Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 131 documents Report an error

AAKAR HEIGHTS is a Residential / Group Housing project by AAKAR CONSTRUCTIONS GROUP in Nagpur, Maharashtra, registered with MahaRERA as P50500019717 on 22 Feb 2019. The registration is recorded completed; possession was promised by 30 Mar 2025. 2 complaints are on record with the regulator.

At a glance

Project

  • NameAAKAR HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • Umred Road
    • BAHADURA
    • Nagpur (Rural)
    • Nagpur
    • 441204
  • Pincode441204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500019717
  • ReraGenie IDRG-MH-58449

Builder

  • NameAAKAR CONSTRUCTIONS GROUP
  • Entity typePartnership
  • GSTIN27ABAFA2769F1ZK
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersYUSUF NAJMUDDIN KANCHWALA, RAHUL LAHU DESHMUKH, Sonal Rahul Deshmukh, Najmuddin Hakimuddin Kanchwala
  • Other registrations1 more →
  • Completed1 of 2
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2019PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Feb 2019
  • Promised completion30 Mar 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed131 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AAKAR HEIGHTS - WING-ANA130000
AAKAR HEIGHTS - WING BNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

AAKAR HEIGHTS - WING-A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
AAKAR HEIGHTS - WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 28 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes98%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Layout Compound WallYes100%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered4
Open Space2
BuildingClosed/CoveredOpen SpaceTotal
AAKAR HEIGHTS - WING-A213
AAKAR HEIGHTS - WING B213

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,078 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Sau Sudha Madhukarrao PullarwarNagpur (M Corp.)Nagpur
USHA CHANDRASHEKHAR LACHARWARNagpur (M Corp.)Nagpur

Approvals and building plan

Permissible FSI7997.37
Proposed, not sanctioned7,997 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKINGSWAY NAGPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnjali Kadam
EngineerVijay Kadwe
EngineerAshok Mankawde
PartnerRole in project
AAKAR CONSTRUCTIONS GROUP-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12503301Chetan Gajanan KumbhareAAKAR CONSTRUCTIONS GROUP16/09/2025
CC12603153Meenakshi Chetan KumbhareAAKAR CONSTRUCTIONS GROUP27/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Mar 2024

Documents filed131

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: from-5 Aakar 1123.pdf28 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from-5 Aakar 1123.pdf28 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Declaration for part oc aakar.pdf18 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 aakar.pdf18 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: Declaration for part oc aakar.pdf18 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: aakar form 5 31-03-2023.pdf4 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC- AAKAR129 .pdf4 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: occupation certificate wing A (1).pdf4 Mar 2024
Disclosure of sold/ booked inventoryFile: Annexure 29 31-3-23.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: Annexure 29 30-06-2023.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: Annexure 29 30-11-23.pdf29 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30-11-2023.pdf14 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 31-03-2023.pdf14 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30-06-2023.pdf14 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30-11-2023.pdf14 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 31-03-2023.pdf14 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 30-11-2023.pdf14 Feb 2024
Certificates of CA (Form 3)File: 3_Form 3.pdf14 Feb 2024
Certificates of CA (Form 3)File: FORM 3 30-06-2023.pdf14 Feb 2024
Certificates of CA (Form 3)File: Form 3 30-11-2023.pdf14 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM-1 AAKAR CONSTRUCTION GROUP- ANJALI KADAM.pdf10 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AAKAR FORM1.pdf13 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AAKAR FORM2A.pdf13 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 WAVEARCH_30-09-22.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: wave arch form 1 architecture certificate 31_12-22.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sales_wing a 30_09_22.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30-06-21.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30_09-21.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 31_12-21.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 31_3_22.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30-06-22.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30_09-22.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 31_12-22.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: from 2A CERTIFICATE NO 12 31-03-22.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: Sales_b wing 31-12-21.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: Sales_b wing 31-03-22.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: Sales_wing a 30_06_22.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: Sales_b wing 30_6_2022.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: Sales_b wing 30_09_22.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: Sales_wing a 31-12-2022.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: Sales_wing a 31-12-2022.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: Sales_b wing 31_12-22.pdf16 Feb 2023
Certificates of CA (Form 3)File: Aakar Form 3_31-12-21.pdf14 Feb 2023
Certificates of CA (Form 3)File: Aakar Form 3_31-03-22.pdf14 Feb 2023
Certificates of CA (Form 3)File: Aakar Form 3_30-06-22.pdf14 Feb 2023
Certificates of CA (Form 3)File: Aakar Form 3 -30-09_22.pdf14 Feb 2023
Certificates of CA (Form 3)File: Aakar Form 3 31-12-22.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 aakar 21-22.pdf14 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Form 1 31-03-22 Correction.pdf17 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 WAVEARCH.pdf17 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificates.pdf17 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificates.pdf17 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 Engg.pdf17 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 3 CA certificate_31-03-20.pdf17 Aug 2022
Disclosure of sold/ booked inventoryFile: Sales Certificates A wing For 30_09_.pdf17 Aug 2022
Disclosure of sold/ booked inventoryFile: Sales Certificates A wing For 31_12_21 Aakar Heights.pdf17 Aug 2022
Disclosure of sold/ booked inventoryFile: Sales Certificates A_ B Wing For 31_03_22 Aakar Heights.pdf17 Aug 2022
Certificates of CA (Form 3)File: Form-03_30-06-19.pdf17 Aug 2022
Certificates of CA (Form 3)File: Form 3.pdf17 Aug 2022
Certificates of CA (Form 3)File: Form 3 CA certificate_31-12-19.pdf17 Aug 2022
Certificates of CA (Form 3)File: Form 3 CA certificate_31-03-20.pdf17 Aug 2022
Certificates of CA (Form 3)File: Form 3 CA certificate_30-06-20.pdf17 Aug 2022
Certificates of CA (Form 3)File: Form 3 CA certificate_30-09-20.pdf17 Aug 2022
Certificates of CA (Form 3)File: Form 3 CA certificate_31-12-20.pdf17 Aug 2022
Certificates of CA (Form 3)File: form -3_31-03-2021.pdf17 Aug 2022
Certificates of CA (Form 3)File: form-3_30-06-2021.pdf17 Aug 2022
Certificates of CA (Form 3)File: form -3_30-09-2021.pdf17 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20 Ay 2020-21.pdf17 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 31-03-2021.pdf17 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect 30-6-21.pdf25 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architech 30-09-21.pdf25 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architech 31-12-21.pdf25 May 2022
Form 2AFile: Form 2A 30-06-2020.pdf25 May 2022
Form 2AFile: Form 2A 30-09-2020.pdf25 May 2022
Form 2AFile: Form 2A - 30-12-2020.pdf25 May 2022
Form 2AFile: from 2A CERTIFICATE NO 9 30-06-21.pdf25 May 2022
Form 2AFile: from 2A CERTIFICATE NO 10 30-09-21.pdf25 May 2022
Form 2AFile: from 2A CERTIFICATE NO 12 31-03-22.pdf25 May 2022
Building plan approvalFile: Sheet 1.pdf20 Dec 2021

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AAKAR HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BAHADURA2,800+ in Nagpur

2 kmAAKAR HEIGHTSCompleted 3Lapsed / revoked 3Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: AAKAR CONSTRUCTIONS GROUP

AAKAR CONSTRUCTIONS GROUP has 2 registrations on MahaRERA, including AAKAR HEIGHTS and Aakar Park. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if AAKAR HEIGHTS is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AAKAR HEIGHTS?

The registered promoter entity is AAKAR CONSTRUCTIONS GROUP, a partnership as per the filing. Its GSTIN 27ABAFA2769F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AAKAR HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AAKAR HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AAKAR HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AAKAR HEIGHTS?

The professionals named in the filing: Architect: Anjali Kadam; Engineer: Vijay Kadwe; Engineer: Ashok Mankawde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AAKAR HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AAKAR HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AAKAR HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.