ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / AARADHYA HIGHPARK - PROJECT 2 OF PHASE I

Completed No litigation declared Residential / Group Housing project

AARADHYA HIGHPARK - PROJECT 2 OF PHASE I

By MAN VASTUCON LLP

RG-MH-81134 · RERA P51700018244 · Last updated on MahaRERA portal: 13 Jul 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

AARADHYA HIGHPARK - PROJECT 2 OF PHASE I is a Residential / Group Housing project by MAN VASTUCON LLP in Thane, Maharashtra, registered with MahaRERA as P51700018244 on 16 Oct 2018. The registration is recorded completed; possession was promised by 30 Mar 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAARADHYA HIGHPARK - PROJECT 2 OF PHASE I
  • TypeResidential / Group Housing
  • Location
    • WESTERN EXPRESS HIGHWAY
    • NEAR SINGAPORE INTERNATIONAL SCHOOL
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700018244
  • ReraGenie IDRG-MH-81134

Builder

  • NameMAN VASTUCON LLP
  • Entity typeOthers
  • Named personsSUKETU P SHAH, MAN INFRACONSTRUCTION LIMITED
  • Other registrations5 more →
  • Completed4 of 6

Key dates

this monthRegisteredOct 2018PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Oct 2018
  • Promised completion30 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed151 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING DNA350000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

WING D: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed144

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots144
Closed/Covered144

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area528 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
GOAN HOTELS & REALTY PRIVATE LIMITEDBorivaliMumbai Suburban
HORIZONTAL REALTY AND AVIATION PRIVATE LIMITEDBorivaliMumbai Suburban
EVERSMILE CONSTRUCTION COMPANY PRIVATE LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI10000.0
Proposed, not sanctioned9,718 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHATKOPAR EAST MUMBAI

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDISHA DESIGN CONSULTANTS
PartnerRole in project
MAN VASTUCON LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000292859MAN VASTUCON LLPRanjeet Lalaram Malaviya27/09/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Nov 2022

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY202223.pdf13 Jul 2023
Details of encumbrancesFile: Declaration of No Financial Encumbrances Wing D of AHP 20042023.pdf20 Apr 2023
Details of encumbrancesFile: Financial Encumbrances AHP Srvy No 92 Updated Dt 05012023.pdf6 Jan 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 30122022.pdf5 Jan 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 04012023.pdf5 Jan 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 05012023.pdf5 Jan 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 26122022.pdf29 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 27122022.pdf29 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 28122022.pdf29 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 22122022.pdf23 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 20122022.pdf20 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 12122022.pdf19 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 14122022.pdf19 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 16122022.pdf19 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 17122022.pdf19 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 03122022.pdf10 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 08122022.pdf10 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 05122022.pdf10 Dec 2022
Details of encumbrancesFile: Financial Encumbrances AHP Srvy No 92 Updated Dec 2022.pdf2 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 28112022.pdf2 Dec 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 02122022.pdf2 Dec 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION CERTIFICATE DURIAN.pdf1 Dec 2022
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf30 Nov 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 25112022.pdf25 Nov 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 22112022.pdf24 Nov 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 23112022.pdf24 Nov 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 24112022.pdf24 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Dated 09112022.pdf23 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Corrigendum of OC Dated 18112022.pdf23 Nov 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 21112022.pdf21 Nov 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 17112022.pdf18 Nov 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 18112022.pdf18 Nov 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 16112022.pdf17 Nov 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 11112022.pdf16 Nov 2022
Details of encumbrancesFile: Financial Encumbrances AHP Srvy No 92 Updated 02112022.pdf3 Nov 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 01112022.pdf1 Nov 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 27102022.pdf28 Oct 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 18102022.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 12102022 AHP Project 2 Phase I.pdf19 Oct 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 14102022.pdf14 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 27062022.pdf13 Oct 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 12102022.pdf13 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold and Unsold 30092022.pdf10 Oct 2022
CERSAI detailsFile: CERSAI 04102022.pdf10 Oct 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 03102022.PDF7 Oct 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 07102022.pdf7 Oct 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 29092022.pdf29 Sep 2022
Details of encumbrances concerned to LegalFile: AHP Declaration No Encumbrances LEGAL Project 2 Phs I.pdf28 Sep 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 26092022.pdf27 Sep 2022
Details of encumbrancesFile: Encumbrances AHP Sr No 92 ECLFL Assignment to EHFL on 20092022.pdf26 Sep 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 19092022.pdf19 Sep 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 15092022.pdf17 Sep 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 14092022.pdf15 Sep 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 12092022.pdf12 Sep 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 08092022.pdf9 Sep 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 29082022.pdf6 Sep 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 30082022.pdf6 Sep 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 05092022.pdf6 Sep 2022
Other - FinanceFile: Rqst Ltr for Withdrawal 06092022.pdf6 Sep 2022
Other - FinanceFile: Bank Application 18082022.pdf26 Aug 2022
Other - FinanceFile: Bank Application 20082022.pdf26 Aug 2022
Other - FinanceFile: Bank Application 23082022.pdf26 Aug 2022
Other - FinanceFile: Bank Application 24082022.pdf26 Aug 2022
Other - FinanceFile: Rqst Ltr for Withdrawal Project 2 of Phase I.pdf26 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 07072022.pdf7 Jul 2022
CERSAI detailsFile: CERSAI 07072022.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold and Unsold 07072022.pdf7 Jul 2022
Certificates of CA (Form 3)File: FORM 3 27062022.pdf27 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 16062022.pdf16 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 04042022.pdf6 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 05042022.pdf6 Apr 2022
CERSAI detailsFile: CERSAI 31032022.pdf6 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold and Unsold 06042022.pdf6 Apr 2022
Details of encumbrancesFile: Encumbrance MVLLP Project 2.pdf15 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DURIAN CHS Ltd NAME correction Approved Letter.pdf11 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HIGHPARK PROJECT 2.pdf8 Mar 2022
Certificates of CA (Form 3)File: Form 3 HIGHPARK PROJECT 2.pdf8 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 25022022 NEW FORMAT.pdf26 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 28012022.pdf28 Jan 2022
CERSAI detailsFile: AHP Project 02 CERSAI 15012022.pdf28 Jan 2022

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARADHYA HIGHPARK - PROJECT 2 OF PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SINGAPORE INTERNATIONAL SCHOOL7,600+ in Thane

2 kmAARADHYA HIGHPARK - PROJCompleted 19Lapsed / revoked 17Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 77 registered projects within 2 km.

Builder: MAN VASTUCON LLP

MAN VASTUCON LLP has 6 registrations on MahaRERA, including AARADHYA HIGHPARK - PROJECT 1 OF PHASE I and AARADHYA HIGHPARK - PROJECT 2 OF PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AARADHYA HIGHPARK - PROJECT 2 OF PHASE I is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARADHYA HIGHPARK - PROJECT 2 OF PHASE I?

The registered promoter entity is MAN VASTUCON LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARADHYA HIGHPARK - PROJECT 2 OF PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AARADHYA HIGHPARK - PROJECT 2 OF PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AARADHYA HIGHPARK - PROJECT 2 OF PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARADHYA HIGHPARK - PROJECT 2 OF PHASE I?

The professionals named in the filing: Architect: DISHA DESIGN CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARADHYA HIGHPARK - PROJECT 2 OF PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARADHYA HIGHPARK - PROJECT 2 OF PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARADHYA HIGHPARK - PROJECT 2 OF PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.