout approvalFile: Drawing Page 2.pdf4 Jul 2017
Layout approvalFile: Drawing Page 3.pdf4 Jul 2017
Layout approvalFile: Drawing Page 4.pdf4 Jul 2017
Layout approvalFile: Drawing Page 5.pdf4 Jul 2017
Layout approvalFile: Drawing Page 6.pdf4 Jul 2017
Layout approvalFile: Drawing Page 7.pdf4 Jul 2017
Copy of Layout Approval (in case of layout)File: Letter.pdf4 Jul 2017
Copy of Layout Approval (in case of layout)File: Performa A.pdf4 Jul 2017
Copy of Layout Approval (in case of layout)File: Drawing Page 1 With Performa A.pdf4 Jul 2017
Copy of Layout Approval (in case of layout)File: Drawing Page 2.pdf4 Jul 2017
Copy of Layout Approval (in case of layout)File: Drawing Page 3.pdf4 Jul 2017
Copy of Layout Approval (in case of layout)File: Drawing Page 4.pdf4 Jul 2017
Copy of Layout Approval (in case of layout)File: Drawing Page 5.pdf4 Jul 2017
Copy of Layout Approval (in case of layout)File: Drawing Page 6.pdf4 Jul 2017
Copy of Layout Approval (in case of layout)File: Drawing Page 7.pdf4 Jul 2017
Certificates of CA (Form 3)File: Form 3- CA Certificate.pdf30 Jun 2017
Proforma of Allotment letterFile: Proforma Allotment Letter and Agreement for Sale-Aaradhya Nine.pdf30 Jun 2017
Building plan approvalFile: IOD Part 1.pdf27 Jun 2017
Building plan approvalFile: IOD- Part 2.pdf27 Jun 2017
Details of encumbrancesFile: Declaration on No Encumbrance.pdf27 Jun 2017
Building Plan Approval (IOD)File: IOD Part 1.pdf27 Jun 2017
Building Plan Approval (IOD)File: IOD- Part 2.pdf27 Jun 2017
Declaration in FORM BFile: FORM B.pdf27 Jun 2017
PAN CardFile: PAN CARD - MICL REALTY.pdf22 Jun 2017
Copy of the legal title reportFile: Title Report and Index II.pdf22 Jun 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARADHYA NINE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR EAST6,700+ in Mumbai Suburban

2 kmAARADHYA NINECompleted 118Lapsed / revoked 69Other 113Dot size: filed unitsN

Filed coordinates, straight-line distance. 300 registered projects within 2 km.

Builder: MICL REALTY LLP

MICL REALTY LLP has 1 registration on MahaRERA, including AARADHYA NINE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if AARADHYA NINE is delayed beyond 30 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARADHYA NINE?

The registered promoter entity is MICL REALTY LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARADHYA NINE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AARADHYA NINE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARADHYA NINE?

The professionals named in the filing: Architect: ARCHITECTURE PLUS; Engineer: RAVINDRA YEVALE; Chartered Accountant: SHAPARIA MEHTA AND ASSOCIATES LLP; Chartered Accountant: B P SANGHANI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARADHYA NINE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARADHYA NINE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARADHYA NINE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.