ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / A R IMPERIA

Completed No litigation declared Residential / Group Housing project

A R IMPERIA

By A R REALTY

RG-MH-23095 · RERA P52100032942 · Last updated on MahaRERA portal: 5 Jan 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
14 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 95%
0 of 86Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 176 documents Report an error

A R IMPERIA is a Residential / Group Housing project by A R REALTY in Pune, Maharashtra, registered with MahaRERA as P52100032942 on 2 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2024. 86 of the 86 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameA R IMPERIA
  • TypeResidential / Group Housing
  • Location
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032942
  • ReraGenie IDRG-MH-23095

Builder

  • NameA R REALTY
  • Entity typePartnership
  • PartnerSANJAY GOBINDRAM RAMCHANDANI
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredFeb 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Feb 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed176 files

Current status

100%86 of 86 units booked

Figures as on 5 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA111142042
B BUILDINGNA111144044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

A BUILDING79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
B BUILDING79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 5 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered25
BuildingClosed/CoveredTotal
A BUILDING1212
B BUILDING1313

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,250 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jan 2026

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI8012.14
Proposed, not sanctioned8,012 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPLE SAUDAGAR PUNE

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN SUTAR SUTAR
EngineerMR SIDDHARTH GALGALE
EngineerDhanaji Dattatray Shinde
Chartered AccountantRAVI TALREJA AND ASSOCIATES TALREJA
Chartered AccountantRavi Talreja
PartnerRole in project
A R REALTY-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12400284Avishkar Bajrang ChendgeA R REALTY30/09/2024
CC12400283ROSHAN RAJKUMAR YADAVA R REALTY30/09/2024
CC12400285TUSHAR SADASHIV KASTUREA R REALTY30/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed176

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 176 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: F1.pdf5 Jan 2026
Form 2File: F2.pdf5 Jan 2026
Form 3File: Form 3.pdf5 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf5 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A (51) (2) (1).pdf5 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25 (1).pdf5 Jan 2026
Occupational CertificateFile: Compilation certificate.pdf5 Jan 2026
Occupational CertificateFile: Completion-Certificate-Verification-For-RERA-Application-No-P52100032942-engg-arrealty21-g5 Jan 2026
Occupational CertificateFile: Form 4.pdf5 Jan 2026
Form 2A (FY 2021-2022)File: 21-22.pdf30 Aug 2025
Form 2A (FY 2022-2023)File: 22-23.pdf30 Aug 2025
Form 2A (FY 2023-2024)File: 23-24.pdf30 Aug 2025
Form 1File: F1.pdf18 Aug 2025
Form 2File: F2.pdf18 Aug 2025
Form 3File: F3.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: SU.pdf18 Aug 2025
Form 5 (FY 2021-2022)File: 21-22.pdf13 Aug 2025
Form 5 (FY 2022-2023)File: 22-23.pdf13 Aug 2025
Form 5 (FY 2023-2024)File: 23-24.pdf13 Aug 2025
Form 1File: form 1.pdf7 Aug 2025
Form 2File: F2.pdf7 Aug 2025
Form 3File: F3.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf7 Aug 2025
Form 1File: F1.pdf28 Jul 2025
Form 2File: F2.pdf28 Jul 2025
Form 3File: F3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: SU.pdf28 Jul 2025
Form 1File: F1.pdf26 Jul 2025
Form 2File: F2.pdf26 Jul 2025
Form 3File: F3.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: SU.pdf26 Jul 2025
Form 1File: F1.pdf26 Jul 2025
Form 2File: F2.pdf26 Jul 2025
Form 3File: F3.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: SU.pdf26 Jul 2025
Form 1File: F1 (6).pdf11 Jul 2025
Form 2File: F2 (3).pdf11 Jul 2025
Form 3File: F3 (1).pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SU.pdf11 Jul 2025
Form 1File: F1.pdf11 Jul 2025
Form 2File: F2.pdf11 Jul 2025
Form 3File: F3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SU.pdf11 Jul 2025
Form 1File: F1.pdf11 Jul 2025
Form 2File: F2.pdf11 Jul 2025
Form 3File: F3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SU.pdf11 Jul 2025
Form 1File: F1.pdf11 Jul 2025
Form 2File: F2.pdf11 Jul 2025
Form 3File: F3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SU.pdf11 Jul 2025
Form 1File: F1.pdf11 Jul 2025
Form 2File: F2.pdf11 Jul 2025
Form 3File: F3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SU.pdf11 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Crtificate.pdf13 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A(2021-2022)(Imperia)001.pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A(2023-2024)(Imperia)001.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -.pdf21 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect Completion Certificate.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AR Imperia Engineer's Certificate_001.pdf21 Oct 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: signed F1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed F2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: AR IMPERIA INVENTORY.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: signed sold unsold.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed f3.pdf20 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Report CA Crtificate.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Stamp.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf23 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE AR IMPERIA.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1.pdf23 Jan 2024
Disclosure of sold/ booked inventoryFile: sold Inventory AR imperia (1).pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 01 2024 (1).pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: AR Imperial.pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: f3.pdf1 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (2).pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: IMG_20231002_0005.pdf16 Oct 2023

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep A R IMPERIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

2 kmA R IMPERIACompleted 52Lapsed / revoked 32Other 61Dot size: filed unitsN

Filed coordinates, straight-line distance. 145 registered projects within 2 km.

Builder: A R REALTY

A R REALTY has 2 registrations on MahaRERA, including A R IMPERIA and A R ATLAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if A R IMPERIA is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of A R IMPERIA?

The registered promoter entity is A R REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in A R IMPERIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against A R IMPERIA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for A R IMPERIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at A R IMPERIA?

The professionals named in the filing: Architect: SACHIN SUTAR SUTAR; Engineer: MR SIDDHARTH GALGALE; Engineer: Dhanaji Dattatray Shinde; Chartered Accountant: RAVI TALREJA AND ASSOCIATES TALREJA; Chartered Accountant: Ravi Talreja. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in A R IMPERIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About A R IMPERIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save A R IMPERIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.