9PBR TOWER B2
By MISTRY CONSTRUCTION CO. PVT. LTD.
RG-MH-93905 · RERA P51700033690 · Last updated on MahaRERA portal: 7 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
- 1 complaint at MahaRERA
- Rs 325.00 crore secured on the land, in favour of INDUSIND BANK
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
9PBR TOWER B2 is a Residential / Group Housing project by MISTRY CONSTRUCTION CO. PVT. LTD. in Thane, Maharashtra, registered with MahaRERA as P51700033690 on 2 Mar 2022. Possession is promised by 31 Dec 2028. 37 of the 48 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- Name9PBR TOWER B2
- TypeResidential / Group Housing
- Location
- PALM BEACH ROAD
- NERUL
- Navi Mumbai (M Corp.)
- Thane
- 400706
- Pincode400706
- RERA no.P51700033690
- ReraGenie IDRG-MH-93905
Builder
- NameMISTRY CONSTRUCTION CO. PVT. LTD.
- Entity typeCompany
- GSTIN27AAACM7659Q1ZM
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsJAGDISH MISTRY, MEHUL JAGDISH MISTRY
- Other registrations4 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Mar 2022
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed144 files
Current status
Figures as on 7 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER B2 | NA | 13 | 9 | 48 | 0 | 48 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
TOWER B2: 45% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 37% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TOWER B2 | NA | Rs 47.29 cr | Rs 35.00 cr |
| - | NA | Rs 3.03 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dimensions Architect Private Limited |
| Engineer | Sudhir Kulkarni |
| Engineer | Ramprasad R |
| Chartered Accountant | B R Nagda & Co |
| Chartered Accountant | Janak Majethia & Associates |
| Partner | Role in project |
|---|---|
| MISTRY CONSTRUCTION CO. PVT. LTD. | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 168/2022 | High Court | Ongoing |
| 190/2023 | City Civil Court | Ongoing |
| 29893/2022 | Bombay High Court | Closed |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000429530 | Helen Ruby Emerson Anthony | MISTRY CONSTRUCTION CO. PVT. LTD. | 22/03/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed144
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 144 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_9 PBR T B2_Mar 26.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: Form 2_9 PBR T B2_Mar 26.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: Form 3_9 PBR T B2_Mar 26.pdf | 7 May 2026 |
| Form 1File: Form 1_9PBR B2_Dec25.pdf | 16 Feb 2026 |
| Form 2File: Form 2_9PBR B2_Dec25.pdf | 16 Feb 2026 |
| Form 3File: Form 3_9PBR B2_Dec25.pdf | 16 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold_Unsold_Booked Inventory_9PBR B2_Dec25.pdf | 16 Feb 2026 |
| Form 1File: 9pbrB2Form1_Sept_2025.pdf | 5 Dec 2025 |
| Form 2File: 9pbrB2Form2_Sept_2025.pdf | 5 Dec 2025 |
| Form 3File: 9pbrB2Form3_Sept_2025..pdf | 5 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 9pbrB2_Sold_Unsold_inventory_Sept_2025.pdf | 5 Dec 2025 |
| Form 5 (FY 2024-2025)File: 9pbrB2Form5.pdf | 26 Sep 2025 |
| Form 1File: 9pbrB2Form1.pdf | 18 Aug 2025 |
| Form 2File: 9pbrB2Form2.pdf | 18 Aug 2025 |
| Form 3File: 9pbrB2Form3.pdf | 18 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 9pbrB2Sold or Booked or unsold.pdf | 18 Aug 2025 |
| Form 1File: 10-Form-1 Project 9PBR Tower - 6 B2.pdf | 3 Jun 2025 |
| Form 2File: Form-02 Tower-B2.pdf | 3 Jun 2025 |
| Form 3File: FORM 3 9PBR TOWER_B2_RERA CERTIFICATE.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold B2.pdf | 3 Jun 2025 |
| OthersFile: Form 2A Q124-25 -B2.pdf | 3 Jun 2025 |
| Form 1File: Form 1 ( From Architect ) Project 9 PBR Tower B2.pdf | 3 Jun 2025 |
| Form 2File: Form 2 - Project 9 PBR Tower B2.pdf | 3 Jun 2025 |
| Form 3File: Form 3- Project 9 PBR Tower B2.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory - Tower B2.pdf | 3 Jun 2025 |
| Form 1File: Form 1 - 9 PBR Tower B2.pdf | 3 Jun 2025 |
| Form 2File: 9PBR Tower B2 - Form 2.pdf | 3 Jun 2025 |
| Form 3File: Form 3 - 9 PBR Tower B2 - 30 Sept 2024.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory - 9 PBR Tower B2.pdf | 3 Jun 2025 |
| OthersFile: Form 5 - Annexure F- Tower B2.pdf | 3 Jun 2025 |
| Form 1File: Form 1 -Tower B2 - March 2025.pdf | 31 May 2025 |
| Form 2File: Form 2- Tower B2 - March 2025.pdf | 31 May 2025 |
| Form 3File: Form 3-Tower B2 - March 2025.pdf | 31 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Tower B2 - Sold Unsold Inventory - March 2025.pdf | 31 May 2025 |
| OthersFile: Form 2A- Tower B2 - March 2025.pdf | 31 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Tower B2.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Tower B2.pdf | 2 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Tower B2.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Tower B2 - Sold Unsold Inventory.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ( From Architect ) Project 9 PBR Tower B2.pdf | 14 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Project 9 PBR Tower B2.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Project 9 PBR Tower B2.pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Tower B2.pdf | 14 Feb 2025 |
| Declaration in FORM BFile: 9PBR BR.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9PBR Tower B2 - Form 2.pdf | 9 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 9 PBR Tower B2 - 30 Sept 2024.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 9 PBR Tower B2.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory - 9 PBR Tower B2.pdf | 6 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Annexure F- Tower B2.pdf | 6 Dec 2024 |
| Details of encumbrancesFile: B2 Fin.pdf | 12 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: B2 Legal.pdf | 12 Aug 2024 |
| Details of encumbrances concerned to LegalFile: B2 Legal.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold B2.pdf | 31 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B2.pdf | 29 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 9PBR Towar - B2_Rera Certificate.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-02 Tower-B2.pdf | 23 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q124-25 -B2.pdf | 23 Jul 2024 |
| Proforma of Agreement for saleFile: B2.pdf | 1 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - B2.pdf | 26 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold B2.pdf | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 B2 Tower.pdf | 22 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Tower-B2 Form-2A.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower 6 B2 - Form 1.PDF | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 9PBR T6.PDF | 17 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certi B2.pdf | 6 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QA certi of B2.pdf | 6 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: 9PBR Tower B2 Sold Unsold December 2024.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOWER B2 Final Form 3.pdf | 22 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Tower B2 Jun 23 sold unsold.pdf | 11 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: 9PBR TOWER B2 Disclosure sold book inventory Sep 23.pdf | 11 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Project 9PBR Tower B2 04072023.pdf | 21 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Tower C1 11102023.pdf | 21 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 B2 MCCPL Sep 23.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Tower B2 Mar 22 sold unsold.pdf | 5 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Tower B2 Jun 22 sold unsold.pdf | 5 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Tower B2 Sep 22 sold unsold.pdf | 5 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Tower B2 Dec 22 sold unsold.pdf | 5 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Tower B2 March 23 sold unsold.pdf | 5 Oct 2023 |
| CERSAI detailsFile: Tower B2 Jun 23 sold unsold.pdf | 5 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Tower B2.pdf | 5 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 144 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 9PBR TOWER B2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NERUL7,600+ in Thane
NMS Gami Palm Amore
VISION INFRA LLP
DELTA PALMBEACH
BALAJI CORPORATION
Cyber Square - 1
GREENSCAPE IT PARK LLP
Shreeji Destiny NX
Kasturi Hotels Private Limited
24 HIGH
DREAM APEX REALTIES LIMITED
DELTA STELLAR
NOBLE ORGANICS PVT. LTD.
See every Thane project, with the district possession charts
Builder: MISTRY CONSTRUCTION CO. PVT. LTD.
MISTRY CONSTRUCTION CO. PVT. LTD. has 5 registrations on MahaRERA, including INFINITE RESIDENCY and 9PBR TOWER B1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if 9PBR TOWER B2 is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 9PBR TOWER B2?
The registered promoter entity is MISTRY CONSTRUCTION CO. PVT. LTD., a company as per the filing. Its GSTIN 27AAACM7659Q1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 9PBR TOWER B2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against 9PBR TOWER B2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for 9PBR TOWER B2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 9PBR TOWER B2?
The professionals named in the filing: Architect: Dimensions Architect Private Limited; Engineer: Sudhir Kulkarni; Engineer: Ramprasad R; Chartered Accountant: B R Nagda & Co; Chartered Accountant: Janak Majethia & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 9PBR TOWER B2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback