Home / Browse projects / Raigarh, Maharashtra / AADINATH HEIGHTS
AADINATH HEIGHTS
By Ess Gee Tradefin Private Limited
RG-MH-05857 · RERA P52000051214 · Last updated on MahaRERA portal: 1 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AADINATH HEIGHTS is a Others project by Ess Gee Tradefin Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000051214 on 8 Jun 2023. Possession is promised by 31 Dec 2029. 29 of the 62 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameAADINATH HEIGHTS
- TypeOthers
- Location
- Sector No- 53
- Dronagiri
- Uran
- Bokadvira
- Uran
- Raigarh
- 400702
- Pincode400702
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000051214
- ReraGenie IDRG-MH-05857
Builder
- NameEss Gee Tradefin Private Limited
- Entity typeCompany
- CINU18101AS1991PTC003558
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsRajesh Kumar Jawarilal Surana, Nitu Devi Surana
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Jun 2023
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed70 files
Current status
Figures as on 1 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AADINATH HEIGHTS | NA | 15 | 15 | 56 | 6 | 62 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
AADINATH HEIGHTS: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 25% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 30% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 20% |
| Electrical meter room, sub-station, receiving station | Yes | 30% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed84
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s. Booster Dealers Private Limited | Uran | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | amit n. patil architects and planners |
| Engineer | S K Consultants & Engineers |
| Engineer | Tenny George |
| Chartered Accountant | N B Sayed & Associates |
| Partner | Role in project |
|---|---|
| Ess Gee Tradefin Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: AADINATH HEIGHTS Form 2A 25-26.pdf | 1 Jul 2026 |
| Form 2A (FY 2023-2024)File: AADINATH HEIGHTS Form 2A 23-24.pdf | 30 Jun 2026 |
| Form 2A (FY 2024-2025)File: AADINATH HEIGHTS Form 2A 24-25.pdf | 30 Jun 2026 |
| Form 1File: Form 1 Aadinath heights as on 30-09-2025.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Aadinath heights as on 30-09-2025.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Aadinath heights as on 30-09-2025.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Aadinath heights as on 30-09-2025.pdf | 5 Jun 2026 |
| Form 1File: Form 1 Aadinath heights as on 31-12-2025.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Aadinath heights as on 31-12-2025.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Aadinath heights as on 31-12-2025.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Aadinath heights as on 31-12-2025.pdf | 5 Jun 2026 |
| Form 1File: Form 1 - Aadinath Heights March 2026.pdf | 5 Jun 2026 |
| Form 2File: Form 2 Aadinath heights as on 31-03-2026.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Aadinath heights as on 31-03-2026.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Aadinath Heights March 2026.pdf | 5 Jun 2026 |
| Form 1File: Form 1 Aadinath Heights as on June 2025.pdf | 20 Jul 2025 |
| Form 2File: Form 2 - Aadinath Heights as on June 2025.pdf | 20 Jul 2025 |
| Form 3File: Form 3 - Aadinath heights as on June 2025.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Aadinath heights as on June 2025.pdf | 20 Jul 2025 |
| Form 1 - Aadinath Heights as on March 2025 | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aadinath heights as on 31-03-2025.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aadinath Heights as on March 2025.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aadinath heights as on 31-12-2024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aadinath Heights as on 31-12-2024.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aadinath Heights as on Dec 2024.pdf | 13 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Aadinath Heights as on Dec 2024.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aadinath Heights (1).pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aadinath heights as on 30th Sept 2024.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aadinath Heights as on 30-09-2024.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aadinath Heights (1).pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aadinath Heights as on June 2024.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aadinath heights as on 30th June 2024_compressed.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29 Aadinath Heights as on March 2024.pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aadinath Heights as on March 2024.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aadinath heights as on 31st March 2024.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aadinath Heights as on March 2024.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aadinath Heights as on Dec 2023.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Format Form 3 Aadinath heights as on 31st Dec 2023.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aadinath Heights as on Dec 2023.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aadinath Heights as on June 2023.pdf | 27 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Aadinath Heights as on September 2023.pdf | 27 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Aadinath Heights as on September 2023.pdf | 12 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Aadinath Heights as on June 2023.pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 24 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: First Form 3 - Aadinath heights (2).pdf | 5 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow | 29 May 2023 |
| Copy of the legal title reportFile: Revised Short Title_Aadinath Heights_Ess Gee_24052023 (1)_11zon.pdf | 27 May 2023 |
| Proforma of Allotment letterFile: AL_adniatha_12052023.pdf | 27 May 2023 |
| Proforma of Agreement for saleFile: AFS_Aadinath Heights_25052023 (1).pdf | 27 May 2023 |
| PAN CardFile: ESS GEE PAN.pdf | 18 May 2023 |
| Building plan approvalFile: Plan1.pdf | 12 May 2023 |
| Building plan approvalFile: Plan- 234.pdf | 12 May 2023 |
| Layout approvalFile: Plan1.pdf | 12 May 2023 |
| Building plan approvalFile: Plan-56.pdf | 12 May 2023 |
| Copy of Layout Approval (in case of layout)File: Plan1.pdf | 12 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan1.pdf | 12 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan- 234.pdf | 12 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan-56.pdf | 12 May 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Finance.pdf | 11 May 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Legal.pdf | 11 May 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter - Finance.pdf | 11 May 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter - Legal.pdf | 11 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 11 May 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 11 May 2023 |
| Declaration in FORM BFile: Form B (Ess Gee).pdf | 11 May 2023 |
| CERSAI detailsFile: Cersai Declaration.pdf | 11 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: output.pdf | 11 May 2023 |
| Deviation Report with respect to Allotment letterFile: Allotment Letter AH.pdf | 11 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: Agreement For Sale AH.pdf | 11 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AADINATH HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dronagiri, Uran5,900+ in Raigarh
Filed coordinates, straight-line distance. 101 registered projects within 2 km.
VILLA ONE
Khodiyar Realtech LLP
Gami Bianca
LAL GEBI INFRA PRIVATE LIMITED
MAHAAVIR LABDHI PHASE 1
MAHAAVIR BUILDCON LLP
Siddhivinayak- Anaya
DIVYADRISHTI BUILDCON PRIVATE LIMITED
Horizon Landmark
GREENSCAPE KALPANA STRUCT CON
Grand Uran Central
Tycoons Altofin Realty
See every Raigarh project, with the district possession charts
Builder: Ess Gee Tradefin Private Limited
Ess Gee Tradefin Private Limited has 2 registrations on MahaRERA, including AADINATH HEIGHTS and Surana Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if AADINATH HEIGHTS is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AADINATH HEIGHTS?
The registered promoter entity is Ess Gee Tradefin Private Limited, a company as per the filing. Its CIN U18101AS1991PTC003558 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AADINATH HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AADINATH HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AADINATH HEIGHTS?
The professionals named in the filing: Architect: amit n. patil architects and planners; Engineer: S K Consultants & Engineers; Engineer: Tenny George; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AADINATH HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback