Home / Browse projects / Thane, Maharashtra / 9PBR TOWER B1

Registered Litigation declared Residential / Group Housing project

9PBR TOWER B1

By MISTRY CONSTRUCTION CO. PVT. LTD.

RG-MH-37922 · RERA P51700032812 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • Rs 325.00 crore secured on the land, in favour of INDUSIND BANK

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 90%
11 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 142 documents Report an error

9PBR TOWER B1 is a Residential / Group Housing project by MISTRY CONSTRUCTION CO. PVT. LTD. in Thane, Maharashtra, registered with MahaRERA as P51700032812 on 2 Feb 2022. Possession is promised by 31 Dec 2028. 43 of the 54 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • Name9PBR TOWER B1
  • TypeResidential / Group Housing
  • Location
    • PALM BEACH ROAD
    • NERUL
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700032812
  • ReraGenie IDRG-MH-37922

Builder

  • NameMISTRY CONSTRUCTION CO. PVT. LTD.
  • Entity typeCompany
  • GSTIN27AAACM7659Q1ZM
  • DirectorsJAGDISH MISTRY, MEHUL JAGDISH MISTRY
  • Other registrations4 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed142 files

Current status

80%43 of 54 units booked
63.7%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER B1NA141054054

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

TOWER B1: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)90%
Plinth90%
Stilt Floor90%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises31%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area932 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofINDUSIND BANK
Secured amountRs 325.00 crore
Declared on17 May 2025

Approvals and building plan

Sanctioning authorityCIDCO - City And Industrial Development Corporation
Permissible FSI10324.22
Proposed, not sanctioned6,109 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSENAPATI BAPAT MARG LOWER PAREL WEST MUMBAI
Estimated costRs 62.20 cr
Cost incurredRs 39.62 cr
Work done63.7%
BuildingWingEstimatedIncurred
TOWER B1NARs 59.32 crRs 39.62 cr
-NARs 2.88 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDimensions Architect Private Limited
EngineerSudhir Kulkarni
EngineerRamprasad R
Chartered AccountantJanak Majethia & Associates
Chartered AccountantB R Nagda & Co
PartnerRole in project
MISTRY CONSTRUCTION CO. PVT. LTD.-

Litigation declared4

CaseCourtStatus
190/2023City Civil Court BelapurOngoing
168/2022BOMBAY HIGH COURTOngoing
190/2023City Civil CourtOngoing
29893/2022Bombay High CourtClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed142

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_9 PBR T B1_Mar 26.pdf7 May 2026
Withdrawal Update Form 2File: Form 2_9 PBR T B1_Mar 26.pdf7 May 2026
Withdrawal Update Form 3File: Form 3_9 PBR T B1_Mar 26.pdf7 May 2026
Form 1File: Form 1_9 PBR B1_Dec25.pdf19 Feb 2026
Form 2File: Form 2_9PBR B1_Dec25 .pdf19 Feb 2026
Form 3File: Form 3_9PBR B1_Dec25.pdf19 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold_Unsold_Booked Inventory_9PBR B1_Dec25.pdf19 Feb 2026
Form 1File: 9pbrB1Form1_Sept_2025.pdf5 Dec 2025
Form 2File: 9pbrB1Form2_Sept_2025.pdf5 Dec 2025
Form 3File: 9pbrB1Form3_Sept_2025.pdf5 Dec 2025
Disclosure of Sold and Booked InventoryFile: 9pbrB1_Sold_Unsold_inventory_Sept_2025.pdf5 Dec 2025
Form 5 (FY 2024-2025)File: 9pbrB1Form5.pdf26 Sep 2025
Form 1File: 9pbrB1Form1.pdf18 Aug 2025
Form 2File: 9pbrB1Form2.pdf18 Aug 2025
Form 3File: 9pbrB1Form3.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: 9pbrB1Sold or Booked or unsold.pdf18 Aug 2025
Form 1File: Form 1 ( From Architect ) Project 9PBR Tower 5 B-1.pdf3 Jun 2025
Form 2File: Form 2 - Project 9PBR Tower 5 B-1.pdf3 Jun 2025
Form 3File: Form 3 - Project 9PBR Tower B-1.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf3 Jun 2025
Form 1File: Form 1 - 9 PBR - Tower B1.pdf3 Jun 2025
Form 2File: 9PBR Tower B1 - Form 2.pdf3 Jun 2025
Form 3File: Form 3 - Tower B1.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold-Usold Inventory - 9 PBR - Tower B1 - 30th Sept 2024.pdf3 Jun 2025
OthersFile: Form 5 - Annexure F- Tower B1.pdf3 Jun 2025
Form 1File: 10-Form-1 B1 Project 9PBR Tower -5 B-1.pdf3 Jun 2025
Form 2File: Form-02 Tower-B1.pdf3 Jun 2025
Form 3File: FORM 3 9PBR TOWER_B1_RERA CERTIFICATE.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold B1.pdf3 Jun 2025
OthersFile: Form 2A Q124-25 -B1.pdf3 Jun 2025
Form 1File: Form 1 - Tower B1 March 2025.pdf14 May 2025
Form 2File: Form 2- Tower B1 March 2025.pdf14 May 2025
Form 3File: Form 3 - Tower B1 March 2025.pdf14 May 2025
Disclosure of Sold and Booked InventoryFile: Tower B1 - Sold Unsold Inventory March 2025.pdf14 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Tower B1.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Tower B1.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Tower B1.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Tower B1 - Sold Unsold Inventory.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ( From Architect ) Project 9PBR Tower 5 B-1.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Project 9PBR Tower B-1.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Project 9PBR Tower 5 B-1.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf14 Feb 2025
Declaration in FORM BFile: 9PBR BR.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9PBR Tower B1 - Form 2.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Tower B1.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 9 PBR - Tower B1.pdf6 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold-Usold Inventory - 9 PBR - Tower B1 - 30th Sept 2024.pdf6 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Annexure F- Tower B1 - 25th Oct 2024.pdf6 Dec 2024
Details of encumbrancesFile: B1 Fin.pdf12 Aug 2024
Details of encumbrances concerned to FinanceFile: B1 Legal.pdf12 Aug 2024
Details of encumbrances concerned to LegalFile: B1 Legal.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold B1.pdf31 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B1.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 9PBR Towar - B1_Rera Certificate.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-02 Tower-B1.pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q124-25 -B1.pdf23 Jul 2024
Proforma of Agreement for saleFile: 3 Proforma of Allotment letter.pdf1 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - B1.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold B1.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 B1 Tower.pdf22 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Tower-B1 Form-2A.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower 5 B1 - Form 1.PDF16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 9PBR T5.pdf17 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certi B1.pdf6 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QA certi of B1.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: 9PBR Tower B1 Sold Unsold December 2024.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOWER B1 Final Form 3.pdf22 Jan 2024
Disclosure of sold/ booked inventoryFile: 9PBR TOWER B1 Disclosure sold book inventory Sep 23.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 9PBR Tower B1 11102023.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 B1MCCPL Sep 23.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Tower B1 Mar 22 sold unsold.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: Tower B1 June 22 sold unsold.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: Tower B1 Sep 22 sold unsold.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: Tower B1 Dec 22 sold unsold.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: Tower B1 Mar 23 sold unsold.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: Tower B1 June 23 sold unsold.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5 Tower B1.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: fORM 5 Tower B1.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 9PBR June 23 Tower B1.pdf31 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower B1.pdf31 Aug 2023

How this compares with Thane

80%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 9PBR TOWER B1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NERUL7,600+ in Thane

2 km9PBR TOWER B1Completed 36Lapsed / revoked 14Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 74 registered projects within 2 km.

Builder: MISTRY CONSTRUCTION CO. PVT. LTD.

MISTRY CONSTRUCTION CO. PVT. LTD. has 5 registrations on MahaRERA, including INFINITE RESIDENCY and 9PBR TOWER B1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if 9PBR TOWER B1 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 9PBR TOWER B1?

The registered promoter entity is MISTRY CONSTRUCTION CO. PVT. LTD., a company as per the filing. Its GSTIN 27AAACM7659Q1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 9PBR TOWER B1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 9PBR TOWER B1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 9PBR TOWER B1?

The professionals named in the filing: Architect: Dimensions Architect Private Limited; Engineer: Sudhir Kulkarni; Engineer: Ramprasad R; Chartered Accountant: Janak Majethia & Associates; Chartered Accountant: B R Nagda & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 9PBR TOWER B1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 9PBR TOWER B1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 9PBR TOWER B1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.