ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / A SINGAPORE LIFE CITY THE UTOPIA 1

Registered No litigation declared Residential / Group Housing project

A SINGAPORE LIFE CITY THE UTOPIA 1

By SANJEEV ASHOK JAISWAL

RG-MH-21907 · RERA P50500047034 · Last updated on MahaRERA portal: 27 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 98%
2 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

A SINGAPORE LIFE CITY THE UTOPIA 1 is a Residential / Group Housing project by SANJEEV ASHOK JAISWAL in Nagpur, Maharashtra, registered with MahaRERA as P50500047034 on 26 Sep 2022. Possession is promised by 24 Aug 2027. 56 of the 58 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NameA SINGAPORE LIFE CITY THE UTOPIA 1
  • TypeResidential / Group Housing
  • Location
    • GHOGLI SHANKARPUR ROAD
    • GOTADPANJRI
    • Gotal Panjari
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500047034
  • ReraGenie IDRG-MH-21907

Builder

  • NameSANJEEV ASHOK JAISWAL
  • Entity typeIndividual
  • Other registrations4 more →
  • Completed1 of 5
  • Declared earlier projects5 →

Key dates

this monthRegisteredSep 2022PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2022
  • Promised completion24 Aug 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed95 files

Current status

97%56 of 58 units booked
78.6%Work done, per cost certificate

Figures as on 27 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RESIDNETIAL BUILDING BLOCK ANA141448048
RESIDENTIAL BUILDING BLOCK B TENEMENTSNA33505
RESIDENTIAL BUILDING BLOCK C TENEMENTSNA33505

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 98%.

RESIDNETIAL BUILDING BLOCK A78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RESIDENTIAL BUILDING BLOCK B TENEMENTS78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RESIDENTIAL BUILDING BLOCK C TENEMENTS78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed172

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots172
Closed/Covered1
Open Space171
BuildingClosed/CoveredOpen SpaceTotal
RESIDNETIAL BUILDING BLOCK A1141142
RESIDENTIAL BUILDING BLOCK B TENEMENTS01515
RESIDENTIAL BUILDING BLOCK C TENEMENTS01515

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,565 sq m
Land owned byThe promoter
Named landownersNone
Declared on4 Jun 2025

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority
Permissible FSI7983.99
Proposed, not sanctioned7,984 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSITABULDI NAGPUR
Estimated costRs 18.25 cr
Cost incurredRs 14.34 cr
Work done78.56%
BuildingWingEstimatedIncurred
RESIDNETIAL BUILDING BLOCK ANARs 14.89 crRs 11.70 cr
RESIDENTIAL BUILDING BLOCK B TENEMENTSNARs 1.68 crRs 1.32 cr
RESIDENTIAL BUILDING BLOCK C TENEMENTSNARs 1.68 crRs 1.32 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSKA CONSORTIUM
EngineerPATANKAR & ASSOCIATES
EngineerASHLESH NAIK
Chartered AccountantRANJEET MISHRA
Chartered AccountantPUSHKRAJ SATHE
PartnerRole in project
SANJEEV ASHOK JAISWAL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 24 Aug 2027

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate March 2026 Utopia 1.pdf27 May 2026
Withdrawal Update Form 2File: Enggineer Certificate March 2026 Utopia 2.pdf27 May 2026
Withdrawal Update Form 3File: CA Certificate march 2026 Utopia 1.pdf27 May 2026
Withdrawal Update Form 1File: Architect Certificate December 2025.pdf13 Mar 2026
Withdrawal Update Form 2File: Enggineer Certifcate December 2025.pdf13 Mar 2026
Withdrawal Update Form 3File: CA Certificate December 2025.pdf13 Mar 2026
Withdrawal Update Form 1File: Architect Certificate September 2025.pdf6 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate September 2025.pdf6 Feb 2026
Withdrawal Update Form 3File: CA Certificate September 2025.pdf6 Feb 2026
Form 1File: Architect Certificate March 2025 Utopia1.pdf1 Aug 2025
Form 2File: Engineer Certificate march 2025 Utopia1.pdf1 Aug 2025
Form 3File: CACertificate March 2025 Utopia1.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory March 2025 Utopia1.pdf1 Aug 2025
Form 1File: Architect Certificate December 2024 Utopia1.pdf1 Aug 2025
Form 2File: Engineer Certificate December 2024 Utopia1.pdf1 Aug 2025
Form 3File: C A Certificate December 2024 Utopia1.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Declaration of Sold Unsold December 2024.pdf1 Aug 2025
Form 1File: Architech Certificate Sept 24.pdf1 Aug 2025
Form 2File: Engg Certifcate Sept 24.pdf1 Aug 2025
Form 3File: CA Certificate Sept 24.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure about sold inventory September 2024.pdf1 Aug 2025
Form 1File: Architech Certificate June 24.pdf1 Aug 2025
Form 2File: Engg Certificate June 24.pdf1 Aug 2025
Form 3File: CA Certificate June 24.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure about sold inventory June 2024.pdf1 Aug 2025
Withdrawal Update Form 1File: U1 AR Certificate Q3.pdf1 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate Utopia-1 June 2025.pdf1 Aug 2025
Withdrawal Update Form 3File: C A Certificate Utopia-1 June 2025.pdf1 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate December 2024 Utopia1.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2025 Utopia1.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate December 2024 Utopia1_compressed.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate March 2025 Utopia1_compressed.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate December 2024 Utopia1.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate march 2025 Utopia1.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Declaration of Sold Unsold December 2024.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory March 2025 Utopia1.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate March 24.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate June 24.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Sept 24.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 24.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 24.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept 24.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate March 24.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate June 24.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certifcate Sept 24.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure about sold inventory March 2024.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure about sold inventory June 2024.pdf7 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure about sold inventory September 2024.pdf7 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Uthopia 1 Form 5 FY 22-23.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: U1 AR Certificate Q1.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: U1 AR Cetificate Q2.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: U1 AR Certificate Q3.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: U1 Engg Certificate Q1.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: U1 Engg Certificate Q2.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: U1 Engg Certificate Q3.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure about Sold Inventory Q-1 FY 23-24.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure about Sold Inventory Q-2 FY 23-24.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure about Sold Inventory Q-3 FY 23-24.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: U1 CA Certificate Q1.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: U1 CA Certificate Q2.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: U1 CA Certificate Q3.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf13 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf13 Jun 2023
Disclosure of sold/ booked inventoryFile: Details of Stok Sold.pdf13 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate_compressed.pdf13 Jun 2023
Proforma of Allotment letterFile: Format of Agreement to Sale.pdf12 Sep 2022
Proforma of Allotment letterFile: Format of Allotment Letter.pdf12 Sep 2022
Deviation Report with respect to Allotment letterFile: No Deviation Report of Allotment Letter .pdf12 Sep 2022
Deviation Report with respect to model copy of AgreementFile: No Deviation Report of Agreement ot Sale.pdf12 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf7 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration in Format A.pdf30 Aug 2022
Building plan approvalFile: Building Map1.pdf25 Aug 2022
Building plan approvalFile: Building Map 2.pdf25 Aug 2022
Building plan approvalFile: Building Map 3.pdf25 Aug 2022
Building plan approvalFile: Building Map 4.pdf25 Aug 2022
Building plan approvalFile: Building Map 5.pdf25 Aug 2022
Building plan approvalFile: Building Map 6.pdf25 Aug 2022
Layout approvalFile: layout_sanction_map.pdf25 Aug 2022
PAN CardFile: PAN Sanjeev jaiswal.pdf25 Aug 2022
Copy of the legal title reportFile: Title Search Report.pdf25 Aug 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
A SINGAPORE LIFE CITY THE UTOPIA 3P50500056137MOUZA GOTADPANJRI, Nagpur56May 2024Certificate SignedApr 2029Not due yet
A SINGAPORE LIFE CITY THE UTOPIA 4P50500066460GOTADPANJRI, NAGPUR, Nagpur42Jun 2024Certificate SignedMar 2029Not due yet
A SINGAPORE LIFE CITY THE UTOPIA 2P50500048457GOTADANJRI, NAGPUR, Nagpur56Jan 2023Certificate SignedNov 2027Not due yet
SINGAPORE LIFE CITYGOTAD PANJRI NAGPUR88-CompletedOct 2019Oct 2019

How this compares with Nagpur

97%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep A SINGAPORE LIFE CITY THE UTOPIA 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOTADPANJRI2,800+ in Nagpur

2 kmA SINGAPORE LIFE CITY THCompleted 12Lapsed / revoked 13Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 69 registered projects within 2 km.

Builder: SANJEEV ASHOK JAISWAL

SANJEEV ASHOK JAISWAL has 5 registrations on MahaRERA, including A SINGAPORE LIFE CITY THE MILLENNIUM and A SINGAPORE LIFE CITY THE UTOPIA 1. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if A SINGAPORE LIFE CITY THE UTOPIA 1 is delayed beyond 24 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of A SINGAPORE LIFE CITY THE UTOPIA 1?

The registered promoter entity is SANJEEV ASHOK JAISWAL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in A SINGAPORE LIFE CITY THE UTOPIA 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for A SINGAPORE LIFE CITY THE UTOPIA 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at A SINGAPORE LIFE CITY THE UTOPIA 1?

The professionals named in the filing: Architect: SKA CONSORTIUM; Engineer: PATANKAR & ASSOCIATES; Engineer: ASHLESH NAIK; Chartered Accountant: RANJEET MISHRA; Chartered Accountant: PUSHKRAJ SATHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in A SINGAPORE LIFE CITY THE UTOPIA 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About A SINGAPORE LIFE CITY THE UTOPIA 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save A SINGAPORE LIFE CITY THE UTOPIA 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.