Registered No litigation declared Residential / Group Housing project

Aakruti Solitaire

By Saptrishi Classic LLP

RG-MH-18353 · RERA P51800056319 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 35.00 crore secured on the land, in favour of AU SMALL FINANCE BANK
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Feb 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 76%
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Aakruti Solitaire is a Residential / Group Housing project by Saptrishi Classic LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056319 on 29 May 2024. Possession is promised by 1 Feb 2027.

At a glance

Project

  • NameAakruti Solitaire
  • TypeResidential / Group Housing
  • Location
    • Pantnagar
    • Ghatkopar east
    • Ghatkopar
    • Kurla
    • Mumbai Suburban
    • 400075
  • Pincode400075
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800056319
  • ReraGenie IDRG-MH-18353

Builder

  • NameSaptrishi Classic LLP
  • Entity typePartnership
  • PartnersDinesh Haribhai Dodia, Jatin Mathuradas Shah, Amit Avinash Parab, Vital Vijay Takatrao

Key dates

this monthRegisteredMay 2024PromisedFeb 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 May 2024
  • Promised completion1 Feb 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

53.0%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Aakruti SolitaireNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 76%.

Aakruti Solitaire: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure76%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises22%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.4%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area920 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAU SMALL FINANCE BANK
Secured amountRs 35.00 crore
CERSAI search filedYes
Declared on23 Sep 2025
LandownerVillageDistrict
Pant Nagar Shrama Safalya CHSLGhatkoparMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI8073.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 16 GROUND FLOOR 5TH FLOOR UNIT NO 21 22 23 40 41 KANAKIA ZILLION JUNCTION OF CTS ROAD LBS MA
Estimated costRs 35.99 cr
Cost incurredRs 19.06 cr
Work done52.96%
BuildingWingEstimatedIncurred
Aakruti SolitaireNARs 32.39 crRs 19.06 cr
-NARs 3.60 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmit Parab
EngineerParas Consultants
EngineerRAJESH PATIL
Chartered AccountantMamta Sheth and Associates
Chartered AccountantK R DHOLU AND ASSOCIATES
PartnerRole in project
Saptrishi Classic LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Feb 2027

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 Saptirshi.pdf17 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A Saptrishi Classic LLP 2025 2026.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 Q4 CLASSIC.pdf14 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4 CLASSIC.pdf14 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q4 CLASSIC.pdf14 Apr 2026
Building plan approvalFile: APPROVED PLAN DECEMBER 24 Compressed.pdf18 Mar 2026
Withdrawal Update Form 1File: FORM-1 Saptrishi Classic Q2.pdf18 Mar 2026
Withdrawal Update Form 1File: FORM 1 Saptrishi Classic Q3.pdf18 Mar 2026
Withdrawal Update Form 1File: FORM 1 Saptrishi Classic Q3.pdf18 Mar 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE 86 FORM-2 Q2.pdf18 Mar 2026
Withdrawal Update Form 2File: Form 2 Saptrishi Classic Q3.pdf18 Mar 2026
Withdrawal Update Form 2File: Form 2 Saptrishi Classic Q3.pdf18 Mar 2026
Withdrawal Update Form 3File: FORM 3 SAPTRISHI CLASSIC - Q2.pdf18 Mar 2026
Withdrawal Update Form 3File: FORM 3 SAPTRISHI CLASSIC - Q2.pdf18 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf18 Mar 2026
Form 5 (FY 2024-2025)File: SAPTARSHI CLASSICA LLP ANNUAL REPORT.pdf18 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - 15-04-2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_86.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_REVISED.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: BLDG NO 86 SOLD UNSOLD LIST.pdf19 Apr 2025
Proforma of Agreement for saleFile: Final AFS Bldg 86 updated 10022025.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE SAPTRISHI CLASSIC LLP 17 01 2025.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory Q3 SAPTRISHI 31 12 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 Architect Certificate Q3 SAPTRISHI.pdf17 Jan 2025
Proforma of Agreement for saleFile: Final AFS Bldg 86 1408 REVISED 19-12-2024.pdf19 Dec 2024
Details of encumbrances concerned to FinanceFile: RERA ENCUMBRANCE FOR PROJECT AAKRUTI SOLITAIRE -86.pdf28 Nov 2024
Details of encumbrances concerned to LegalFile: RERA ENCUMBRANCE FOR PROJECT AAKRUTI SOLITAIRE -86.pdf28 Nov 2024
Proforma of Agreement for saleFile: AFS 86 DRAFT AGREEMENT S-compressed.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAPTARISHI ARCHITECT CERTIFICATE[1].pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECH CERTIFICATE.pdf16 Jul 2024
Other - LegalFile: DA_2019_compressed.pdf24 May 2024
Other - LegalFile: DA 1.pdf24 May 2024
Other - LegalFile: DA 2.pdf24 May 2024
Other - LegalFile: DA 3.pdf24 May 2024
Other - LegalFile: DA 4.pdf24 May 2024
Other - LegalFile: DA 5.pdf24 May 2024
Other - LegalFile: DA 6.pdf24 May 2024
Other - LegalFile: DA 7.pdf24 May 2024
Other - LegalFile: DA 8.pdf24 May 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING.pdf22 May 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER 86.pdf18 May 2024
Proforma of Agreement for saleFile: AFS.pdf18 May 2024
Layout approvalFile: IOA PLAN-86-SHRAMA SAFALYA_1_11zon.pdf17 May 2024
Building plan approvalFile: IOA PLAN-86-SHRAMA SAFALYA_1_11zon.pdf17 May 2024
PAN CardFile: PAN Card Saptrishi Classic LLP.pdf17 May 2024
Copy of the legal title reportFile: TITEL REPORT ANNEXURE A_compressed.pdf17 May 2024
Details of encumbrances concerned to FinanceFile: DECLARATION NO ENCUMBRANCES CONCERNED TO FINANCE.pdf17 May 2024
Details of encumbrances concerned to FinanceFile: DECLARATION NO ENCUMBRANCES CONCERNED LEGAL.pdf17 May 2024
Details of encumbrances concerned to LegalFile: DECLARATION NO ENCUMBRANCES CONCERNED TO FINANCE.pdf17 May 2024
Details of encumbrances concerned to LegalFile: DECLARATION NO ENCUMBRANCES CONCERNED LEGAL.pdf17 May 2024
Copy of Layout Approval (in case of layout)File: IOA PLAN-86-SHRAMA SAFALYA_1_11zon.pdf17 May 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA PLAN-86-SHRAMA SAFALYA_1_11zon.pdf17 May 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE BLDG NO86.pdf17 May 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf17 May 2024
Declaration in FORM BFile: FORM B AFFIDAVIT CUM DECLARTION PARTNER.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf17 May 2024
CERSAI detailsFile: DECLARATION FOR CERSAI.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BLDG NO 86.pdf17 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST DAMJI SIR.pdf17 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST DENESH SIR.pdf17 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Descosure Of Interest In Other Real Estate Organization Jaitin Shah.pdf17 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST VITAL SIR.pdf17 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST AMIT SIR.pdf17 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration Bank Account.pdf17 May 2024
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT AAKRUTI SOLITAIRE.pdf17 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS-1-7.pdf17 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS-8-14.pdf17 May 2024
Other - LegalFile: Non Negotiable Clauses.pdf17 May 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aakruti Solitaire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkopar east6,700+ in Mumbai Suburban

2 kmAakruti SolitaireCompleted 113Lapsed / revoked 65Other 103Dot size: filed unitsN

Filed coordinates, straight-line distance. 281 registered projects within 2 km.

Builder: Saptrishi Classic LLP

Saptrishi Classic LLP has 1 registration on MahaRERA, including Aakruti Solitaire. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Aakruti Solitaire is delayed beyond 1 Feb 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aakruti Solitaire?

The registered promoter entity is Saptrishi Classic LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aakruti Solitaire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aakruti Solitaire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aakruti Solitaire?

The professionals named in the filing: Architect: Amit Parab; Engineer: Paras Consultants; Engineer: RAJESH PATIL; Chartered Accountant: Mamta Sheth and Associates; Chartered Accountant: K R DHOLU AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aakruti Solitaire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aakruti Solitaire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aakruti Solitaire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.