Home / Browse projects / Thane, Maharashtra / A H Sapphire

Registered No litigation declared Residential / Group Housing project

A H Sapphire

By A.H. Constructions

RG-MH-28594 · RERA P51700026430 · Last updated on MahaRERA portal: 27 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 42 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 42 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 82%
17 of 120Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

A H Sapphire is a Residential / Group Housing project by A.H. Constructions in Thane, Maharashtra, registered with MahaRERA as P51700026430 on 20 Sep 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 42 months from the original filing. 103 of the 120 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameA H Sapphire
  • TypeResidential / Group Housing
  • Location
    • Mahajanwadi
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700026430
  • ReraGenie IDRG-MH-28594

Builder

  • NameA.H. Constructions
  • Entity typePartnership
  • GSTIN27AAMFA0867B1ZN
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAhmed Hussain Mehboob Qureshi, Jamil Ahmed Hussain Qureshi
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2020First promiseJun 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Sep 2020
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed107 files

Current status

86%103 of 120 units booked
90.7%Work done, per cost certificate

Figures as on 27 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A H SapphireNA151410614120

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 82%.

A H Sapphire: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure82%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises74%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks66%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.63%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.64%

Progress on shared amenities15

As on 27 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes92%
Storm Water DrainsYes88%
Landscaping & Tree PlantingYes87%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes86%
Solid Waste Management And DisposalYes86%
Water conservation /Rain water harvestingYes86%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes87%
Electrical meter room, sub-station, receiving stationYes99%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Closed/Covered37

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,878 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMira-Bhayandar (M Corp)
Permissible FSI4675.0
Proposed, not sanctioned2,875 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop 1 and 2 Ayesha Tower S V Road Jogeshwari West Mumbai
Estimated costRs 53.78 cr
Cost incurredRs 48.77 cr
Work done90.69%
BuildingWingEstimatedIncurred
A H SapphireNARs 40.34 crRs 36.58 cr
-NARs 13.45 crRs 12.19 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTej's' Consultants
ArchitectTEJS CONSULTANTS
EngineerFrames
EngineerSTRUBUILD CONSULTANTS LLP
Chartered AccountantRamesh Batham
Chartered AccountantSAYED & ASSOCIATES
Chartered AccountantMANISH VORA & CO.
PartnerRole in project
A.H. Constructions-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700022955Jun 2024 → Jun 2025

Reason as filed by the promoterWe need extension on the project as we have received further CC upto 14 Floors. Previously it was for 7 floors. So to develop the project completely and get OC we need extended time. kindly find the attached further CC.

EA28062501842Jun 2024 → Dec 2027

Reason as filed by the promoterThe project was unable to be finished on schedule because of the time needed to construct the Extended FSI and CC obtained from 14 stories to 26 levels. We kindly ask that you grant us an extension till December 31, 2027

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600352Bhakti AchrekarA.H. Constructions25/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A (2025-2026) A H Sapphire.pdf27 Aug 2026
Withdrawal Update Form 1File: Form 1 A H Sapphire June 2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 A H Sapphire June 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 A H Sapphire June 2026.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 A H Sapphire Mar 2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 A H Sapphire Mar 2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 A H Sapphire Mar 2026.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 A H Sapphire Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 A H Sapphire Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form3 - CA Certificate Dec 2025 A H Sapphire.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 A H Sapphire Sept 2025.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 A H Sapphire Sept 2025.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3 A H Sapphire Sept 2025.pdf20 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A A H Sapphire FY 24-25.pdf20 Oct 2025
Form 2A (FY 2023-2024)File: Form 2A A H Sapphire FY 23-24.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 A H Sapphire - FY 24-25 Manish.pdf17 Oct 2025
Building plan approvalFile: LAST APPROVED PLAN.pdf27 Sep 2025
Withdrawal Update Form 1File: FORM 1 - 30-06-2025.pdf13 Sep 2025
Withdrawal Update Form 2File: FORM 2 - 30-06-2025.pdf13 Sep 2025
Withdrawal Update Form 3File: FORM 3 - 30-06-2025.pdf13 Sep 2025
Form 5 (FY 2020-2021)File: FORM 5 - 2020-21.pdf9 Sep 2025
Form 5 (FY 2021-2022)File: FORM 5 - 21-22.pdf9 Sep 2025
Form 5 (FY 2023-2024)File: FORM 5 - 2023-24.pdf9 Sep 2025
Form 1File: form 1.pdf27 Jun 2025
Form 2File: form 2.pdf27 Jun 2025
Form 3File: form 3.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventories.pdf27 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE MARCH.pdf21 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 (FY23-24) - A H SAPPHIRE.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE SEPT.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DEC.pdf17 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE MARCH.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: QPR Sapphire Form 3 - Sep 2024 (1).pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: QPR Sapphire Form 3 - Dec 2024.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: QPR Sapphire Form 3 - Mar 2025.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QPR Sapphire Form 1 - Sep 2024.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QPR Sapphire Form 1 - Dec 2024.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QPR Sapphire Form 1 - Mar 2025.pdf12 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QPR Sapphire Form 2 - Sep 2024.pdf12 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QPR Sapphire Form 2 - Dec 2024.pdf12 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QPR Sapphire Form 2 - Mar 2025.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED CA MARCH 1.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed CA JUNE.pdf15 Jul 2024
Layout approvalFile: plan 1.pdf9 Jul 2024
Building plan approvalFile: plan 2.pdf9 Jul 2024
Building plan approvalFile: plan 3.pdf9 Jul 2024
Copy of Layout Approval (in case of layout)File: plan 1.pdf9 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 2.pdf9 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 3.pdf9 Jul 2024
Disclosure of sold/ booked inventoryFile: 2.pdf9 Jul 2024
Disclosure of sold/ booked inventoryFile: 1 (2).pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -MARCH 24.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - JUNE 24.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -MARCH 24.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: june 24 ca (1).pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22.pdf9 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec 20.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec 21.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec 22.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: march 23.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: june 23.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sept 23.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec 23.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: march 24.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: june 24.pdf1 Jul 2024
PAN CardFile: A H construction Pan card_1.pdf29 Jun 2024
Details of encumbrances concerned to FinanceFile: LEGAL LETTER.pdf29 Jun 2024
Details of encumbrances concerned to LegalFile: LEGAL LETTER.pdf29 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: new cc.pdf29 Jun 2024
Declaration about Commencement CertificateFile: DECLARATION CC.pdf29 Jun 2024
Declaration in FORM BFile: from b.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 dec 20.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31 dec 21.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 dec 22.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31 mar 23.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 june 23.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 sept 23.pdf29 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
A H HeritageJVPD Vileparle scheme42CompletedNov 2008Late, Feb 2009

How this compares with Thane

86%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 42 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep A H Sapphire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahajanwadi7,600+ in Thane

2 kmA H SapphireCompleted 17Lapsed / revoked 13Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: A.H. Constructions

A.H. Constructions has 3 registrations on MahaRERA, including A. H. Heights and A H Sapphire. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if A H Sapphire is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of A H Sapphire?

The registered promoter entity is A.H. Constructions, a partnership as per the filing. Its GSTIN 27AAMFA0867B1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in A H Sapphire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against A H Sapphire?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for A H Sapphire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at A H Sapphire?

The professionals named in the filing: Architect: Tej's' Consultants; Architect: TEJS CONSULTANTS; Engineer: Frames; Engineer: STRUBUILD CONSULTANTS LLP; Chartered Accountant: Ramesh Batham; Chartered Accountant: SAYED & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in A H Sapphire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About A H Sapphire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save A H Sapphire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.