Completed No litigation declared Residential / Group Housing project

AARADHYA HIGHPARK PROJECT III of PHASE 1

By MAN VASTUCON LLP

RG-MH-30530 · RERA P51700030611 · Last updated on MahaRERA portal: 19 Jul 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
14 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 95%
2Complaints at MahaRERAon this registration
Jump to the 332 documents Report an error

AARADHYA HIGHPARK PROJECT III of PHASE 1 is a Residential / Group Housing project by MAN VASTUCON LLP in Thane, Maharashtra, registered with MahaRERA as P51700030611 on 2 Sep 2021. The registration is recorded completed; possession was promised by 31 Dec 2025. 2 complaints are on record with the regulator.

At a glance

Project

  • NameAARADHYA HIGHPARK PROJECT III of PHASE 1
  • TypeResidential / Group Housing
  • Location
    • WESTERN EXPRESS HIGHWAY
    • NEAR SINGAPORE INTERNATIONAL SCHOOL
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700030611
  • ReraGenie IDRG-MH-30530

Builder

  • NameMAN VASTUCON LLP
  • Entity typeOthers
  • Named personsSUKETU P SHAH, MAN INFRACONSTRUCTION LIMITED
  • Other registrations5 more →
  • Completed4 of 6

Key dates

this monthRegisteredSep 2021PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Sep 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed332 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ELMNA350000
FIRNA350000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.

ELM95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
FIR95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 19 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed231

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots231
Closed/Covered231
BuildingClosed/CoveredTotal
ELM115115
FIR116116

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,420 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
GOAN HOTELS & REALTY PVT. LTDBorivaliMumbai Suburban
HORIZONTAL REALTY & AVIATION PVT LTDBorivaliMumbai Suburban
EVERSMILE CONSTRUCTION CO PVT LTDBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI32300.0
Proposed, not sanctioned32,300 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHATKOPAR EAST 400077

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
MAN VASTUCON LLP-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000375382MAN VASTUCON LLPKAVITA SINGH27/04/2023
CC006000000385418MAN VASTUCON LLPKavita Singh27/04/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Mar 2024

Documents filed332

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 332 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: Financial Encumbrances AHP Wing E and F Updated July 2024.pdf19 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC E and F 12032024.pdf22 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 15032024.pdf22 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 28012024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 30012024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 31012024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 02022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 05022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 06022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 07022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 08022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 09022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 12022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 13022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 14022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 15022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 16022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 20022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 21022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 22022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 23022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 24012024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 25012024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 26022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 27022024.pdf7 Mar 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 01012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 02012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 03012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 04012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 05012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 08012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 09012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 10012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 11012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 12012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 15012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 16012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 17012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 18012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 19012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 22012024.pdf25 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 01122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 06122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 07122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 08122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 11122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 12122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 13122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 14122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 18122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 20122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 21122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 22122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 26122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 27122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 28122023.pdf24 Jan 2024
Other - FinanceFile: Rqst Ltr for Withdrawal 29122023.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31122023.pdf20 Jan 2024
CERSAI detailsFile: CERSAI 02102023.pdf20 Jan 2024
CERSAI detailsFile: CERSAI 20012024.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD INVENTORY 31122023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30092023.pdf28 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30092023.pdf28 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 30102023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 31102023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 01112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 02112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 08112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 09112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 10112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 16112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 17112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 20112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 21112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 22112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 23112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 24112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 28112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 29112023.pdf6 Dec 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 30112023.pdf6 Dec 2023

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARADHYA HIGHPARK PROJECT III of PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SINGAPORE INTERNATIONAL SCHOOL7,600+ in Thane

2 kmAARADHYA HIGHPARK PROJECCompleted 20Lapsed / revoked 17Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 77 registered projects within 2 km.

Builder: MAN VASTUCON LLP

MAN VASTUCON LLP has 6 registrations on MahaRERA, including AARADHYA HIGHPARK - PROJECT 1 OF PHASE I and AARADHYA HIGHPARK - PROJECT 2 OF PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AARADHYA HIGHPARK PROJECT III of PHASE 1 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARADHYA HIGHPARK PROJECT III of PHASE 1?

The registered promoter entity is MAN VASTUCON LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARADHYA HIGHPARK PROJECT III of PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AARADHYA HIGHPARK PROJECT III of PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AARADHYA HIGHPARK PROJECT III of PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in AARADHYA HIGHPARK PROJECT III of PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARADHYA HIGHPARK PROJECT III of PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARADHYA HIGHPARK PROJECT III of PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.